Data Center White Space Decommissioning in Palm Springs, California

Clearing a data hall in the Coachella Valley? USA Decom removes racks, flooring, containment and cabling for reuse or turnover.

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

From the Field: Clearing a Data Hall for Its Next Use

A facility team we worked with recently faced a familiar problem: a data hall that had outgrown its original tenant. The racks were still standing, the raised floor was still in place, and hundreds of feet of overhead cable tray still ran the length of the room — but the operation that once filled the space had consolidated elsewhere, and the property owner needed the hall returned to a condition suitable for a new tenant, a different use, or a full renovation. That situation, or something close to it, is the starting point for most white space decommissioning projects we see, including projects across desert markets like the Coachella Valley. The equipment isn’t necessarily broken or obsolete. It’s simply in the way of what the space needs to become next.

Projects like this typically start with a walkthrough to document what’s actually in the room versus what’s on the as-built drawings, because the two rarely match after years of moves, adds and changes. From there, the scope gets built around what stays, what gets pulled for resale or recycling, and what has to be demolished outright to expose slab, ceiling deck or structural elements underneath. A data hall in a desert climate like Palm Springs isn’t fundamentally different from one in any other market from an equipment standpoint, but the logistics of getting crews, equipment and trucks in and out of a facility along the I-10 corridor between Palm Springs and Indio, or at a more remote site closer to the Salton Sea basin, do factor into scheduling and access planning for projects in this region.

What “White Space” Decommissioning Actually Covers

White space decommissioning is narrower than a full data center decommissioning or a general equipment removal project. The scope is specifically the data hall itself — the room where servers, storage and network gear lived — rather than the generator yard, the electrical switchgear rooms, or the building’s mechanical plant. For a project like this, the working scope generally includes:

  • Server and network racks and cabinets, whether open-frame, enclosed, or a mix of legacy and newer enclosures from manufacturers such as APC/Schneider, Chatsworth/CPI, Rittal, Panduit, Vertiv, Eaton, Legrand or Great Lakes
  • Raised access floor systems, including the floor tiles, pedestals, stringers and understructure from manufacturers such as Tate, ASM, Haworth or Kingspan
  • Overhead ladder rack, cable tray, and basket tray systems along with the fiber and copper cabling plant running through them
  • Hot-aisle and cold-aisle containment structures, including panels, doors, ceiling caps and framing
  • PDUs, RPPs and busway systems that distributed power at the rack level
  • CRAC or CRAH units serving the specific white space, along with associated ductwork or piping within the room
  • Fire-suppression components tied to the hall, where included in the project scope
  • Abandoned or orphaned infrastructure — cabling, brackets, conduit and mounting hardware left behind from earlier tenant improvements
  • The goal is a cleared, swept data hall that a new tenant, a general contractor, or the property owner can build on top of — not a partially cleared room with loose cabling still hanging from the ceiling grid or floor tiles missing in random spots.

    Rack and Cabinet Removal Is Rarely a Single Process

    Every data hall we look at has a mix of equipment ages and configurations, and that mix drives how removal actually gets sequenced. Newer enclosed cabinets from manufacturers like Chatsworth’s TeraFrame or Panduit’s Net-Access line are typically bolted together in rows with side panels and roof structures shared between units, which means disassembly has to happen in the right order to avoid damaging adjacent cabinets that may still have resale value. Older open two-post or four-post racks tend to come apart faster but often carry more abandoned cabling and grounding hardware that has to be stripped out separately. Where cabinets are still in reasonably good condition, there’s often a secondary market for reuse, which is worth evaluating before defaulting to scrap. Where cabinets are damaged, outdated, or simply not worth the freight to relocate, recycling the aluminum, steel and copper content is usually the more practical path.

    Containment removal generally happens alongside or immediately after rack removal, since most hot-aisle and cold-aisle containment systems are physically attached to the cabinet rows they enclose. Polycarbonate panels, ceiling caps and containment doors from systems built around Chatsworth, APC/Schneider, Subzero Engineering or Tate hardware typically come down cleanly if the original installation followed standard mounting patterns, but retrofitted or field-modified containment can take longer to disassemble safely.

    Raised Floor Removal and What’s Underneath

    Raised access floor removal is one of the more consequential decisions in a white space project, because what’s underneath the floor often dictates how much additional work is required before the space can be turned over. Underfloor cabling, abandoned conduit, old cooling ductwork and even leftover construction debris are common finds once floor tiles start coming up. Tate, ASM and Haworth floor systems are generally similar in basic construction — floor panels resting on adjustable pedestals with stringers tying the grid together — but panel weight capacities, understructure bracing and seismic hold-down requirements can vary by system and by original design load, which matters when planning removal sequencing in a room that may still have partial power or active adjacent operations.

    In some projects, the raised floor stays in place because the next tenant plans to use the space for another IT deployment. In others, the floor comes out entirely to expose the slab for a different use altogether — office space, light industrial use, or a different mechanical layout. Either outcome changes the labor and disposal plan significantly, which is why floor disposition needs to be settled early rather than decided mid-project.

    Cabling, Cable Tray and the Overhead Infrastructure

    Overhead infrastructure tends to accumulate over a data hall’s operating life far beyond what current drawings show. Cable tray and ladder rack from Chatsworth/CPI, Panduit, Legrand or Cablofil typically stays structurally sound for years, but the fiber and copper cabling running through it — much of it from providers like Corning, CommScope or Belden — often includes abandoned runs from equipment that was decommissioned in place years earlier without ever pulling the cable. Stripping this out means identifying what’s live, what’s dead, and what’s simply unlabeled, then removing tray, basket and cabling systematically rather than cutting first and asking questions later. On active or partially active floors, this step requires close coordination with facility staff or the IT team managing the transition, since a mislabeled cable run can take down equipment that’s supposed to stay operational.

    Power Distribution Within the Hall

    PDUs, RPPs and overhead or underfloor busway are usually the last major electrical components to come out, since they’re often still energized until close to the end of the project. Equipment from Vertiv/Liebert, Eaton, APC/Schneider, PDI or Starline requires proper de-energization and disconnect sequencing before removal, coordinated with whoever is managing electrical isolation for the space. Busway in particular, whether overhead trunking or underfloor runs, often extends beyond the immediate white space into adjacent rooms or risers, so the removal boundary has to be clearly defined against the rest of the building’s electrical infrastructure rather than left ambiguous.

    Scale Varies More Than People Expect

    White space projects range widely in size, and the approach scales with the room. We see everything from a single hall with 50 or so racks and roughly 2,500 square feet of raised floor, up through large-format halls running 900-plus racks across 80,000 or more square feet. A smaller hall can sometimes be cleared in a matter of days with a compact crew, while a large-format hall with extensive containment, dense underfloor cabling and multiple PDU rows requires a phased schedule, staged loadout, and more deliberate sequencing to avoid disrupting any adjacent operations that remain live in the same building. Property owners and facility managers evaluating a project should think in terms of rack count, square footage, and how much of the room’s infrastructure is still energized, since those three factors drive most of the schedule and labor estimate.

    Asset Recovery Within the White Space

    Not everything pulled from a data hall is scrap. Enclosed cabinets in serviceable condition, higher-value containment components, and certain PDU or busway assemblies can sometimes be resold or reused rather than recycled outright, which can offset a portion of the overall removal cost. That determination depends on manufacturer, age, condition, completeness and current demand for that particular equipment category, so it’s not something that can be assumed before a walkthrough. Copper and aluminum content in cable tray, busway and cabling itself also has scrap value that factors into project economics, separate from any equipment resale potential. We evaluate this alongside the removal scope rather than treating disposition as an afterthought, since the answer affects both the project cost and the schedule for getting the space cleared.

    Coordinating Work in an Occupied or Adjacent-Use Building

    White space projects in mixed-use or multi-tenant buildings — a common setting across the Palm Springs and greater Coachella Valley area — often need to proceed while other tenants, other floors, or other parts of the same facility remain occupied and operating. That reality shapes almost every logistical decision on the project, from what hours crews can work, to how materials move through common corridors and loading areas, to how noise, dust and vibration from disassembly are managed near active space. The Coachella Valley’s mix of commercial, hospitality, light-industrial and technology-related development along the I-10 corridor between Palm Springs and Indio means facilities in this region are periodically adapted, repositioned or repurposed for new uses, and white space decommissioning is often part of that kind of transition. A white space project in this kind of environment needs a plan built around the building’s actual operating conditions, not a generic checklist.

    Returning to the Project: How This Kind of Work Wraps Up

    Back to the situation that opened this page: on a project of that scope, work generally proceeds hall by hall or row by row, starting with power-down and disconnect of PDUs and busway, followed by systematic removal of cabling and overhead tray, then containment and rack disassembly, and finally the raised floor and any remaining underfloor material. Reusable cabinets and recoverable equipment get segregated and staged separately from scrap and demolition debris throughout, rather than sorted after the fact. By the time the room is turned over, the floor is swept, the ceiling grid is clear, and the space is ready for whatever comes next — a new IT deployment, a different commercial use, or a full renovation. That’s the outcome property owners and facility teams in this market look for, and it’s the standard we plan every white space project around.

    Tell Us About Your Data Hall

    If you’re managing a data hall in Palm Springs, Palm Desert, Cathedral City, Rancho Mirage, Indio, Coachella, Desert Hot Springs or elsewhere in the Coachella Valley that needs to be cleared for turnover, renovation or reuse, use the form below to tell our team about the facility. Let us know the approximate r