Data Center White Space Decommissioning in Long Beach, CA

Clearing a data hall is a different job than shutting down an entire data center. The white space decommissioning work happens after the operational decisions have already been made — the racks are coming out, the raised floor is coming up, and someone needs to turn that room back into usable, empty space. In a market like Long Beach, where industrial buildings get repurposed, subdivided, released or redeveloped on a regular basis, that white space clearing work often has a hard deadline attached to it: a lease turnover date, a new tenant’s build-out schedule, or a facility renovation that can’t start until the room is empty.

USA Decom provides data center white space decommissioning services in Long Beach and throughout the surrounding Los Angeles and Orange County industrial markets. This work is focused specifically on the data hall itself — the racks, flooring, containment, cabling and electrical distribution that filled the room — rather than the broader mechanical and electrical plant that supported the facility. If your project also involves generators, UPS systems, CRAC/CRAH units outside the hall, or a full facility shutdown, that falls under a different scope of work; this page addresses the white space itself.

What White Space Decommissioning Actually Covers

A data hall clearing project typically touches every system a technician or operator would have seen while standing inside the room:

  • Server and network racks and cabinets, whether standard 42U enclosures, wide/deep colocation frames, or open two-post relay racks
  • Raised access floor panels, pedestals, stringers and understructure
  • Overhead ladder rack, cable tray and cable basket systems

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

  • Copper and fiber cabling, patch panels, trunk assemblies and abandoned cable runs
  • Hot-aisle and cold-aisle containment panels, doors, roof structures and curtain systems
  • Power distribution units (PDUs), remote power panels (RPPs) and overhead or underfloor busway
  • CRAC and CRAH units serving the white space directly, along with associated ductwork and piping stubs
  • Fire-suppression components tied to the hall, such as clean-agent piping, nozzles and detection devices where included in scope
  • Grounding and bonding infrastructure, seismic bracing and abandoned support hardware left behind by prior IT deployments

Our experience with this type of work spans rooms ranging from a 50-rack colocation suite to white space environments exceeding several hundred cabinets across tens of thousands of square feet. The approach scales with the room, but the underlying sequence — disconnect, disassemble, extract, restore — stays consistent whether the hall is 2,500 square feet or 80,000.

Why Property Owners and Operators in Long Beach Need This Service

Long Beach’s industrial tenant base includes logistics and distribution operations drawn by port proximity and 710 freeway access, alongside e-commerce fulfillment, aerospace and manufacturing tenants. Buildings originally built out with server rooms, network operations centers or small colocation suites can change hands as this industrial base turns over. When a distribution operator relocates, a tenant downsizes its IT footprint, or a building is repositioned for a new use, the data hall left behind rarely matches what the next tenant needs.

Industrial space in Long Beach ranges from smaller multi-tenant buildings to large distribution centers spanning several hundred thousand square feet, and some of these buildings include server rooms or purpose-built white space that once supported warehouse management systems, network operations, or enterprise IT before consolidation, cloud migration or lease expiration made the room unnecessary. Whether the building sits near the port corridor, along the 405/710 interchange, or in the Bixby Knolls and North Long Beach industrial corridors, the same basic problem shows up: a room full of racks, raised floor and cabling that has to come out before the space can be leased, renovated or turned over to a landlord.

Planning the Scope Before Work Begins

A useful white space decommissioning quote starts with a walk-through or a detailed set of photos and documentation, not a guess. Before our team can put together an accurate scope, we typically need to understand:

  • Approximate rack count and cabinet types (standard, wide, deep, open-frame, secured cages)
  • Square footage of the white space and whether raised floor is present, and to what height
  • Whether containment is in place — hot-aisle, cold-aisle, or chimney/vertical exhaust systems
  • PDU and RPP quantities, along with whether power is fed via overhead busway, underfloor whip, or hardwired circuits
  • Current power status — is the room still live, partially de-energized, or already shut down
  • CRAC/CRAH unit count and whether cooling is still operating during the project
  • Fiber and copper cabling volume, and whether any circuits need to remain active for other parts of the building
  • Building access conditions — loading dock availability, freight elevator dimensions, door widths, floor loading limits and after-hours access requirements
  • The condition the room needs to be in at turnover — swept slab, patched floor, or simply cleared of equipment

This information lets us sequence the work correctly and price it accurately rather than relying on a rough estimate that changes once the crew is on site.

Shutdown Sequencing and Electrical Coordination

White space clearing almost always starts with de-energizing the room in the correct order. Racks and PDUs need to be confirmed dead before disconnection begins, and any circuits still feeding equipment elsewhere in the building need to be identified and protected. On a live or partially live floor, this coordination matters — cutting the wrong whip or pulling the wrong breaker in a shared electrical room can affect systems well outside the white space itself.

Our teams work with facility engineers, electricians or the customer’s own operations staff to confirm isolation points before any cabinet is unbolted or any busway section is dropped. Where PDUs, RPPs or busway (commonly Eaton, Square D, Starline, PDI, Vertiv/Liebert or APC/Schneider equipment) are still tied into active building power, that equipment gets disconnected and de-energized under proper lockout procedures before removal.

Rack, Containment and Cabling Removal

Once the room is confirmed safe to work in, removal generally proceeds hall by hall or row by row. Cabinets from manufacturers such as APC/Schneider, Chatsworth/CPI, Rittal, Panduit, Vertiv, Great Lakes, Eaton and Legrand are unbolted from raised floor or slab anchoring, disassembled where necessary for extraction, and staged for transport. Seismic bracing and floor-mounted rack supports — common in California installations — get removed along with the cabinets themselves.

Containment systems, whether APC/Schneider, Vertiv, Chatsworth, Subzero Engineering or Tate hot-aisle/cold-aisle structures, come down next. Overhead cable tray, ladder rack and basket systems (frequently Chatsworth/CPI, Panduit, Legrand or Cablofil products) get disconnected from structural hangers and lowered. Abandoned copper and fiber cabling — often including Corning, CommScope or Belden fiber runs and patch infrastructure — is pulled from tray and conduit and separated for recycling or disposal, since abandoned cable left in place can create rework during a future tenant’s build-out.

Raised Floor Removal and Slab Restoration

Raised access floor removal is its own discrete phase. Floor systems from manufacturers such as Tate, ASM, Haworth or Kingspan, along with older legacy systems still found in some existing rooms, are typically removed panel by panel, with pedestals and stringers pulled and staged separately from the floor tiles themselves. Concrete-filled panels are considerably heavier than hollow all-steel panels, which affects both labor sequencing and disposal logistics.

Once the raised floor is out, the subfloor plenum is usually left holding years of abandoned underfloor cabling, cooling piping stubs and hardware that accumulated over the room’s operating life. Clearing the plenum thoroughly matters if the customer’s turnover requirement includes a swept, patched slab ready for a new tenant’s flooring, racking, or general commercial build-out.

Case Studies from the Field

Data hall clearing projects tend to follow a similar arc regardless of exact size. On projects involving a mid-size colocation suite of roughly 150 cabinets across a raised-floor hall of approximately 12,000 square feet, our sequence typically starts with confirming isolation on every PDU and RPP circuit, then moves through rack disconnection, containment teardown, cable tray removal, and finally raised floor extraction down to bare slab. On larger projects — halls approaching 400 to 600 racks — the same sequence applies but gets broken into zones so that portions of the room can be handed back to the property owner in phases rather than all at once, which matters when a landlord is trying to market part of the space while decommissioning finishes elsewhere.

Smaller enterprise server rooms, sometimes as compact as 50 to 75 racks in a converted office or industrial suite, follow the same fundamentals at a smaller scale: confirm power status, remove IT assets first if the customer is handling those separately, clear containment and cabling, then pull flooring and restore the slab. Regardless of scale, the goal stays the same — a room the property owner can hand off for reuse, renovation or lease-up without a residual data center footprint left behind.

Asset Recovery and Recycling Considerations

Not everything coming out of a data hall is scrap. Rack and cabinet frames in reasonable condition, containment components, PDUs and busway sections, and raised floor systems can sometimes carry resale or reuse value depending on manufacturer, age, condition, completeness and current secondary-market demand for that particular equipment. Copper cabling and aluminum/steel framing also carry recyclable commodity value that can help offset a portion of the overall project cost.

We evaluate what’s coming out of the room as part of the removal process and identify what may be worth recovering before it gets treated as scrap. This isn’t guaranteed on every item, and recovered value depends heavily on condition and market demand at the time of the project, but it’s worth accounting for during scope development rather than assuming everything goes straight to a disposal bin.

Transportation, Logistics and Building Access in the Long Beach Market

Getting equipment out of a data hall and off the property is often more constrained than getting it in originally, especially in older office or industrial buildings retrofitted with server rooms years after original construction. Freight elevator dimensions, loading dock height, door widths, and floor loading limits all affect how quickly cabinets, floor panels and containment sections can move from the white space to a staging area and onto a truck.

Long Beach’s position along the 710 corridor near the San Pedro Bay port complex means truck access and scheduling around surrounding freight traffic is a practical consideration for larger loadouts, particularly for projects near the port-adjacent industrial areas or along heavily used freight routes. For multi-day or multi-phase projects, staging materials in a controlled sequence — rather than accumulating debris in hallways or loading areas — keeps the building’s other tenants and operations unaffected while the work proceeds.

Serving Long Beach and the Surrounding Region

USA Decom provides data center white space decommissioning services throughout Long Beach and neighboring Southern California industrial markets, including Signal Hill, Carson, Compton, Torrance, Lakewood, Cerritos, and the broader Los Angeles and Orange County metro area. Whether the project is a single server room in a Long Beach office building or a larger colocation suite tied to a logistics or aerospace-related tenant, the same core process applies: confirm what’s in the room, plan the shutdown and removal sequence, and deliver a cleared space ready for its next use.

Tell Us About Your Data Hall

If you’re planning to clear a data hall in Long Beach or the surrounding area, use the form below to tell our team about the room — approximate rack count, square footage, whether raised floor and containment are present, current power status, building access conditions, and your target turnover date. That information lets us put together an accurate scope and a realistic schedule instead of a rough guess, and it’s the fastest way to get your project moving toward the outcome you need: an empty, ready-to-use white space.

Related Posts