A facilities team recently inherited a former colocation suite inside a converted industrial building near the rail corridor east of downtown San Bernardino. The company had leased the shell for warehouse racking, but roughly 14,000 square feet of the building was still configured as a raised-floor data hall — close to 300 server cabinets, overhead cable tray running the length of six rows, hot aisle containment panels bolted to the tops of the cabinets, and a scattering of PDUs and remote power panels still energized from a previous tenant’s build-out. The new occupant didn’t need any of it. They needed an open, load-rated concrete floor they could turn over to a racking and conveyor contractor within about ten weeks. That kind of project — a data hall that has outlived its original purpose and needs to come out cleanly so the space can be reused — is the core of white space decommissioning, and it’s a project type that fits naturally into the Inland Empire’s industrial and logistics-heavy building stock.
What White Space Decommissioning Actually Covers
White space decommissioning is narrower than a full data center decommissioning project. It focuses specifically on the data hall itself — the physical room where IT equipment operated — rather than the building’s central plant, generators or overall facility systems. In practice that means removing server and network racks and cabinets, pulling up and disposing of or salvaging raised access floor panels and the supporting pedestal grid, taking down overhead ladder rack and cable tray, and stripping out the fiber and copper cabling that ran beneath the floor or above the racks. It also typically includes hot-aisle or cold-aisle containment structures, power distribution units and remote power panels (RPPs), overhead or underfloor busway, and the CRAC or CRAH units that served the room directly. Fire-suppression components tied specifically to the white space — pre-action piping, VESDA sampling tubes, discharge nozzles — are often part of the scope as well, depending on what the building owner wants removed versus left in place for future tenants.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
This is different from a data center equipment removal project, which might target a specific system like generators or UPS independent of the room itself, and different from a complete data center decommissioning, which addresses the entire facility including mechanical and electrical plant outside the white space. White space work is defined by the boundary of the room: the goal is a cleared data hall that a new tenant, a renovation contractor or a property owner can reuse for another purpose, whether that’s warehouse space, office build-out, light manufacturing or a fresh data center fit-out.
Why San Bernardino Facilities End Up With This Scope
San Bernardino sits within the Inland Empire, one of the largest logistics and industrial real estate corridors on the West Coast, anchored by rail access, major freeway interchanges along I-10 and I-215, and proximity to the ports of Los Angeles and Long Beach. That industrial base means buildings change use and ownership regularly, and a building that once housed a corporate data center, telecom switch room or colocation build-out can end up in the hands of a distribution company, manufacturer or third-party logistics operator with no use for a raised-floor server room. When that happens, the incoming tenant typically wants clear floor space, adequate ceiling clearance and a slab ready for racking, conveyor systems or production equipment rather than legacy IT infrastructure. Building repositioning of this kind is part of why white space decommissioning work surfaces inside industrial and flex buildings across the region, not only within dedicated data center campuses.
Property owners and asset managers repositioning older commercial or flex buildings, telecom carriers vacating switch or POP rooms, and enterprises consolidating IT operations into colocation or cloud environments are common sources of this work. In each case, the driver is usually the same: the space is more valuable empty than occupied by obsolete infrastructure.
Scoping the Room Before Work Begins
A useful white space decommissioning scope starts with a walkthrough that documents what’s actually in the room, not just what’s on a floor plan from the original build-out. Racks and cabinets get counted and, where practical, tagged with manufacturer and model — Chatsworth/CPI, APC/Schneider, Rittal, Panduit, Vertiv, Great Lakes and Eaton/Legrand-branded frames all show up in Inland Empire facilities depending on when the room was built and which integrator handled the original deployment. Cabinet count and square footage set the pace of the project: a 2,500-square-foot server room with 50 cabinets is a very different schedule than an 80,000-square-foot data hall with 900 or more cabinets, and the crew size, equipment staging and disposal logistics scale accordingly.
The raised floor system matters just as much as the racks sitting on it. Tate, ASM, Haworth and Kingspan panels — along with older legacy systems still found in buildings converted decades ago — vary in panel construction, understructure type and load rating, which affects how quickly the floor can be pulled and whether the pedestal grid and stringers can be salvaged or need to be scrapped. Overhead infrastructure gets the same treatment: ladder rack, cable tray and containment framing from manufacturers like Chatsworth, Panduit, Legrand and Cablofil, along with structured cabling from providers such as Corning, CommScope and Belden, all need to be identified before removal sequencing is finalized, particularly where cabling runs into adjacent occupied spaces that need to stay in service during the project.

Power Infrastructure Inside the White Space
The electrical layer inside a data hall is often the part that requires the most coordination before demolition can start. PDUs, RPPs and overhead or underfloor busway — whether from Vertiv/Liebert, Eaton, APC/Schneider, PDI, Square D or Starline — need to be de-energized and properly isolated by qualified personnel before physical removal, and circuits feeding the room have to be traced back to source panels so nothing is disconnected out of sequence. Overhead track busway systems in particular are built to be reconfigured rather than simply cut, and a systematic teardown that follows the manufacturer’s intended disassembly approach reduces the chance of damaging plug-in units or bus sections that may still have resale value. Where hot-aisle or cold-aisle containment is integrated with the cabinet rows — common with APC/Schneider, Vertiv, Chatsworth, Subzero Engineering or Tate containment systems — removal has to account for how the containment interfaces with the ceiling grid, cabinet tops and any fire-suppression components running through or above it.
CRAC and CRAH units serving the white space are generally within scope as well, though whether the central chilled-water plant or condenser loop feeding those units is also being decommissioned depends on the overall project. Coordinating with the building’s mechanical and electrical trades — or with the incoming tenant’s engineer — early in the process helps avoid conflicts between what’s being removed and what’s staying in service for the rest of the building.
Sequencing a Data Hall Teardown
Most white space projects follow a general sequence, adjusted for site-specific conditions:
- Confirm the room is fully de-energized and isolated from active building systems, with lockout/tagout procedures applied to circuits, busway and any equipment still connected to utility or backup power.
- Disconnect and remove structured cabling, then take down overhead ladder rack, cable tray and containment framing before working at floor level.
- Remove server racks and cabinets, staging reusable units separately from those headed to scrap or recycling.
- Pull raised floor panels and disassemble the pedestal and stringer grid, exposing the structural slab.
- Address any remaining fire-suppression components, floor boxes, grounding infrastructure and abandoned conduit before final floor cleaning and inspection.
Working this sequence in the wrong order — pulling floor panels before the overhead infrastructure and cabling are cleared, for example — tends to create unnecessary rework and safety hazards, since technicians end up navigating open floor voids while still handling material overhead.
Working Around Active Operations
White space decommissioning often happens inside buildings where other parts of the facility remain occupied — a warehouse operation running in an adjacent bay, office staff working one floor above, or a building that’s mid-transition between tenants. That reality shapes how the work gets planned. Noise, dust control, material staging and loading dock scheduling all need to be worked out in advance so the decommissioning crew isn’t competing with ongoing operations for the same freight elevator, dock door or parking area. In large-format industrial buildings with limited interior access points, which are common throughout the Inland Empire, early coordination on staging areas and haul routes is especially important — a room full of cabinets, floor panels and cable tray generates a substantial volume of material that has to move out through a defined path without disrupting the rest of the building.
Recovering Value From the Removed Infrastructure
Not everything coming out of a data hall is scrap. Server racks and cabinets in reusable condition, raised floor panels and understructure components, containment panels, PDUs, busway sections and even structured cabling can carry resale or reuse value depending on manufacturer, age, condition and completeness. Steel, copper and aluminum content in cabling, busway and floor grid components also carries commodity value once separated and processed correctly. Identifying which components are worth recovering, refurbishing or reselling — rather than sending everything straight to a scrap bin — can meaningfully offset the overall cost of clearing the room, though the recoverable value varies significantly from project to project and shouldn’t be assumed before the equipment is actually inspected.
Turning the Room Back Over

Returning to the San Bernardino project described earlier: once the electrical infrastructure is properly isolated and the cabling, containment and overhead pathway are cleared, a room like that generally comes down in stages — cabinets and reusable equipment staged and removed first, followed by the raised floor system, then final restoration of the exposed slab. On a project of that scale, a data hall in the 10,000-to-15,000-square-foot range with a few hundred cabinets is a realistic multi-week effort rather than a multi-day one, particularly when floor coring, patching or minor structural repair is needed once the pedestal grid comes out. The end result the incoming tenant is looking for is straightforward: an open, swept, load-rated floor with no abandoned infrastructure left behind, ready to hand off to the next contractor without surprises.
What to Have Ready Before You Reach Out
Projects move faster when we have a clear picture of the room up front. That generally includes the approximate square footage of the white space, cabinet or rack count, whether the raised floor and containment are still in place, whether power to the room has already been shut down or is still live, the building’s access conditions (dock doors, freight elevators, ceiling height, floor loading), and your target turnover date — whether that’s tied to a lease deadline, a new tenant move-in or a renovation schedule. Photographs of the room, even taken quickly on a phone, help our team understand scope before a site visit is ever scheduled.
Nearby Markets We Serve
Along with San Bernardino, our team provides white space decommissioning services throughout the surrounding Inland Empire, including Riverside, Fontana, Rialto, Colton, Redlands, Ontario, Rancho Cucamonga and Victorville. Building turnover and industrial repositioning happen across this corridor, and legacy IT space can surface in office parks, converted flex buildings and industrial facilities throughout the region, not just in traditional data center campuses.
Tell Us About Your Data Hall
If you’re managing a data hall, server room or legacy IT space in San Bernardino or the surrounding Inland Empire that needs to be cleared for reuse, renovation or turnover, use the form below to tell our team about the facility. Let us know the square footage and rack count, the condition of the raised floor and containment, the status of power to the room, site access details, and your target completion date. That information lets us put together a realistic scope and schedule for your project.