Consider the type of project we regularly see across the Inland Empire’s warehouse and distribution market: a large industrial building, originally constructed in the 1990s, still running on its original low-voltage switchboard — often in the 2000A to 2500A class at 480V — feeding panelboards that have outlived several rounds of tenant build-outs and racking reconfigurations. When an incoming tenant’s engineer specifies entirely new distribution equipment, the old switchboard, its associated panelboards and a run of I-Line busway all have to come out before the new electrical contractor can mobilize on the space. That kind of sequencing challenge, where electrical equipment removal has to happen on a tight window between an outgoing and incoming tenant, comes up regularly across the Inland Empire’s industrial base, and it’s the type of project USA Decom is set up to handle.
Why Electrical Equipment Removal Comes Up So Often in This Market
The Inland Empire has grown into one of the largest industrial and logistics markets in the country, shaped in large part by its position along the freight corridors serving the ports of Los Angeles and Long Beach. Warehouses throughout the region are commonly leased by companies that need substantial storage and throughput capacity — manufacturers, distributors, last-mile logistics providers and e-commerce operators among them. That tenant profile creates an ongoing cycle of buildings being re-tenanted, expanded, retrofitted with automation, or converted from light manufacturing to pure distribution use. Each of those transitions tends to trigger electrical work: new service entrance equipment, higher-capacity switchgear to support conveyor and sortation loads, additional transformers for expanded mezzanine or cold-storage space, or complete removal of gear that no longer matches a tenant’s power requirements.
The region has also seen a substantial amount of industrial construction over the past decade, which means a corresponding volume of older buildings being backfilled, repositioned or converted as tenants relocate into newer facilities. Owners repositioning an older building for a new tenant, general contractors managing a tenant improvement, and facility engineers planning a plant consolidation all tend to need the same basic service: safe, efficient removal of existing electrical distribution equipment before new work can begin.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
What This Service Typically Covers
Electrical equipment removal, as USA Decom performs it, generally includes de-energizing and disconnecting existing gear, physically removing switchgear, switchboards, panelboards, transformers, busway and associated conduit and cable, and clearing the space to the condition required for the next phase of work. This is different from a full facility decommissioning, which addresses an entire building, and different from data center-specific power distribution removal, which involves PDUs and RPPs tied to critical IT load. Here, the focus stays on the electrical distribution system itself, whether that system serves a warehouse, manufacturing plant, distribution center or commercial building.
Equipment we commonly encounter on Inland Empire projects includes low-voltage switchgear and switchboards from manufacturers such as Square D/Schneider Electric, Eaton/Cutler-Hammer, GE/ABB and Siemens/ITE. Depending on the building’s age, that might mean older Square D I-Line switchboards and panelboards, Eaton Pow-R-Line distribution sections, GE Spectra series panelboards, or Siemens Sentron gear. Larger campuses and older manufacturing buildings sometimes still carry drawout air circuit breaker switchgear such as Square D Power-Zone or QED-series lineups, Eaton Magnum or DS/DSII switchgear, or GE AK/AKR breakers, particularly where the building was originally built for heavier industrial loads than its current use requires.
Working Around an Active Building

Very few of these projects happen inside an empty shell. Most Inland Empire electrical equipment removals take place while a building is partially occupied, under a compressed turnover schedule, or adjacent to ongoing tenant improvement work from other trades. That reality shapes how the project needs to be planned. Before any equipment is disconnected, we need to understand which circuits and panels are still live, which are already de-energized, and how the building’s utility service and any backup power are configured. On larger sites this sometimes means coordinating a temporary shutdown window with the utility or with an electrical contractor who is landing new service equipment on the same day old gear comes out, so the building doesn’t lose power any longer than necessary.
Sequencing also matters when a general contractor’s other trades are mobilizing in the same space. Electrical rooms are often tight, and switchgear lineups rated 1200A to 4000A or higher can weigh several thousand pounds per section, which means rigging plans have to account for floor loading, door and corridor clearances, and whether equipment needs to be cut down into sections before it can be moved. Medium-voltage gear, where present, adds another layer of coordination since disconnection and removal sequencing has to respect arc-flash and lockout/tagout requirements at 4.16kV, 5kV or higher class equipment.
Asset Recovery Potential in Removed Electrical Gear
Not every piece of electrical equipment coming out of an Inland Empire building is scrap. Drawout breakers, switchgear cradles, transfer switches and certain panelboard and busway assemblies can retain resale or reuse value depending on manufacturer, model family, age, condition and completeness. A Square D MasterPact NT/NW breaker pulled from a well-maintained switchgear lineup, an Eaton Magnum DS section in good condition, or a GE/ABB Spectra RMS panelboard trim can sometimes be recovered for resale into the secondary electrical equipment market rather than sent straight to a scrap yard. The same applies to automatic transfer switches such as ASCO Series 300 or 7000 units, Russelectric transfer equipment, or Cummins/Onan PowerCommand switches when a generator system is being replaced or removed.
Copper content in busway, cable and transformer windings also carries recoverable commodity value, and separating that material properly during teardown — rather than demolishing everything into a mixed pile — generally improves what can be recovered. We evaluate this on a project-by-project basis rather than assuming every component has resale value, but identifying recoverable equipment before removal begins is worth doing on almost any project involving switchgear, transfer switches or busway that’s less than a couple of decades old. Recovered value from resalable equipment and scrap commodities can offset a portion of the overall removal cost, though it isn’t something we can guarantee will cover the full project.
Panelboards, Busway and Transformers
Beyond the main switchgear lineup, most removal projects also involve a mix of distribution panelboards, feeder and plug-in busway, and dry-type or liquid-filled transformers stepping voltage down from 480V service to 208V/120V branch circuits. Busway removal — whether it’s Square D I-Line, Eaton Pow-R-Way, Siemens Sentron busway, or a Starline track busway system installed for overhead power distribution to racking or automation equipment — requires careful de-energization and section-by-section disassembly, particularly where it runs through ceiling grids or above active racking that can’t be disturbed. Transformers present their own handling considerations given their weight and the need to manage any residual oil or coolant in liquid-filled units according to applicable requirements.
For buildings that have gone through several tenant improvements, it’s common to find a mix of eras and manufacturers in the same electrical room: an older Square D switchboard, a later Eaton panelboard addition, and newer Siemens or Schneider gear installed for the most recent tenant’s equipment. Documenting what’s actually installed, rather than relying on outdated as-built drawings, is usually the first practical step before pricing or scheduling the removal.
What to Gather Before Reaching Out
A useful starting point for any electrical equipment removal request includes the building’s approximate square footage, the type of facility, the location within the Inland Empire, and a general description of what electrical equipment needs to come out. If available, photos of the switchgear or panelboard nameplates, information on approximate amperage and voltage ratings, and whether the equipment is currently energized or already de-energized all help us evaluate scope and schedule more accurately. It’s also useful to know the project’s target completion date, particularly if it’s tied to a lease turnover deadline, a new tenant’s construction schedule, or a utility service upgrade date, since those deadlines often drive how the removal work needs to be sequenced.

How a Project Like This Typically Wraps Up
Returning to the type of project described earlier: once an incoming electrical contractor confirms the location of new service equipment and a shutdown window is coordinated, removal of an old switchboard, panelboards and I-Line busway can typically proceed in a matter of days rather than weeks, provided access and rigging paths have been planned in advance. Recoverable breakers and switchgear sections get segregated for evaluation, copper busway and cable get separated from steel and aluminum components, and the electrical room gets cleared and swept to the condition the incoming trades need to begin their own work. That kind of coordinated handoff — old equipment out, recoverable material identified, space turned over on schedule — is generally the goal on projects throughout the region, whether the building sits in Fontana, Ontario, Rancho Cucamonga or elsewhere across the Inland Empire.
Serving the Inland Empire and Surrounding Markets
USA Decom provides electrical equipment removal services throughout the Inland Empire, including Ontario, Fontana, Rancho Cucamonga, San Bernardino, Riverside, Moreno Valley and Chino, as well as surrounding logistics and manufacturing markets across Southern California. Whether the project involves a single electrical room in a distribution building or a full switchgear lineup replacement across a larger industrial campus, the planning considerations are largely the same: understand what’s installed, plan the shutdown and rigging sequence, identify what can be recovered, and clear the space on schedule.
Tell Us About Your Project
If you’re planning a tenant turnover, electrical system upgrade, plant consolidation or equipment replacement anywhere in the Inland Empire, use the form below to tell our team about the facility, the electrical equipment involved, approximate amperage or voltage where known, site access conditions, and your target schedule. Photos of the existing equipment are helpful if you have them. That information lets us evaluate the scope, discuss asset recovery potential where it applies, and put together a removal plan that fits your building’s turnover timeline.