A data hall that has reached the end of its operational life doesn’t stop being a liability just because the servers have been powered down. Racks still occupy the floor, raised access flooring still needs to come up, overhead cable tray still hangs from the structure, and containment panels, PDUs and busway remain wired into a space someone else is waiting to use. In Irving, home to a mix of converted office buildings, former telecom hubs and purpose-built colocation campuses that support data center operations, this kind of project comes up when operators retire legacy halls, consolidate into newer facilities, or hand raised-floor space back to a landlord for redevelopment.
Irving’s position along the Loop 12 and State Highway 183/114 corridor, close to DFW International Airport and within the Las Colinas business district, places it within a broader North Texas data center market that includes enterprise data centers, telecom carrier facilities and multi-tenant colocation buildings. Many of these properties were originally built during earlier waves of telecom and IT infrastructure development and have since been renovated, expanded or repurposed. As newer facilities come online elsewhere in the metro, some of this older capacity is retired, downsized or converted to other uses, and that transition often starts with clearing out an existing white space.
USA Decom works with facility owners, colocation operators, IT directors and property managers throughout Irving and the surrounding Dallas-Fort Worth market to plan and execute white space decommissioning projects. This page focuses specifically on clearing the data hall itself, distinct from broader data center decommissioning or targeted equipment removal, and explains what the work typically involves.
What White Space Decommissioning Actually Covers
White space decommissioning is the process of returning an active or formerly active data hall to a clean, reusable condition. Unlike a full facility decommissioning project, which addresses an entire building and its support infrastructure, white space work is scoped to the raised-floor environment itself: the racks and cabinets, the flooring system beneath them, the containment and cable infrastructure above and around them, and the power distribution equipment feeding them. A typical scope includes:
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Server and network racks and cabinets, whether two-post, four-post or fully enclosed enclosures
- Raised access flooring, including tile removal, pedestal and stringer disassembly, and subfloor cleanup
- Overhead ladder rack, cable tray and cable basket, along with abandoned fiber and copper cabling
- Hot-aisle and cold-aisle containment systems, including doors, roof panels and curtain walls
- Power distribution units (PDUs), remote power panels (RPPs) and overhead or underfloor busway
- CRAC and CRAH units serving the specific hall being cleared
- Fire-suppression components tied to the white space, where included in the scope
- Abandoned infrastructure left behind by prior tenants or previous IT refresh cycles
The end goal is a data hall that a landlord, buyer or new tenant can walk into and immediately begin evaluating for renovation, re-tenanting or a completely different use, whether that’s a new white space build-out, general office conversion, or light industrial reuse.
Why Irving Facilities Take On This Work
Several recurring situations drive white space clearance projects. A colocation provider may be consolidating tenants out of an older hall into upgraded space within the same building or a newer campus nearby, leaving a vacated raised-floor area that needs to be cleared before it can be re-leased or redesigned. An enterprise IT department may be exiting a legacy on-premises data center as workloads move to cloud providers or a purpose-built colo facility, requiring the company to return leased space in a condition that satisfies lease-end obligations. A building owner acquiring a former telecom or data center property may need the existing raised floor and cabling infrastructure removed before repositioning the space for a new tenant whose requirements don’t match the legacy build-out.
Each of these scenarios comes with its own pressure points. A lease-end project usually has a hard deadline tied to the landlord’s turnover requirements. A consolidation project often has to work around adjacent halls that remain live, which limits how and when work can happen. A property acquisition project may involve infrastructure that hasn’t been touched in years, with documentation that is incomplete or out of date. Understanding which of these situations applies to a given project shapes how USA Decom approaches scheduling, sequencing and coordination with the other parties involved.

Planning the Scope Before Work Begins
A white space clearance project starts with a walkthrough and scope review, not a demolition plan. Before any equipment comes out, it helps to establish a few things: which systems are within the defined scope versus outside it, whether any racks, containment panels or infrastructure components have resale or reuse value worth preserving intact, what condition the raised floor needs to be in at turnover, and how the work will be sequenced relative to any adjacent live operations.
Facility size matters here. A single retired colocation suite might involve 50 to 150 racks across a few thousand square feet, while a full legacy data center floor being returned to a landlord can involve several hundred cabinets across 20,000, 40,000 or 80,000-plus square feet of raised floor. The approach to a smaller single-suite project, where most work can proceed on a fixed schedule with limited coordination, looks very different from a large multi-phase floor that has to be cleared in sections while other parts of the building remain occupied or under separate ownership review. Knowing the approximate rack count, square footage and current power/mechanical status of the hall lets USA Decom put together a realistic scope and sequence before mobilizing a crew.
Working Through the Physical Removal Sequence
Once the scope is set, white space clearance generally follows a logical order, working from the top of the space down to the subfloor. Overhead cabling and cable tray typically come first, since they need to be cleared before ladder rack and containment can be safely disassembled. Fiber and copper runs are traced, de-terminated where needed, and removed along with abandoned cabling that may have accumulated from multiple IT refresh cycles over the life of the facility.
Containment systems, including hot-aisle and cold-aisle enclosures, roof panels, doors and partition walls from manufacturers such as APC/Schneider, Vertiv, Chatsworth/CPI, Subzero Engineering or Tate, are then disassembled and staged for removal or resale evaluation. Rack and cabinet removal follows, whether the hall is populated with two-post open racks, four-post equipment racks, or fully enclosed cabinets from brands like APC/Schneider, Chatsworth/CPI, Rittal, Panduit, Vertiv, Great Lakes, Eaton or Legrand. Intact, structurally sound cabinets are often good candidates for resale into the secondary market for used data center racks, particularly when they’re a common form factor and in reasonable cosmetic condition.
Power distribution equipment, including PDUs, RPPs and overhead or underfloor busway systems from manufacturers such as Vertiv/Liebert, PDI, Eaton, APC/Schneider, Starline or Square D, requires proper electrical isolation and disconnection before removal, coordinated with whoever is responsible for the building’s electrical systems during the project. CRAC or CRAH units directly serving the hall are addressed as part of the same scope when they’re included, generally following isolation of refrigerant lines and electrical connections consistent with applicable requirements.
Raised access flooring is typically the last major system removed, since it needs to stay intact and functional for equipment movement and staging throughout the earlier phases of the project. Tile, pedestal and stringer systems from manufacturers like Tate, ASM, Haworth or Kingspan are then disassembled, with usable tile and structural components evaluated for reuse or resale where condition allows. Subfloor cleanup, including removal of any abandoned underfloor cabling or conduit, typically follows to leave a clean slab suitable for the next use of the space.
Working Around Active Operations
Many white space projects take place inside buildings where other tenants, other halls, or other floors remain fully operational. That reality drives a lot of the planning conversation before work starts. Fire and life-safety systems that are shared across the building need to stay functional throughout the project, which usually means coordinating any work near fire suppression or detection components with building engineering rather than treating them as an isolated demolition item. Loading dock access, freight elevator scheduling and material staging areas often need to be shared with an active building, so timing removal work around other tenants’ operating hours or delivery schedules becomes part of the sequencing plan. Noise, dust control and floor protection in shared corridors matter more in a multi-tenant building than in a standalone facility being fully vacated.
Coordinating this kind of project usually involves the facility or property manager, the outgoing tenant’s IT and facilities team where applicable, the landlord or receiving party who will take over the space, and in some cases a design or construction team already planning the space’s next use. Clear communication about what’s in scope, what stays, and what the turnover condition needs to look like reduces the chance of rework or disputes once the space changes hands.
Asset Recovery from a Retired Data Hall
A white space that’s being decommissioned often still contains equipment with real secondary-market value. Server and network racks in good condition, particularly common enclosure sizes from established manufacturers, frequently have resale demand. Containment components, raised floor tile and structural pedestals can sometimes be reused in a different facility rather than scrapped. Copper cabling and structured cabling components carry commodity value, and PDUs, busway and RPPs that are still functional may have resale potential depending on age, condition and manufacturer.
Recoverable value from these assets can help offset a portion of the overall project cost, though the actual value depends heavily on condition, completeness, quantity, manufacturer, and current demand in the secondary market. USA Decom evaluates rack and infrastructure inventories as part of the scoping process to identify what’s worth pulling for resale versus what should move directly to recycling or disposal, rather than defaulting to scrap for everything that comes off the floor.

Project Spotlight: Clearing a Legacy Colocation Suite
On a recent project of this type in the North Texas market, our team was brought in to clear a retired colocation suite inside a multi-tenant building where several other halls remained fully operational. The scope covered several hundred cabinets across a raised-floor footprint of roughly 30,000 square feet, along with overhead containment, PDUs and the associated raised access flooring. Because adjoining suites in the building stayed live throughout the project, work was sequenced in phases, with cabling and containment removal scheduled around the building’s freight elevator availability and coordinated with the property’s engineering staff to avoid any disruption to shared fire-suppression and electrical systems. A meaningful portion of the enclosed cabinets were assessed, tagged and pulled for resale rather than scrap, and usable raised floor tile was set aside for the receiving party’s future build-out plans. The suite was turned over as a cleared, swept raised-floor space ready for the landlord’s next tenant improvement project. Projects like this illustrate the phased, coordination-heavy approach that applies to white space work inside occupied buildings throughout North Texas, including facilities in markets like Irving.
Serving Irving and the Surrounding DFW Market
USA Decom provides data center white space decommissioning services in Irving and throughout the surrounding metro, including Las Colinas, Coppell, Grapevine, Farmers Branch, Carrollton, Dallas and Fort Worth. The region’s mix of colocation facilities, converted telecom buildings and enterprise data centers means each white space project comes with its own building vintage, tenant mix and infrastructure history, which is why a scope built around the actual condition of the hall matters more than a generic checklist.
Tell Us About Your White Space Project
If you’re planning to clear a data hall in Irving or anywhere in North Texas, the most useful starting point is a clear picture of the space itself. Use the form below to tell our team about the facility, including the approximate rack count and square footage, the manufacturers and condition of the racks, containment and raised flooring involved, whether the hall is fully powered down or still partially active, any adjacent operations we’d need to work around, your required turnover condition, and your target schedule. Photographs of the current state of the hall are especially helpful for putting together an accurate scope. That information lets USA Decom put together a realistic plan for clearing your white space and identifying what equipment may be worth recovering along the way.