A facilities engineer at a Central Texas manufacturing plant recently walked us through a familiar scenario: a production line was being reconfigured, and the existing 480V distribution lineup — a mix of aging switchboards and panelboards feeding equipment that no longer existed — needed to come out before new gear could go in. The breakers still carried load, the busway was still live in sections, and nobody on staff had removed switchgear of this size before. That combination of an active facility, energized equipment and a tight construction schedule is the kind of project USA Decom is built to handle, and it’s the type of work we’re prepared to take on for manufacturing and distribution facilities throughout Temple’s growing industrial base.
Temple sits within a Central Texas industrial corridor built around food processing, advanced manufacturing, building products and logistics, with the surrounding area continuing to add plant expansions, distribution space and light-industrial development. That kind of growth means a steady mix of new construction, plant expansions, line reconfigurations and facility turnovers — and all of it eventually requires someone to remove the electrical distribution equipment that no longer fits the current plan. Local employers span food and beverage production, building-products manufacturing and warehouse or fulfillment operations, all of which depend on switchgear, panelboards and related distribution equipment to keep running.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Why Electrical Equipment Removal Projects Come Up in Temple
Electrical gear removal projects rarely happen in isolation. They’re usually tied to a bigger event: a plant expansion that requires a service upgrade, a tenant improvement that strips out an older distribution system, a facility closure that requires a full teardown to bare walls, or an equipment swap where a customer is replacing 20- or 30-year-old switchgear with modern equipment. In each case, someone has to safely de-energize, disconnect and physically remove switchboards, panelboards, transfer switches, busway and related distribution equipment without disrupting the rest of an operating facility.
Manufacturing and food-processing plants in this region, along with the area’s growing warehouse and distribution footprint, tend to run mixed-vintage electrical systems. It’s common to find legacy Square D, Cutler-Hammer or ITE gear from an original building installation sitting next to newer Schneider Electric or Eaton equipment added during a later expansion. Knowing how each generation of gear is constructed — bolted versus drawout breakers, bus configuration, interlocking, and how sections are joined — matters when the goal is a controlled removal rather than a demolition.
Switchgear, Switchboards and Panelboards We Commonly Remove
Most projects in this category involve some combination of low-voltage switchgear, distribution switchboards and branch panelboards, along with the busway and feeder conductors that connect them. On the switchgear side, we regularly work around Eaton’s Magnum DS and DSII lineups and Square D’s Power-Zone and QED families, along with GE/ABB AK and AKR breakers and Siemens WL and SB gear where older facilities still carry legacy installations. Distribution switchboards are frequently Square D’s I-Line or QED/QED-2 platforms, or Eaton’s Pow-R-Line series, both common in manufacturing and distribution facilities built out over the last several decades. Square D’s QED switchboards, now under the Schneider Electric brand, remain a durable and widely used platform in many of these installations, which is one reason so many stay in service long after the original building program has moved on.
Panelboard removal tends to be more straightforward physically, but the volume can be significant in a large manufacturing plant or distribution center — dozens of panels feeding lighting, receptacles, HVAC and process loads throughout a building. Automatic transfer switches are another category we frequently encounter, particularly in facilities with standby generation, including ASCO Series 300, 4000 and 7000 switches and Cummins/Onan PowerCommand-controlled ATS equipment. Busway removal — whether Square D I-Line, Eaton Pow-R-Way or another manufacturer’s system — often accompanies a switchgear project since the two are physically and electrically connected.
Voltage and ampacity vary widely by project. We see everything from 208V and 480V distribution feeding standard production and warehouse loads up to 600V systems and, less frequently, low-end medium-voltage equipment in the 4.16kV to 5kV range tied to larger plant services. Breaker frames commonly range from 400A and 800A panelboard-level equipment up through 1600A, 2000A, 3000A and larger main switchgear breakers. Knowing the ampacity and voltage class before mobilizing crews and equipment is one of the first pieces of information we ask a customer to provide.
Planning the Shutdown and Disconnection Sequence
Nearly every electrical equipment removal project starts with a planning conversation about how the affected gear can be safely isolated without shutting down systems that need to stay energized. In an active manufacturing plant or distribution center, that often means sequencing the work around a partial shutdown window, coordinating with the facility’s electrical staff or engineer of record on lockout/tagout points, and confirming which upstream breakers or utility feeds control the equipment coming out.
For projects involving equipment that’s still energized elsewhere on the same bus, this planning step is not optional. Drawout breakers need to be racked out and stored or removed correctly; bolted breakers and bus connections need to be de-energized and verified dead before any disconnection begins. On larger switchgear lineups, we also look at how sections are physically joined — whether by rear bus, side bus or cable — since that determines whether a section can be isolated and removed independently or whether the whole lineup needs to come down as a unit.
Site access and physical logistics are the other half of the planning process. Switchgear and large switchboards are heavy, often requiring rigging equipment, dollies or forklifts to move sections through doorways, down hallways and out of the building. A single switchgear section can weigh well over a thousand pounds once fully assembled with breakers installed, and larger lineups with multiple sections add up quickly. We look at ceiling heights, door widths, floor loading, elevator capacity and dock access as part of the same planning process that covers electrical isolation, because both sets of constraints determine the actual removal sequence.

Asset Recovery Potential in Electrical Gear
Electrical distribution equipment is one of the more consistent categories for asset recovery among the systems we remove. Switchgear, switchboards, breakers, ATS equipment and busway that are functional, reasonably intact and from a recognized manufacturer often retain resale or reuse value in the secondary market, particularly newer platforms like Magnum DS, PowerPact or WL-series gear, or ATS equipment from ASCO, Cummins/Onan or Kohler. Copper bus and conductor also carry recoverable commodity value even when a breaker or section isn’t a candidate for resale.
Before a project moves to demolition, it’s worth identifying what can realistically be recovered versus what should go to scrap. Manufacturer, model, breaker frame size, voltage rating, age, completeness and general condition all affect whether a piece of gear has resale value or is better suited for recycling. Equipment that’s been maintained, has its original breakers and trip units, and comes with documentation tends to be more marketable than equipment that’s missing components or has been exposed to water or fire damage. We don’t promise that every piece of gear removed from a project will have resale value, but identifying that potential early, rather than after everything has already been cut apart and loaded into a scrap bin, is part of how a decommissioning project can help offset overall removal costs.

What Happens After Removal
Once equipment is disconnected and physically out of the building, it needs somewhere to go. Gear identified for resale or reuse gets handled differently than material headed for recycling — recoverable copper, aluminum and steel are separated and processed through appropriate recycling channels, while breakers, switchgear sections and other equipment with secondary-market value are staged, documented and prepared for sale. For larger projects, this can mean loading multiple truckloads of switchgear sections, panelboards and busway, so coordinating transportation and disposition alongside the physical removal work keeps the project moving instead of leaving equipment staged on-site for weeks.
Site restoration requirements vary by project. Some customers need only the equipment removed with minimal wall or floor patching; others need a space returned to bare walls and floor as part of a larger renovation or tenant turnover. Knowing which condition applies — and communicating that requirement clearly — helps set expectations for the final walkthrough.
Project Spotlight: Reconfiguring an Active Manufacturing Line
Back at the Central Texas manufacturing plant referenced above, the removal sequence started with a coordinated shutdown of the affected distribution section while the rest of the plant continued running on unaffected circuits. Crews de-energized and verified the equipment dead, removed breakers section by section, and disconnected the busway runs feeding the old production line. The switchboards and panelboards came out through a loading dock using rigging equipment sized for the heaviest sections, with floor protection down the travel path to avoid damage to the plant floor. Several of the breakers and one of the switchboard sections were in good enough condition to move into the secondary market, while the remaining structural steel and conductor went to recycling. The plant’s new distribution equipment went in on the schedule the customer needed, without an unplanned outage affecting production elsewhere in the facility. Projects of this type reflect how we approach electrical gear removal generally — isolate what needs to be isolated, keep the rest of the facility running, and sort recoverable equipment from scrap before anything gets cut apart.
Serving Temple and the Surrounding Region
USA Decom provides electrical equipment removal services in Temple and throughout the surrounding Central Texas market, including Belton, Killeen, Harker Heights, Waco and the broader I-35 corridor between Austin and the Dallas–Fort Worth area. Facilities in this region range from food and beverage manufacturing and building-products plants to distribution centers and light industrial operations, many of which eventually need switchgear, panelboards, ATS equipment or busway removed as part of an expansion, renovation, equipment upgrade or closure.
If you have an upcoming project involving switchgear, switchboards, panelboards, transfer switches or busway in Temple or the surrounding area, use the form below to tell our team about the facility, the equipment involved and your target schedule. Useful details include the manufacturer and model of the equipment where known, approximate voltage and ampacity, whether it’s currently energized, site access conditions, and any shutdown or turnover deadlines driving the project. That information lets us put together an accurate scope and identify what, if any, recovery potential the equipment may have before your project moves forward.