Electrical distribution equipment tends to outlast the facilities and processes it was originally installed to serve. A refinery support building, a manufacturing plant along the Loop 323 corridor, or a distribution center serving the Tyler market can operate for decades on switchgear, panelboards and busway that were sized for a very different production line or occupancy plan. When that equipment reaches the end of its useful life, gets replaced during an electrical upgrade, or becomes part of a larger facility shutdown, someone has to plan the de-energization, disconnection, rigging and removal safely and get the equipment out of the building without disrupting the rest of the operation.
USA Decom provides electrical equipment removal services for commercial and industrial facilities in Tyler and throughout the surrounding East Texas region. Our work covers low- and medium-voltage switchgear, panelboards, motor control centers, automatic transfer switches, busway and related distribution equipment, along with the coordination, transportation and disposition planning that goes with a project of this type.
Why Tyler Facilities Need Electrical Equipment Removal
Tyler’s economy reflects a mix of energy, manufacturing, healthcare, agribusiness and logistics activity, and that mix shows up in the electrical infrastructure sitting inside local facilities. The region’s long oil and gas history means many buildings in and around Tyler were originally constructed to support drilling, production or oilfield service operations, and electrical rooms in those facilities often reflect decades of modification, expansion and re-purposing as tenants and uses have changed over time. Newer logistics and distribution development in the area has added modern buildings with their own service entrance switchgear, panelboards and distribution equipment, which will eventually need to be upgraded, relocated or removed as those facilities mature.
Whatever the driver, a switchgear or panelboard replacement is rarely a simple swap. Existing equipment has to be de-energized, isolated, disconnected and physically removed before new gear can be set, and that sequence has to be coordinated with the utility, the electrical contractor, and often with production or occupancy schedules that can’t tolerate an extended outage.
Electrical Equipment We Remove
Most of the projects we handle in this category fall into a few recognizable equipment categories, whether the facility is running Square D, Eaton, GE, Siemens or another manufacturer’s gear:
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Low- and medium-voltage switchgear — including drawout air circuit breaker lineups such as Square D Power-Zone and QED/QED-2/QED-6 switchboards, Eaton Magnum and DS/DSII switchgear, GE AK/AKR and Power Break lineups, and Siemens WL and SB gear, in ratings commonly found from 400A service entrance sections up through 3000A and 4000A+ main lineups.
- Panelboards and distribution panels — Square D I-Line and PowerPact panelboards, Eaton Pow-R-Line panels, Siemens Sentron distribution equipment, and comparable legacy panelboards still found in older Tyler-area facilities.
- Busway systems — I-Line and Canalis busway, Eaton Pow-R-Way, Siemens Sentron busway and similar plug-in and feeder busway runs, often extending through mezzanines, overhead trays or vertical risers that require sectional dismantling.
- Automatic transfer switches — ASCO Series 300/4000/7000, Russelectric, Cummins/Onan PowerCommand and Kohler ATS units, in open, closed and bypass-isolation configurations tied to standby or emergency power systems.
- Motor control centers and medium-voltage components — MCC lineups, medium-voltage breakers and related gear in facilities operating at 4.16kV, 5kV or 13.8kV, where extraction typically requires additional lockout/tagout and clearance procedures.
- Data center and mission-critical power distribution equipment — PDUs and RPPs such as Vertiv/Liebert PPC and FPC units, PDI, Eaton/Powerware and APC/Schneider distribution gear, along with the associated tie-ins to UPS and switchgear systems.
We evaluate each of these categories differently for removal difficulty and asset recovery potential, since a drawout breaker in serviceable condition is a very different proposition than a fixed panelboard that has reached the end of its practical life.
Planning the Shutdown and Disconnection Sequence
Before any physical removal begins, the electrical system has to be safely de-energized and isolated. On most projects, that means working with the facility’s electrical contractor or engineer to confirm the one-line diagram, identify upstream and downstream connections, and establish a lockout/tagout sequence that protects personnel and doesn’t leave other parts of the building without power unexpectedly. Verifying zero energy state, confirming that capacitors and stored-energy devices have discharged, and identifying any cogeneration, standby generation or automatic transfer switch equipment feeding the gear are all steps that get built into the plan before disconnection starts.
Sequencing matters just as much when a facility stays partially occupied during the project. A distribution center replacing service entrance switchgear may need power maintained to refrigeration, security or IT systems throughout the work. A manufacturing plant swapping out an MCC lineup may only have a weekend shutdown window before production resumes. Understanding those constraints early lets us plan disconnection, rigging and removal around the facility’s actual operating requirements instead of forcing an all-or-nothing outage.

Rigging, Access and Physical Removal
Electrical gear is often heavier and more awkward to move than its footprint suggests. A single vertical section of low-voltage switchgear can weigh well over a thousand pounds once bus, breakers and enclosure are accounted for, and medium-voltage lineups are typically heavier still. Removal planning has to account for:
- Floor loading and access routes — confirming that the path from the electrical room to the loading dock or exterior opening can support the equipment’s weight and dimensions, including any temporary shoring, dollies or skates needed to move sections through tight corridors.
- Rigging points and lift methods — determining whether equipment can be moved with pallet jacks and rollers or requires overhead lifting, gantries or a crane pick through a roof opening or wall penetration.
- Sectional disassembly — separating switchgear and switchboard lineups into individual vertical sections, removing bus connections, and disconnecting cable and conduit terminations in a sequence that keeps the remaining equipment stable and safe to work around.
- Busway removal — disconnecting plug-in units, splice joints and hangers, then removing busway sections in manageable lengths, particularly where runs pass through ceilings, mezzanines or vertical risers.
- Protecting adjacent equipment and finishes — coordinating with facility staff so that removal work doesn’t damage equipment that will remain in service, or finishes in occupied portions of the building.
On projects involving multiple equipment types, the sequence usually moves from de-energization and isolation, through disconnection and sectional dismantling, to staged removal and loadout, with each step documented so the customer’s engineer or facility team has visibility into what was disconnected and when.
Asset Recovery and Disposition
Not every piece of electrical gear coming out of a Tyler facility is scrap. Drawout breakers, complete switchgear sections, panelboards and busway in good working condition can retain resale or reuse value on the secondary market, particularly for well-known manufacturer families like Square D I-Line and QED, Eaton Magnum and Pow-R-Line, GE Spectra and ReliaGear, or Siemens WL and Sentron equipment. Age, completeness, documentation, and whether the gear was maintained or exposed to water, corrosion or overheating all factor into whether a piece of equipment is a reuse candidate or a recycling candidate.
Where resale isn’t practical, copper bus, aluminum enclosures, wiring and other recoverable materials are typically separated for recycling rather than treated as mixed waste. Identifying which equipment has recovery value before demolition begins matters because equipment that gets torched apart for scrap loses the option of resale entirely. On projects with meaningful quantities of newer or well-maintained gear, recoverable value can help offset a portion of the overall removal cost, though the amount varies significantly by equipment condition, market demand and completeness, and it isn’t something we promise in advance of an evaluation.
Transportation and Loadout Considerations
Once equipment is disconnected and staged, getting it out of the building and to its next destination is its own logistics exercise. Heavier switchgear sections and medium-voltage components often require flatbed trucks with appropriate rigging for loading, while smaller panelboards, ATS units and busway sections can typically be palletized or crated for standard freight. For facilities without a dedicated loading dock, or for equipment located on upper floors or in below-grade electrical rooms, loadout planning has to account for hoisting, temporary openings, or coordination with building management for elevator or freight access. We plan transportation around the specific equipment involved and the facility’s site conditions rather than assuming a one-size-fits-all approach.
Projects in Action
A recurring project type in this category involves a facility undergoing an electrical service upgrade, where aging switchgear or panelboards are being replaced because they’ve reached end of life, no longer support the facility’s load requirements, or need to be brought up to current code. In a typical sequence, our team works with the customer’s electrical contractor to confirm the disconnection plan, de-energize and isolate the existing gear during a scheduled outage window, then disassemble and remove the switchgear sections, panelboards or busway runs section by section. Serviceable breakers and enclosures are evaluated for resale, while damaged or obsolete components are segregated for recycling. On facilities that stay partially occupied during the work, disconnection and removal are staged so unaffected circuits and equipment remain in service throughout the project. Projects of this type, whether in an East Texas manufacturing plant, a distribution facility, or a commercial building undergoing a tenant improvement, generally follow this same core sequence even though the specific equipment, access conditions and schedule constraints vary from site to site.

What We Need to Evaluate Your Project
To put together an accurate scope and schedule for an electrical equipment removal project in Tyler, it helps to know:
- The type and manufacturer of equipment involved (switchgear, panelboards, busway, ATS, MCC, etc.)
- Approximate voltage and amperage ratings
- Whether the equipment is currently energized or already de-energized
- The facility’s operating status and whether portions will remain occupied during the project
- Access conditions, including floor location, loading dock availability and any known clearance constraints
- Target schedule, including any lease, shutdown or utility deadlines
- Photographs of the equipment and electrical room, where available
Providing this information up front lets our team put together a realistic plan for disconnection, removal, transportation and disposition rather than guessing at site conditions after the fact.
Serving Tyler and the Surrounding East Texas Region
USA Decom provides electrical equipment removal services in Tyler and nearby East Texas communities, including Longview, Kilgore, Jacksonville, Henderson, Lindale, Whitehouse and Mineola. Whether the project involves a single switchgear lineup in a Tyler manufacturing facility or a broader electrical upgrade spanning multiple buildings, we scope the work around the equipment, the facility’s operating requirements and the region’s access and transportation realities.
Tell Us About Your Electrical Equipment Removal Project
If your Tyler facility has switchgear, panelboards, busway, an automatic transfer switch or other electrical distribution equipment that needs to come out, use the form below to tell our team about the equipment, the facility and your timeline. Include the manufacturer and model where known, approximate voltage and amperage, current condition, and any access or shutdown constraints we should plan around. That information lets us put together a project approach and let you know what to expect before, during and after removal.