A data hall rarely goes empty for a simple reason. A tenant’s lease ends, a colocation customer consolidates into a newer suite, a hyperscale operator retires a legacy pod ahead of a refresh, or a corporate IT department finally migrates the last workloads off an aging raised-floor room into a wholesale facility or the cloud. Whatever the trigger, the building’s owner is usually left with the same problem: a white space full of cabinets, containment, cabling, and underfloor power and cooling infrastructure that has to come out cleanly before the space can be re-leased, renovated, repowered for a new tenant, or handed back to a landlord.
USA Decom works with facility owners, colocation operators, corporate IT teams and general contractors on exactly this kind of project — clearing the data hall itself rather than the building’s electrical or mechanical plant. In the Dallas-Fort Worth market, where colocation and enterprise data center space is concentrated in established hubs such as the Stemmons Freeway corridor, the Telecom Corridor in Richardson, and the Plano and Carrollton submarkets, white space turnover is a need we’re prepared to support whenever space changes hands between operators, tenants and redevelopment plans.
What White Space Decommissioning Covers
White space decommissioning is narrower than a full data center decommissioning project. It focuses specifically on returning the data hall — the raised-floor room where IT equipment actually lives — to a condition suitable for reuse, renovation or turnover, without necessarily touching the building’s central plant, generators or utility-side electrical gear. A typical scope includes:
- Server, network and storage racks and cabinets
- Raised access flooring, including panels, stringers and pedestals
- Overhead ladder rack, cable tray and cable basket
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Structured fiber and copper cabling, patch panels and cross-connects
- Hot-aisle and cold-aisle containment systems, including doors, roof panels and end caps
- Power distribution units (PDUs), remote power panels (RPPs) and overhead busway
- CRAC and CRAH units serving the white space directly
- Fire-suppression components tied to the room, where included in scope
- Abandoned or “dead” infrastructure left behind by prior tenants or decommissioned deployments
The goal at the end of the project is a cleared, swept data hall — floor tile removed or reset, overhead infrastructure gone, and the room ready for the next tenant’s fit-out, a renovation crew, or a change in building use. That’s a materially different deliverable than removing a handful of racks for an equipment refresh, or decommissioning an entire facility down to the building shell.
Why This Work Comes Up in the Dallas-Fort Worth Market
Dallas-Fort Worth is one of the more established and heavily built-out data center markets in the country, anchored by carrier-dense buildings such as the Infomart on Stemmons Freeway and a long-running concentration of wholesale and enterprise facilities along the Telecom Corridor in Richardson. Additional concentrations of data center capacity have developed near Love Field, in downtown Dallas carrier hotels, and further north into Plano — meaning a substantial amount of white space in this region has been built out, occupied, upgraded and re-tenanted multiple times over the years.
As colocation providers, enterprises and network operators continue to move into newer campuses across the Plano, Garland, Carrollton and Lewisville submarkets, older raised-floor suites in multi-tenant buildings and legacy enterprise data centers are periodically vacated, renovated or repositioned for new use. Every time a suite changes hands or a corporate data hall is retired in favor of colocation or cloud migration, the previous occupant’s infrastructure has to come out before the space is usable again.

Planning the Scope Before Anyone Touches a Rack
A white space clearing project starts with documenting what’s actually in the room, not just what’s on the as-built drawings. Data halls that have been occupied for a decade or more frequently contain equipment, cabling and containment that no longer matches the original design intent — cabinets added outside the original layout, abandoned cabling runs left in overhead tray from prior tenants, containment panels that were modified or patched over the years, and PDUs or RPPs that were relocated or added as power density increased.
Before removal begins, our team typically walks the space with the facility owner or outgoing tenant to confirm:
- Total rack and cabinet count, and whether any equipment remains live or requires separate IT decommissioning by others before physical removal begins
- Raised floor system manufacturer and panel type, since Tate, ASM, Haworth and Kingspan panels and their supporting pedestal/stringer grids are removed differently depending on system and age
- Containment type and manufacturer — hot-aisle or cold-aisle, cabinet-supported or ceiling-supported, and whether panels are reusable or scrap-only
- PDU, RPP and busway configuration, including whether power is still live and what disconnection sequence the facility’s engineering team requires
- CRAC/CRAH count, tonnage and whether units serve only the white space or a broader mechanical loop
- Fire-suppression components included in scope versus systems that remain the building owner’s responsibility
- Any hazardous materials considerations tied to older cabling, batteries or floor adhesives that may require special handling depending on project conditions
This walkthrough drives both the removal sequence and the disposition plan, and it’s also the information that helps us put together an accurate proposal — which is why we ask prospective customers for as much of this detail as they can provide up front, including current photos of the space.
Sequencing the Removal in an Active or Multi-Tenant Building
Very few white space projects happen in a building with nothing else going on. Multi-tenant colocation buildings have neighboring suites still in full production, corporate campuses often have other departments operating nearby, and even a fully vacated facility may share electrical service, fire alarm zones or a loading dock with active tenants. Sequencing has to account for that reality.
A typical approach starts with confirming electrical isolation for the space being cleared — verifying with the facility’s engineering staff or electrical contractor that PDUs, RPPs and busway feeding the white space have been de-energized and locked out before any disconnection work begins. From there, cabling and patch infrastructure usually comes out first, since it runs through and around nearly everything else in the room. Racks and cabinets follow, typically working aisle by aisle to keep the space organized and to make load-out logistics manageable. Overhead containment, ladder rack and cable tray come down once the racks below are cleared, and raised floor removal is generally one of the last steps, since the floor void often still contains cabling or conduit that needs to be identified before panels and pedestals are pulled.
Loading dock access, freight elevator capacity, and floor loading limits all factor into how material moves out of a multi-story building — considerations that matter more in a downtown Dallas carrier hotel with shared building systems than in a single-tenant suburban facility with direct dock access. Coordinating removal windows with building management, particularly around shared elevators or loading docks in multi-tenant properties, is often one of the more time-consuming parts of project planning rather than the physical work itself.
Equipment and Infrastructure Commonly Encountered
White space projects in the Dallas market span a wide range of scale, from a single vacated 2,500 SF suite in a multi-tenant building to an 80,000+ SF hall in a wholesale or hyperscale facility. Rack counts on projects of this type can range from roughly 50 cabinets in a small enterprise room up to 900 or more in a large wholesale data hall. The infrastructure encountered tends to fall into a consistent set of categories regardless of scale.
Rack and cabinet infrastructure from manufacturers such as APC/Schneider Electric, Chatsworth Products (CPI), Rittal, Panduit, Vertiv, Great Lakes Case & Cabinet, Eaton and Legrand is common across both legacy and newer builds. Containment systems are frequently built around Chatsworth, APC/Schneider, Vertiv or Subzero Engineering hardware, and raised floor is most often a Tate system, though older buildings sometimes still have legacy panel types that require different handling during removal. Overhead cable management commonly involves Chatsworth, Panduit or Legrand cable tray and ladder rack, alongside structured cabling infrastructure from providers like Corning, CommScope and Belden. Power distribution at the rack and row level frequently includes Vertiv/Liebert or Eaton PDUs, and a number of Dallas-area halls use Starline or Square D overhead busway rather than traditional whip-and-panel distribution, which changes how that infrastructure is disconnected and removed.
Recognizing what’s actually installed matters for both removal sequencing and disposition. Overhead track busway is typically installed with tap-off boxes distributed along its length rather than a central remote power panel feeding individual whips, so de-energizing and removing a busway run generally follows a different sequence than pulling RPP-and-whip distribution. Flagging which system your facility uses early in the planning process helps us scope the disconnection work correctly.

Asset Recovery in the Data Hall
Not everything that comes out of a data hall belongs in a scrap bin. Depending on age, condition, manufacturer and completeness, cabinets, containment panels, raised floor tile, PDUs and cable management hardware can retain resale or reuse value in the secondary market, particularly for well-known brands in serviceable condition. Copper cabling and structured cabling infrastructure also carries commodity value once separated from other waste streams.
Identifying which materials are worth recovering, refurbishing or reselling — versus which should go straight to recycling or disposal — is part of the planning process rather than an afterthought. A raised floor system in good condition, for example, may have more value intact for resale than as scrap steel, while cabinets that have been heavily modified or damaged over years of service are usually more efficiently processed for material recovery. We can’t guarantee that every item removed from a given space will have resale value, and the recoverable value on a project depends heavily on the specific equipment involved, but incorporating asset recovery into the plan can help offset a portion of overall project cost on the right job.
Project Spotlight: Clearing a Multi-Tenant Colocation Suite
On a recent project of this type in the Dallas-Fort Worth region, our team was engaged to clear a vacated suite within a multi-tenant colocation building after the outgoing tenant’s lease expired. The scope included several hundred cabinets, associated hot-aisle containment, overhead cable tray and structured cabling, PDUs feeding the space, and a full raised floor system that needed to be removed down to the concrete slab per the landlord’s turnover requirements.
Work was sequenced around the building’s active hours and shared loading dock, with material staged and removed during windows coordinated with building management to avoid conflicts with neighboring tenants’ deliveries. Cabling and patch infrastructure came out first, followed by cabinet removal working row by row, then containment and overhead tray, with raised floor removal as the final phase once the underfloor space had been confirmed clear of any remaining conduit or cabling. Recoverable cabinets and floor tile in serviceable condition were separated for resale, while damaged material and scrap steel were processed through recycling channels. The finished space was delivered swept and ready for the landlord’s next tenant improvement build-out.
Projects of this type generally follow a similar pattern regardless of exact size — confirm what’s live versus dead, sequence disconnection and removal around the building’s operating constraints, separate recoverable material as it comes out rather than after the fact, and finish with the floor and slab in the condition the landlord or next occupant expects.
Serving Dallas-Fort Worth and the Surrounding Region
USA Decom provides data center white space decommissioning services throughout Dallas and the broader Metroplex, including Fort Worth, Plano, Richardson, Irving, Carrollton, Garland and Lewisville. Whether your project is a single vacated suite in a downtown carrier hotel or a larger hall in a suburban wholesale campus, the same core planning questions apply: what’s in the room, what’s live, what stays with the building, and what condition the space needs to be in when the work is done.
Tell Us About Your White Space Project
If you’re planning to clear a data hall in the Dallas-Fort Worth area — whether it’s a lease turnover, a tenant consolidation, or a legacy room being retired ahead of renovation — use the form below to share some details about the space. Helpful information includes the facility location, approximate square footage or rack count, what’s currently installed (racks, containment, raised floor, PDUs or busway), whether power is still live, your target turnover date, and any landlord or building requirements for the finished condition. Photos of the current space are especially useful for putting together an accurate scope. Our team will review the details and follow up to discuss next steps.