The Electrical Gear Behind an Aging LA Building Is Rarely Simple to Remove
Walk into almost any commercial or industrial property built in the last sixty years around Los Angeles and you’ll find layers of electrical infrastructure that have been added, upgraded, and patched over decades. A 1970s-era switchgear lineup might be feeding a building that’s since had rooftop solar tied in, a data closet converted into a small server room, and a tenant improvement that added a dozen new panelboards. When that building is being renovated, repowered, sold, or torn down, someone has to deal with everything behind the panel covers — and that’s rarely a simple demolition task.
USA Decom removes low- and medium-voltage electrical distribution equipment from commercial, industrial, institutional, and data center facilities throughout the Los Angeles metro. That includes switchgear, breakers, panelboards, busway, transfer switches, and related power distribution equipment. On many projects, some of this equipment retains resale or scrap value, and identifying what can be recovered versus what needs to be scrapped is part of doing the job correctly.
This page walks through what’s typically involved in an electrical equipment removal project in the LA market, the equipment we commonly encounter, and what our team needs to know to evaluate a project.
Why Electrical Equipment Removal Comes Up in LA Projects
Electrical gear removal projects in this market tend to trace back to a handful of situations:
- Building repositioning or adaptive reuse. Older industrial and commercial buildings throughout Los Angeles, from the Arts District to the South Bay, are frequently being repositioned for new tenants, which often means ripping out legacy distribution equipment sized for a prior use.
- Utility service upgrades. A building bringing in new utility service or increasing electrical capacity typically needs its existing switchgear and switchboards removed before new gear can be installed in the same electrical room.
- Manufacturing and industrial facility closures. When a plant shuts down or relocates, the electrical infrastructure — main switchgear, motor control centers, panelboards, busway runs — has to come out along with the production equipment.
- Data center and telecom decommissioning. Power distribution equipment such as PDUs, RPPs, and associated switchgear is commonly removed as part of white space or full facility decommissioning projects.
- Tenant improvement and demolition work. General contractors performing selective demolition or full building strip-outs often need a subcontractor experienced specifically with electrical gear removal, isolation, and disposition.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Los Angeles County’s mix of older industrial buildings, aerospace and manufacturing facilities, and a growing base of data center and logistics space means this equipment shows up in a wide range of building types and vintages.
Equipment We Commonly Remove
Electrical distribution equipment varies significantly by building age and use, but projects in this market frequently involve:
- Low-voltage switchgear and power circuit breakers, including Square D / Schneider Electric MasterPact NT and NW frames, Eaton (Cutler-Hammer/Westinghouse) Magnum and DS/DSII breakers, GE/ABB AK and AKR and Spectra RMS gear, and Siemens WL and legacy ITE equipment.
- Switchboards and panelboards, including Square D I-Line and PowerPact systems, Eaton Pow-R-Line, and comparable Siemens Sentron and GE panelboard lines.
- Motor control centers and unit substations tied into plant or process power.
- Busway, including I-Line, Pow-R-Way, Sentron, Spectra, and Starline plug-in busway runs, often removed in sections along overhead raceways.
- Automatic and manual transfer switches, including ASCO Series 300/4000/7000, Cummins/Onan PowerCommand and OTPC/BTPC, and Russelectric ATS systems tied to standby generators.
- Medium-voltage gear, such as vacuum breaker or metal-clad switchgear in the 4.16 kV to 13.8 kV range, where a facility has its own primary distribution.
- Data center power distribution equipment, including Vertiv/Liebert PPC and RPP units, PDI power distribution equipment, and Eaton/Powerware PDUs.
Amperage ranges on these projects typically run from 400A and 600A panelboards up through 2000A, 3000A, and 4000A+ main switchgear breakers, depending on the size of the facility and its original service.
What the Removal Process Actually Involves

Electrical equipment removal isn’t a straightforward demolition task because the equipment is energized, often load-bearing to some degree structurally, and frequently tied into systems that other parts of the building still depend on. A typical sequence includes:
- Site walk and scope development. Before any equipment moves, our team needs to understand what’s installed, how it’s fed, what’s still energized, and what has already been de-energized or abandoned.
- Coordination on isolation and lockout. Switchgear and panelboards have to be properly de-energized and isolated, which usually requires coordination with the property’s electrical contractor, facilities team, or utility depending on where the service point is.
- Disconnection and disassembly. Bus connections, cable terminations, and structural mounting have to be disconnected in the right order, particularly on draw-out breaker gear where sections can weigh several hundred pounds each.
- Rigging and extraction. Larger switchgear lineups and transformers often require rigging, dollies, or a forklift to move out of electrical rooms that weren’t designed with future equipment removal in mind — tight doorways, raised floors, and below-grade vaults are common in older LA buildings.
- Transportation and disposition. Equipment is moved offsite for resale, recycling, or scrap processing depending on condition, age, and market demand.
- Site restoration. Depending on the project, this may include patching floor openings, capping abandoned conduit, or restoring the electrical room to a turnover condition specified by the property owner or incoming tenant.
Working in Occupied or Partially Active Facilities
Most electrical equipment removal projects in the LA market don’t happen in an empty building. A distribution center might be operating in one half of a facility while the other half is being decommissioned. A manufacturing plant might need one production line to keep running while adjacent equipment comes out. This creates a few practical constraints:
- Work zones need to be clearly established and communicated so equipment removal doesn’t affect circuits still serving active operations.
- Sequencing matters — equipment feeding areas still in use has to be identified and handled differently than equipment that’s fully abandoned.
- Noise, dust, and equipment movement need to be scheduled around the facility’s operating hours where the customer requires continued production or occupancy.
- Any temporary power or bypass arrangements needed during the transition should be identified early, since electrical rooms are frequently a single point of failure for a building’s power.
Asset Recovery: What Might Have Resale Value
Not every piece of electrical gear pulled out of a building is scrap. Depending on condition, age, completeness, and current secondary-market demand, some switchgear, breakers, transfer switches, and busway sections retain resale value — particularly newer draw-out breaker frames, less common medium-voltage gear, and equipment from manufacturers with an active secondary market such as Square D, Eaton, Siemens, and GE/ABB.
Factors that affect whether equipment has recoverable value include:
- Manufacturer and model family (some older or discontinued frames have limited resale demand)
- Age and condition, including whether breakers have visible arc damage or corrosion
- Completeness — missing trip units, cradles, or accessories reduce value
- Voltage and amperage rating relative to current market demand
- Quantity — a full lineup can sometimes be more valuable intact than piecemeal
- Ease of removal and transportation from the site
We evaluate equipment on a case-by-case basis rather than assuming a blanket value, and not every item pulled from a facility will have resale potential. Copper content, aluminum busway, and steel enclosures typically still have scrap value even when equipment itself has no resale market, which can help offset a portion of overall removal costs.
Regulatory and Handling Considerations
Certain older electrical equipment, particularly transformers and some capacitors manufactured before the late 1970s, may contain PCB-containing dielectric fluid subject to federal handling and disposal requirements. Facility owners and their environmental consultants typically need to identify and address PCB-related handling requirements before this type of equipment is removed. Other considerations that can affect a project include:
- Confirming whether any equipment has been tested or labeled for PCB content
- Identifying asbestos-containing materials in older switchgear enclosures or arc chutes, which is more common in equipment manufactured before the 1980s
- Coordinating any required notifications with the local utility if removal affects a service point
- Following applicable local, state, and federal requirements for equipment transportation and disposal
These requirements vary by project and equipment age, so they’re worth flagging early during scope development rather than discovering them mid-removal.
Los Angeles Market Considerations
The Los Angeles metro presents a few practical realities that affect scheduling and logistics on electrical equipment removal projects:
- Building age and density. Many industrial and commercial buildings in areas like Vernon, the Central Alameda corridor, and older sections of the San Fernando Valley were built decades ago with electrical rooms sized for the equipment of that era, which can make modern rigging and extraction more challenging.
- Traffic and access windows. Congestion on major corridors and limited loading dock availability in denser commercial districts can affect the timing of equipment loadout and transportation.
- Seismic considerations. Older switchgear installations in this region were sometimes anchored or braced to different standards than current code, which can affect how equipment is secured and disconnected during removal.
- A diverse facility base. From aerospace and manufacturing plants in the South Bay to distribution facilities in the Inland Empire corridor and data center space growing in areas like El Segundo, the range of building types in this market means electrical gear removal projects vary considerably in scope and complexity.
We also serve surrounding communities including Long Beach, Glendale, Pasadena, Burbank, Anaheim, Ontario, and other parts of the greater Southern California region where similar building stock and industrial activity are common.

Case Studies from the Field
Projects of this type often start the same way: a facility owner or general contractor has an electrical room full of equipment that needs to come out before the next phase of a renovation, closure, or capacity upgrade can move forward. On similar projects, our team typically begins with a site walk to document existing switchgear and breaker configurations, confirm what’s still energized, and identify structural or access constraints — narrow electrical room doorways, below-grade vaults, or equipment that’s been added to over the years without much room to maneuver.
From there, the work usually moves through de-energization coordination, section-by-section disconnection of bus and cable terminations, and rigging of heavier gear like draw-out breaker cubicles or unit substations. Where equipment has resale potential — a newer MasterPact frame, an intact Magnum DS lineup, or a set of ASCO transfer switches in good condition — it’s set aside, documented, and handled separately from material headed to scrap processing. The remaining copper, aluminum, and steel is segregated for recycling, which on larger switchgear removal projects can represent a meaningful volume of recoverable material.
What to Gather Before Requesting a Quote
Before reaching out, it helps to have a general sense of the following so we can evaluate the scope accurately:
- What type of equipment is involved (switchgear, panelboards, transfer switches, busway, transformers, etc.)
- Manufacturer and model, if known (nameplate photos are helpful)
- Approximate quantity and voltage/amperage ratings
- Whether the equipment is still energized or already de-energized
- Building access conditions — floor level, doorway widths, elevator or dock availability
- Whether the facility will remain partially occupied or operating during removal
- Target timeline, including any lease, closure, or utility service deadlines
- Any known environmental considerations, such as suspected PCB-containing equipment
Photographs of the equipment and electrical room are useful even at this early stage and help our team give you a more accurate sense of scope before a site visit.
Tell Us About Your Project
If you’re planning an electrical equipment removal project anywhere in the Los Angeles area — whether it’s a single switchgear lineup, a full building strip-out, or a data center power distribution removal — use the form below to tell our team about the facility, the equipment involved, and your timeline. The more detail you can provide up front, including equipment type, manufacturer, location, and site access conditions, the faster we can put together an accurate picture of the project and next steps.