Why Temple Facilities Are Reassessing Their Data Halls
Temple occupies an increasingly active position in the Central Texas data center corridor. Meta operates a hyperscale data center campus in Temple, and a second large hyperscale development has since been announced nearby along the same corridor. That level of investment doesn’t just create new construction — it also tends to accelerate turnover, consolidation and retrofit activity among existing enterprise, colocation, telecom and edge facilities throughout the region, as tenants, operators and property owners reposition space around a growing hyperscale footprint.
For facility owners and IT operations teams outside the hyperscale segment, this shift often means a data hall reaches the end of its useful life well before the building itself does. A colocation suite loses a tenant. A corporate IT room is consolidated into a larger regional facility. A leased data center space needs to be returned to landlord condition. An enterprise data hall built a decade ago no longer matches current power density, cooling architecture or rack standards. In each of these situations, the physical white space — the racks, raised floor, containment, cabling and power distribution inside the data hall — has to be cleared before the space can be reused, renovated, released back to a landlord, or repurposed for another business function.
USA Decom provides data center white space decommissioning services for facilities across Temple and the broader I-35 corridor, focused specifically on clearing the data hall itself rather than the entire building or every mechanical and electrical system supporting it.
What White Space Decommissioning Actually Covers
White space decommissioning is a distinct scope from a full data center decommissioning or targeted equipment removal project. The focus is the data hall environment — the physical space where IT equipment operated — brought back to a clean, reusable condition. Depending on the facility, that typically includes:
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Server and network racks and cabinets, along with any remaining IT chassis, blanking panels and rail kits
- Raised access floor systems, including floor panels, pedestals, stringers and understructure
- Overhead ladder rack, cable tray and support systems, along with abandoned fiber and copper cabling runs
- Hot-aisle and cold-aisle containment structures, doors and roof panels
- PDUs, remote power panels (RPPs) and associated branch circuit wiring
- Overhead and underfloor busway systems
- CRAC and CRAH units serving the white space directly, where included in the project scope
- Fire-suppression components tied to the data hall, when part of the removal scope
- Any remaining abandoned infrastructure left behind by prior tenants or equipment refreshes
Data halls in this market range considerably in scale — from smaller enterprise rooms with 50 to 150 racks up to large colocation or enterprise suites exceeding 500 to 900 racks across data halls that can run from roughly 2,500 square feet to well over 80,000 square feet. The planning approach scales with that footprint, but the underlying sequence of disconnection, disassembly, removal and floor restoration stays consistent.

Assessing the Space Before Work Begins
A useful white space decommissioning plan starts with a walkthrough that documents what’s actually in the room, not just what’s on an as-built drawing. Facilities change over years of tenant turnover, refresh cycles and IT consolidation, and the physical inventory frequently no longer matches the original design documents. Our team typically wants to understand rack count and layout, containment configuration, raised floor height and condition, cable density in overhead trays and under the floor, and the condition and rating of PDUs, RPPs and busway feeding the space.
This assessment also identifies which systems are live and which have already been powered down. A data hall being decommissioned in phases — where some rows remain in production while others are cleared — requires a materially different approach than a fully de-energized suite. Confirming electrical isolation, verifying circuit labeling, and coordinating lockout/tagout procedures with facility engineering or the building owner are foundational steps before any rack, PDU or busway section is touched.
Rack and Cabinet Removal
Server and network racks form the visible core of most white space projects. Enterprise and colocation environments in this region commonly use cabinet systems from manufacturers such as APC/Schneider Electric, Chatsworth Products (CPI), Rittal, Panduit, Vertiv, Great Lakes Case & Cabinet, Eaton and Legrand. Disassembly sequencing depends on whether cabinets are bolted to the raised floor or slab, ganged together in rows, tied into overhead containment, or still carrying residual cabling that needs to be traced and disconnected before the cabinet can be freed.
Where equipment inside the racks has already been removed by the IT team, our scope typically starts at the empty cabinet. Where legacy servers, switches or storage chassis remain in place, those components need to come out first, with appropriate handling for any data-bearing devices. Data-bearing equipment may require sanitization, destruction or chain-of-custody procedures as part of the overall project plan, coordinated according to the facility’s own IT asset disposition requirements.
Raised Floor, Containment and Overhead Infrastructure
Raised access floor removal is one of the more labor-intensive components of a white space project, particularly in older data halls where floor systems from manufacturers such as Tate, ASM, Haworth or Kingspan have been in place for many years and may include a mix of solid, perforated and grated panels supporting underfloor cooling distribution. Panels, stringers and pedestals need to be removed methodically, and the slab underneath is typically cleaned of adhesive, leveling compound residue and any remaining anchors before the space is turned over.
Hot-aisle and cold-aisle containment — whether from APC/Schneider Electric, Vertiv, Chatsworth, Subzero Engineering or integrated into a raised floor system such as Tate — comes down alongside the rack rows it was built around. Overhead ladder rack and cable tray systems from manufacturers like Chatsworth, Panduit, Legrand or Cablofil often carry years of accumulated fiber and copper cabling, including abandoned runs left behind by past tenants or equipment refreshes. Sorting active cable from abandoned cable, tracing runs back to terminations, and removing tray and support hardware down to the ceiling grid or structural deck is a significant part of the overall labor in a fully cleared white space.
Power Distribution: PDUs, RPPs and Busway
Power infrastructure inside the white space — cabinet-level PDUs, remote power panels and overhead or underfloor busway from manufacturers such as Vertiv/Liebert, PDI, Eaton, APC/Schneider Electric, Starline or Square D — requires coordinated electrical disconnection before physical removal. This work needs to be sequenced with the facility’s electrical contractor or engineering team to confirm upstream breakers are open, panels are properly isolated, and any shared circuits serving equipment outside the decommissioning scope remain untouched. Busway in particular often runs the length of a data hall and ties into multiple rows, so removal sequencing has to account for structural supports, hangers and any shared runs feeding adjacent space that isn’t part of the current project.
Precision Cooling Serving the White Space
Where CRAC or CRAH units serve the data hall directly and are included in the project scope, those units are disconnected from chilled water, condenser piping or refrigerant lines as applicable, along with associated controls and electrical feeds, before being rigged out of the space. Underfloor and overhead ductwork tied specifically to white space cooling delivery — as opposed to central plant equipment — typically comes down as part of this same scope. Coordinating this work with facility engineering matters most in shared-plant environments, where cooling infrastructure serving the decommissioned hall may also support adjacent active space.
Recovering Value From What Comes Out of the Hall
Not everything removed from a data hall is scrap. Rack and cabinet systems, containment components, raised floor panels and pedestals, PDUs, and certain cabling and connectivity components can carry resale or reuse value depending on age, manufacturer, condition, completeness and current secondary-market demand. Copper cabling and structural steel from raised floor systems also carry recyclable commodity value. Identifying which components have recovery potential before demolition begins — rather than treating everything as waste — can help offset a portion of overall project costs, though the value of any individual load of equipment or material varies and isn’t guaranteed.
From the Field: Clearing a Regional Data Hall for Reuse
Projects of this type in the Central Texas market often follow a similar pattern: a facility that supported a prior tenant or an earlier generation of IT infrastructure needs the data hall returned to a clean, reusable shell. On comparable projects, our team typically begins by confirming which circuits and mechanical systems are still live, documenting the existing rack layout and containment configuration, and building a removal sequence that moves row by row rather than tearing out infrastructure at random. Cabinets and containment come down first, followed by raised floor and understructure, with cable tray and abandoned cabling removed in coordination with the floor work. PDUs, RPPs and busway are de-energized and removed once the facility’s electrical team confirms isolation. Recoverable rack, containment and cabling material is segregated for resale or recycling throughout the process rather than mixed into a single demolition stream. The result is a data hall ready for a new tenant, a renovation, or a different use entirely — delivered on a schedule that respects lease turnover dates and building access windows.

Coordinating With Facility Stakeholders
White space decommissioning rarely happens in isolation. Landlords, property managers, IT teams, facility engineers, general contractors and sometimes the incoming tenant all have a stake in how the space is left. Clear documentation of what’s being removed, what stays, and what condition the floor and ceiling grid need to be in at turnover helps avoid disputes later. On leased space in particular, confirming the exact turnover condition required by the lease — bare shell, floor-ready, or a specific power and cooling infrastructure baseline — should happen before removal work starts, not after.
Serving Temple and the Surrounding Central Texas Corridor
USA Decom provides data center white space decommissioning services in Temple and throughout the surrounding I-35 corridor, including Belton, Killeen, Waco, Georgetown, Round Rock and the broader Austin metro area to the south. This region has built a substantial base of industrial, logistics and manufacturing space tied to food processing, advanced materials, building products and distribution, and that base has increasingly come to include enterprise, colocation and telecom infrastructure alongside it. As hyperscale development continues to reshape the local market, facilities operating data halls of any size in this region may find themselves reassessing space they no longer need in its current form.
Planning Your White Space Decommissioning Project
If your facility has a data hall that needs to be cleared — whether due to a lease turnover, tenant departure, IT consolidation or facility repurposing — use the form below to tell our team about the project. Helpful details include the facility location and access conditions, approximate rack count or square footage of the white space, whether raised floor and containment are involved, the condition of any remaining PDUs, RPPs or busway, current power status, target turnover date, and photographs of the space if available. That information lets us evaluate the scope and put together a realistic plan for clearing your data hall and getting the space ready for its next use.