Los Angeles has grown into one of the more established data center markets on the West Coast, anchored by dense colocation buildings downtown and larger purpose-built data center campuses in El Segundo, an area long associated with lower-cost municipal power available through the LADWP service territory. As that market matures, data halls originally built one or two decades ago are periodically emptied out through lease turnovers, tenant consolidations, technology refreshes and full-building repositioning projects. When that happens, someone has to physically clear the white space, and that work looks very different from decommissioning a whole facility or pulling individual pieces of equipment.
White space decommissioning is specifically about the data hall itself: the racks and cabinets, the raised access floor, the overhead cable tray and ladder rack, the copper and fiber cabling, the containment systems, and the power distribution hardware that served the IT load. It does not necessarily involve the generators, chillers or building-level electrical infrastructure that support the facility as a whole — those fall under separate scopes such as data center equipment removal or complete data center decommissioning. Our focus here is delivering an empty, cleared data hall that a landlord, buyer or new tenant can build back into a functioning space, whether that’s another data center, office space, light industrial use or something else entirely.
Why Data Halls Get Cleared
A white space clearing project in the Los Angeles market usually starts with one of a handful of business drivers. A colocation tenant may be consolidating racks into a newer facility and handing back a suite at lease expiration. A building owner may be repositioning a legacy data center for redevelopment or a different tenant use. An enterprise IT department may be retiring an on-premise data hall as workloads move to the cloud or to a hyperscale provider. In each case, the lease, purchase agreement or redevelopment schedule typically defines a hard turnover condition — often a return to a defined base-building state, sometimes down to bare concrete slab.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Understanding that turnover requirement early matters because it drives almost every decision that follows. A tenant handing back 8,000 square feet of raised floor space under a triple-net lease has very different obligations than an owner clearing 60,000 square feet of white space ahead of a full building sale. Reviewing the lease language, purchase agreement or redevelopment scope before mobilizing crews avoids rework and disputes over what “clean” or “turnkey” actually means at closeout.
What’s Inside the Scope
The physical work of white space decommissioning covers everything installed to support the IT environment within the data hall. That generally includes server and network racks and cabinets from manufacturers such as APC/Schneider Electric, Chatsworth Products (CPI), Rittal, Panduit, Vertiv, Great Lakes and Eaton, along with the raised access floor system itself — commonly Tate, ASM, Haworth or Kingspan panels and pedestals, or legacy systems still in service from earlier construction eras. Overhead infrastructure is part of the same footprint: ladder rack, basket tray and cable containment from suppliers like Chatsworth/CPI, Panduit, Legrand and Cablofil, along with the copper and fiber cable plant itself, which may include structured cabling from Corning, CommScope or Belden that has accumulated over multiple tenant fit-outs.
Hot-aisle and cold-aisle containment — vertical wall panels, ceiling panels, doors and roof structures from manufacturers such as APC/Schneider, Vertiv, Chatsworth, Subzero Engineering or Tate — needs to come down along with the racks it surrounds. Power distribution within the white space is its own category of work: PDUs and remote power panels (RPPs) from Vertiv/Liebert, Eaton, APC/Schneider or PDI, and in many newer or renovated halls, overhead busway systems such as Starline or Square D track busway feeding the rack rows directly. CRAC and CRAH units serving the hall are typically removed as part of a white space clearing scope as well, since they’re dedicated to cooling that specific space rather than serving the building broadly. Fire suppression components tied specifically to the data hall — pre-action piping, VESDA sampling tubes, or hall-specific detection heads — are addressed where included in the scope, coordinated with the appropriate life-safety trades.
One detail that’s easy to overlook in older LA facilities is abandoned infrastructure: cabling, power whips, and even rack hardware left behind by tenants that vacated years earlier without a full teardown. A thorough walk of the space before scoping the project, rather than relying on outdated as-built drawings, is the only reliable way to capture everything that actually needs to come out.

Planning the Sequence Before Anyone Touches a Rack
Clearing a data hall efficiently depends on sequencing decisions made before demolition starts. The first question is almost always whether the space is fully de-energized or whether adjacent suites, cages or floors remain live. In multi-tenant colocation buildings — a characteristic found in portions of the downtown LA and El Segundo market — a white space project frequently runs next to occupied space, which means establishing firm work-zone boundaries, coordinating shared building systems like fire alarm and access control, and scheduling noisier or more disruptive work (raised floor demolition, overhead tray removal) during windows that won’t affect neighboring tenants.
Electrical isolation is verified circuit by circuit rather than assumed from a single-line diagram, particularly in halls that have been reconfigured multiple times. Once power is confirmed down to the rack level, the typical sequence moves from top to bottom and inside-out: cabling and fiber first, then overhead tray and containment, then racks and cabinets, then in-floor power whips and cooling piping, and finally the raised floor panels and pedestal grid itself. Working in that order avoids damaging recoverable assets and keeps the crew working in a logical, safe progression rather than creating hazards from partially disconnected overhead systems.
Removal, Rigging and Floor Loading in Multi-Story Buildings
A portion of the Los Angeles colocation market operates out of multi-story buildings — downtown high-rises repurposed for data center use are a notable feature of this market — which introduces logistics that a single-story suburban data center in El Segundo or the Inland Empire doesn’t have. Freight elevator size and weight capacity, loading dock access, and the building’s material-handling schedule all affect how quickly racks, floor panels and cable can move out of the building. A 40U cabinet loaded with legacy switching gear can weigh several hundred pounds; moving dozens or hundreds of them through a shared freight elevator during defined building hours requires real scheduling discipline, not just labor.
Raised floor removal adds its own considerations. Once panels come up, the underfloor plenum is exposed, and any remaining cabling, conduit or cooling piping in that plenum needs to be identified and cleared before the pedestal grid and stringers come out. In buildings where the data hall sits above occupied space below, floor loading and any structural questions tied to the original slab design are worth confirming with the building engineer or a structural professional before large-scale demolition debris starts staging on the floor.
Recycling and Asset Recovery in the White Space
Not everything coming out of a data hall is scrap. Rack and cabinet hardware, PDUs, busway components, structured cabling, and even raised floor panels in good condition can carry resale or reuse value depending on manufacturer, age, condition and completeness. A Chatsworth or APC cabinet in serviceable condition, a run of Starline busway with its plug-in units intact, or a quantity of Tate or Haworth floor panels salvaged in good shape can sometimes be resold or redeployed rather than scrapped outright, and copper cable, aluminum tray and structured steel components generally carry recyclable commodity value even when direct reuse isn’t practical.
Recoverable value depends heavily on the specifics — manufacturer, model, age, condition, and how much volume is involved — and it can offset a portion of the overall removal cost on larger projects, though it shouldn’t be assumed to cover the full scope. Sorting and staging materials by category as they come out of the hall, rather than mixing everything into a single dumpster, is what makes that recovery possible in the first place.

Real-World Project Examples
Projects we’ve handled in this category have ranged from clearing a single-tenant suite of roughly 50 to 100 racks ahead of a lease turnover, up through much larger data halls covering tens of thousands of square feet with several hundred cabinets, full raised floor systems, and extensive overhead cable plant accumulated over years of tenant changes. On smaller suites, the work often moves quickly once power is confirmed down, since the footprint is contained and material handling is straightforward. On larger halls — the kind found in some of the bigger El Segundo campuses or converted downtown buildings — the project typically breaks into zones so that cabling, containment, rack removal and floor demolition can proceed in a rolling sequence rather than waiting for one phase to finish across the entire space before starting the next.
A common thread across projects of this type is that the turnover standard defined in the lease or purchase agreement drives the level of finish required at completion — whether that means leaving a clean concrete slab, restoring finished flooring, or simply removing IT infrastructure while leaving base-building mechanical and electrical systems intact for the next tenant.
Nearby Markets We Serve
Los Angeles data hall projects often connect to activity across the broader Southern California region. In addition to downtown LA and El Segundo, USA Decom provides white space decommissioning services to facilities throughout the San Fernando Valley, Long Beach, Orange County, the Inland Empire around Ontario and Riverside, and Santa Monica and the Westside submarkets. Given the concentration of colocation and enterprise space across these areas, many white space projects also connect naturally to broader facility turnover or redevelopment work happening in the same buildings.
Tell Us About Your Data Hall
If you’re managing a lease turnover, consolidation or redevelopment that requires clearing a data hall in Los Angeles or anywhere across Southern California, use the form below to tell our team about the space. Helpful details include the square footage or rack count involved, the building type and floor level, whether the space is still energized, the turnover condition required by your lease or agreement, target completion dates, and any photos of the racks, floor system or overhead infrastructure you can share. That information lets us put together an accurate plan for sequencing, logistics and disposition before your deadline arrives.