Fresno’s industrial base runs on power distribution equipment that was often installed decades ago and expanded piecemeal as food processing plants, cold storage facilities, distribution centers and manufacturing operations grew along the Highway 99 corridor. When a facility is upgraded, consolidated, sold or shut down, the switchgear, panelboards, transformers and busway that once carried that load still need to come out — safely, in the right sequence, and in a way that accounts for what the equipment might still be worth. That is the work USA Decom does across the Fresno market: removing low- and medium-voltage electrical distribution equipment from active and inactive commercial and industrial facilities.
This isn’t a general demolition task. Electrical gear removal involves de-energizing and verifying circuits, coordinating with the utility or facility electricians, disconnecting and disassembling equipment that can weigh several thousand pounds, and moving it out of a building without damaging structure, floors or adjacent systems that may still be in service. Whether the project involves a single switchboard replacement or a full electrical room teardown ahead of a building sale, the approach has to be planned around the equipment, the site and the schedule.
The Electrical Gear We Remove
Fresno facilities span a wide range of vintages and applications, so the equipment we encounter varies accordingly. Typical removal scopes include:
- Low-voltage switchgear and switchboards — drawout metal-enclosed switchgear such as Square D Power-Zone lineups with MasterPact NT/NW breakers, Eaton Magnum DS switchgear, GE AK/AKR and Spectra gear, and Siemens WL/SB switchgear, generally in the 480V–600V range and often built around 800A to 4000A+ frame sizes
- Switchboards and panelboards — Square D QED, QED-2 and I-Line switchboards, Eaton Pow-R-Line boards, and comparable Siemens and GE panelboard product lines used for building and process power distribution
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Dry-type and liquid-filled transformers — step-down units ranging from small dry-type transformers serving panelboards up to larger pad-mounted or unit-substation transformers feeding a plant’s main distribution
- Busway and bus duct — Square D I-Line busway, Eaton Pow-R-Way, Siemens Sentron busway, GE/ABB Spectra busway and similar plug-in or feeder busway systems that distribute power vertically or horizontally through a building
- Automatic transfer switches and paralleling gear — ASCO, Russelectric, Cummins/Onan PowerCommand and Kohler-style ATS equipment associated with standby or emergency power systems
- Medium-voltage gear — metal-clad and metal-enclosed switchgear serving loads at 4.16kV, 5kV or 13.8kV where a facility takes service at higher voltages before stepping down
Legacy nameplates are common in a market like Fresno, where a food processing plant or agricultural facility may still be running Westinghouse- or ITE-labeled equipment installed decades before those brands were absorbed into Eaton and Siemens. We evaluate the gear as it actually exists in the field rather than assuming a particular vintage or manufacturer.
Why Electrical Gear Removal Is More Involved Than It Looks
Electrical distribution equipment sits at the center of a building’s power system, which means removal work touches almost every other trade and system in the facility. A few of the practical issues that shape a removal project:
De-energization and verification. Before any physical work begins, circuits feeding the equipment need to be identified, de-energized, locked out and verified dead. On an active facility, this often has to be coordinated around production schedules, refrigeration systems that can’t lose power, or other loads that remain in service on adjacent gear.
Utility and facility coordination. Depending on the scope, removal may require coordination with the serving utility for service disconnects, or with the facility’s own electricians and engineers to confirm which circuits can be taken down and in what order.
Weight and rigging. A single vertical section of low-voltage switchgear can weigh well over a thousand pounds once breakers, bus and enclosure are accounted for, and medium-voltage gear or larger transformers can weigh considerably more. Equipment often sits on a housekeeping pad or in a below-grade electrical room, which affects how it can be broken down, skidded or lifted for removal.
Disassembly sequencing. Drawout breakers are typically removed first, followed by bus connections, conduit and cable terminations, and finally the structural sections themselves. Busway has to be de-energized and disconnected in sections, often working back from the farthest plug-in unit toward the source.
Site access and building conditions. Electrical rooms are frequently located in constrained spaces — mezzanines, below-grade vaults, or interior rooms without a direct path to a loading dock. Getting equipment out sometimes means routing through corridors, using floor protection, or opening a wall or roof panel for oversized sections.
Working around live systems. In a partial renovation or phased shutdown, some panels and circuits stay energized while adjacent gear is removed. Clear boundaries, temporary barriers and communication with facility personnel are necessary to keep the work zone separated from operating equipment.
We build a removal plan around these factors before mobilizing, which is why the information gathered up front — equipment type, location in the building, current electrical status and access conditions — has a direct effect on schedule and approach.
Asset Recovery for Electrical Distribution Equipment

Electrical gear removal is often paired with asset recovery. Depending on age, condition, completeness and manufacturer, switchgear, breakers, transformers, busway and ATS equipment can retain resale or reuse value in the secondary market, particularly for well-known product families that remain supported for parts and service. Copper content in bus, windings and cable also carries recyclable commodity value even when a unit is not suitable for resale.
Before equipment is scrapped, it’s worth identifying:
- Manufacturer, series and model (for example, Magnum DS, MasterPact NW, or a Power-Zone lineup)
- Voltage and current rating
- Age and general condition, including whether the gear has been maintained or is still in service
- Completeness — whether breakers, trip units and accessories are present
- Quantity, since a full lineup or matched set of panelboards is often more valuable than a single section
Recoverable value from resalable gear or scrap-grade copper and steel can offset a portion of removal costs on a given project, though not every piece of equipment has meaningful resale value and recovered value should not be assumed to cover the full cost of a removal scope. We evaluate each situation based on what’s actually there rather than a blanket assumption either way.
Transportation and Disposition
Once equipment is disconnected and staged, it has to be loaded and moved off site. Larger switchgear sections and transformers typically require a forklift, moving skids, or a crane depending on weight and clearance, and loading often means a flatbed or box truck depending on whether equipment is being transported for resale, recycling or scrap processing. Facilities located off the Highway 99 or Highway 41 corridors, or in Fresno’s established industrial areas near the airport and rail lines, generally offer more straightforward truck access than older buildings in tighter, in-fill locations — which is one more reason site access details matter early in scope development.
From the Field: A Recent Electrical Room Teardown
A project of this type recently involved a commercial/industrial facility replacing its aging main distribution equipment as part of a larger building renovation. The scope included removal of an older low-voltage switchgear lineup with several drawout breaker sections, associated I-Line busway feeding downstream panelboards, and an ATS that had reached the end of its service life. Our team coordinated de-energization windows with the facility’s electrical contractor, removed breakers and bus sections in sequence, and broke the switchgear enclosures down for transport through an interior corridor rather than a direct dock opening. Several of the breakers and a portion of the busway were evaluated for resale, while the remaining structural steel and copper were processed for recycling. Projects like this typically move faster when the equipment’s condition, location and access constraints are documented before the crew arrives on site.
What Drives Schedule and Scope on a Fresno Project

A few factors consistently affect how quickly and efficiently an electrical removal project can move in the Fresno market:
- Whether the facility is active, partially active, or fully vacant at the time of removal
- Whether the equipment is still energized or has already been de-energized by others
- The physical location of the gear within the building relative to loading access
- The total scope — a single panelboard swap looks very different from a full plant electrical room teardown
- Any lease turnover, sale closing or permit deadline driving the timeline
- Whether asset recovery or resale is part of the plan, which can affect how carefully equipment needs to be disassembled
Fresno’s mix of older food processing plants, mid-century industrial buildings and newer distribution centers along the Highway 99 corridor means electrical infrastructure conditions vary significantly from site to site, and a scope that works for one building may not translate directly to another.
Serving Fresno and the Surrounding Central Valley
USA Decom provides electrical equipment removal services in Fresno and throughout the surrounding Central Valley, including Clovis, Madera, Visalia, Hanford, Tulare, Selma, Kerman and Sanger. Whether a project is centered on a single Fresno facility or spans multiple sites across the valley, the same evaluation and removal approach applies to industrial, agricultural processing, distribution and commercial facilities throughout the region.
Tell Us About Your Project
If you’re planning to remove switchgear, panelboards, transformers, busway, an ATS or other electrical distribution equipment from a Fresno-area facility, use the form below to tell our team about the equipment, its location in the building, its current electrical status, and your target schedule. Photographs of nameplates and the general installation are especially useful for evaluating asset recovery potential before removal begins.