East Texas has quietly become a more active market for modular and containerized IT infrastructure. Bitcoin mining operators, telecommunications providers, oilfield service companies and edge-computing deployments have all found reasons to install prefabricated data center modules in and around Tyler, taking advantage of available industrial land, regional power infrastructure and the city’s position along the Interstate 20 corridor. Those same modules eventually reach the end of a lease, a business plan, a hosting contract or a useful equipment life, and someone has to deal with what’s left standing on the pad.
USA Decom works with organizations that need a modular or containerized data center system removed, decommissioned, relocated or responsibly disposed of. Whether the project involves a single containerized IT pod supporting an edge deployment, a multi-module power and cooling skid supporting a mining operation, or a larger prefabricated white space system tied to a telecom or enterprise footprint, the underlying challenge is the same: the module has to be de-energized, disconnected, disassembled or rigged for transport, and moved off the property in a way that protects the site, the surrounding operation and any equipment worth recovering.
Why Modular Data Center Projects Come Up in This Market
Modular infrastructure gets deployed for reasons that don’t always match the reasons it eventually gets removed. A module installed to support a short-term hosting contract, a temporary computing need tied to oilfield or agricultural operations, or a cryptocurrency mining venture often has a defined operating window from the start. When that window closes, or when the underlying business changes direction, the physical hardware doesn’t disappear on its own.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Tyler’s economy has historically centered on agribusiness, energy, health services, manufacturing, and transportation and logistics, and the city’s position on I-20 has made it a natural staging point for equipment and freight moving across East Texas. That same infrastructure and available industrial land has also attracted newer, more power-intensive uses. Data center and computing infrastructure development in this region doesn’t always take the form of a large, purpose-built facility on a rural site; existing commercial buildings, repurposed structures and modular systems installed on already-improved industrial land factor into the mix as well. Modular and containerized systems are frequently the fastest path to standing up IT or crypto-mining capacity on a site that wasn’t originally built for it, which is exactly why they later require a specialized removal process rather than a standard demolition approach.
What Counts as a Modular Data Center for This Type of Project
The term covers a wide range of physical configurations. Some are shipping-container-based IT pods holding a handful of server racks and integrated cooling. Others are larger prefabricated modules that combine white space, power distribution and mechanical systems into a single skid-mounted or containerized package designed to be trucked to a site and connected to utility power. Vendors in this space have included Vertiv, whose SmartMod and SmartRow platforms are built around smaller, room-based modular IT deployments, as well as larger integrated systems from Schneider Electric/APC, Dell, Rittal, Silent-Aire, BladeRoom and BASELAYER. Hewlett-Packard’s older POD line, including the 40c and 20c containerized units and the larger EcoPOD 240a, represents another generation of modular infrastructure still found in the field. The EcoPOD 240a was built as a high-capacity, high-density containerized module designed to house a substantial rack count within a compact footprint, and units from that generation continue to reach the end of their service life at facilities across the country.
Whatever the platform, these systems typically integrate a power section, a mechanical/cooling section and an IT or white space section into one physical package, along with the generators, UPS equipment, switchgear and CRAC or CRAH units needed to run independently of a conventional building. That integration is what makes decommissioning a modular unit different from decommissioning conventional building space: instead of removing systems room by room, the project usually involves de-energizing and disassembling a compact, tightly packaged unit where every system is stacked close to every other system.
How a Modular Removal Project Typically Unfolds
Most modular data center removal projects follow a lifecycle that starts well before anyone shows up with rigging equipment. The organization behind the module — whether that’s a hosting operator, a mining company, a telecom carrier or a facility owner turning the site over to a new tenant — usually knows the driver behind the project: a lease is ending, the equipment is being consolidated into a different location, the technology has been superseded, or the property itself is being redeveloped for another use.
From there, the practical sequence generally includes:
- Confirming the module’s power scale, configuration and integrated equipment (generators, UPS, cooling, switchgear) so the removal plan matches the actual system rather than a generic assumption
- De-energizing and isolating the unit from utility service, including coordination on any interconnection or metering equipment tied to the site
- Removing IT assets, racks, batteries and any data-bearing components according to whatever chain-of-custody or sanitization requirements apply to that equipment
- Disconnecting and removing integrated mechanical and electrical systems from the module shell
- Rigging, lifting and loading the module or module sections for transport, or performing structural disassembly if the unit is not being relocated intact
Because these units are often trucked to a site as a complete or near-complete package, some modules can be removed largely intact if the crane, trailer and site access support that approach. Others — particularly older or larger systems, or units that were craned into place before surrounding structures were built around them — require a more deliberate teardown sequence, removing internal equipment first and then dismantling or cutting the shell for transport in sections.
Power, Cooling and Electrical Systems Inside the Module
The equipment packed into a modular data center is functionally the same equipment found in a conventional facility, just built into a smaller footprint. Standby and prime power is commonly supplied by CAT, Cummins or Kohler generator sets sized anywhere from roughly 250 kW up through 1 MW or more depending on the module’s IT load and redundancy configuration. Backup power on the IT side typically runs through UPS systems from manufacturers such as Eaton, Liebert or APC, paired with battery strings that require their own handling, transportation and disposition planning given their weight and the requirements that may apply to battery transport.
Cooling is usually handled through a compact CRAC, CRAH or in-row system — Liebert, STULZ and Uniflair units are common in this class of equipment — sized to match the module’s thermal load rather than a full-building HVAC plant. Electrical distribution inside the module frequently runs through Square D, Eaton, GE or Siemens gear feeding PDUs and branch circuits at the rack level. Because all of these systems sit close together inside a confined enclosure, isolation and de-energization sequencing matters more in a modular removal than it does in a spread-out building environment — every circuit, feeder and mechanical interlock needs to be identified and confirmed dead before disassembly begins.

Site Access, Rigging and Transportation Considerations
Modules are built to be moved, which is an advantage during removal, but the practical logistics still require planning. A module that arrived on a lowboy trailer years ago may now be surrounded by fencing, other equipment, landscaping or structures that weren’t there at installation. Confirming current site access, overhead clearance, ground bearing capacity and crane setup requirements before mobilization avoids delays once equipment and crews are on site.
Weight is another factor that shapes the approach. A fully loaded module with generators, UPS cabinets, batteries and cooling equipment still installed can be significantly heavier than an empty shell, which affects whether it can be lifted and moved as a complete unit or whether internal equipment needs to be pulled first to bring the module down to a manageable rigging weight. Transportation planning also has to account for oversize or overweight load permitting if the module or module sections are being moved by road, along with route conditions relevant to East Texas highways and any local roadway restrictions near the site.
Asset Recovery From Decommissioned Modular Systems
Modular data center projects often present an opportunity to recover value from the equipment coming out of the unit, rather than sending everything straight to scrap. Generators, UPS systems, batteries, cooling units and switchgear removed from a modular deployment may retain resale or reuse value depending on the manufacturer, model, age, condition, hours or charge cycles, and completeness of the system. Copper wiring, aluminum bus, structural steel from the module shell and other recoverable materials also carry commodity value that can be captured through proper segregation and recycling rather than mixed-load disposal.
We evaluate the equipment coming out of a modular removal project the same way we would evaluate standalone facility equipment: by manufacturer, model, capacity, condition and market demand. Recoverable value from generators, UPS equipment and other systems can help offset a portion of the overall removal cost, though the specific outcome depends on the equipment involved and current market conditions for that class of asset.
Site Restoration and Turnover
Once the module and its integrated systems have been removed, most projects still require some level of site restoration before the property can be turned over, released back to a landlord, or repurposed. That can include removing the module’s foundation pad, concrete piers or ballast blocks, capping or removing electrical service connections, restoring grading around the former installation footprint, and clearing any remaining fencing, bollards, conduit runs or underground utility stubs that served the module. The scope of restoration work depends heavily on what the next use of the property will be and what condition the lease, sale agreement or redevelopment plan requires.
Real-World Project Experience With Modular and Containerized Systems
Our experience with modular and containerized infrastructure spans projects ranging from single IT pods supporting a specific business need to larger multi-module deployments combining power, cooling and white space into an integrated system. On projects of this type, our team typically starts by confirming the module’s manufacturer, configuration and integrated equipment before developing a de-energization and removal sequence specific to that unit. From there, the work generally proceeds through equipment removal, structural disassembly or rigging for transport, and site restoration to the condition required by the property owner or the next tenant. Because these systems often sit on properties that continue operating in some capacity — an active oilfield yard, a working commercial property, a site being marketed for a new use — coordinating the removal schedule around the rest of the property’s activity is usually as important as the technical work itself.
Serving Tyler and the Surrounding East Texas Region
USA Decom provides modular data center removal, decommissioning and asset recovery services in Tyler and throughout the surrounding East Texas region, including Longview, Marshall, Kilgore, Henderson, Athens, Nacogdoches and Lufkin. The same equipment and technical experience extends to the broader I-20 and I-69 corridors, covering properties from smaller edge deployments to larger power-intensive computing sites throughout the region.
Tell Us About Your Modular Data Center Project
If you have a modular, containerized or prefabricated data center system that needs to come down, come out, or move to a new location, our team can help you plan the removal from initial assessment through final site turnover. Use the form below to tell us about the facility or property, the type and manufacturer of the module if known, the integrated equipment involved, the site’s current power status, and your target schedule. Photographs of the module and its nameplates, when available, help our team put together an accurate assessment before we discuss next steps.