Amarillo’s data center presence has been growing, and with that growth comes a second, less-visible phase of activity: white space that eventually needs to be cleared. Whether a data hall is being retired ahead of a lease turnover, a colocation suite is being rebuilt for a new tenant, or a legacy facility is being repurposed for another use entirely, the racks, raised floor, containment and cabling inside that room don’t remove themselves. That’s the specific work we handle at USA Decom — clearing the white space itself, distinct from decommissioning an entire building or removing standalone mechanical and electrical systems.
This page focuses on what’s involved in clearing a data hall in the Amarillo market, the questions facility managers typically ask before hiring a contractor, and what our team needs to know to scope a project accurately.
What Does “White Space Decommissioning” Actually Cover?
White space decommissioning is narrower than a full data center decommissioning project. It’s focused on the data hall itself — the room where IT equipment lived and the infrastructure that supported it — rather than the building’s generators, chillers, or switchgear outside the hall.
A typical white space scope includes:
- Server and network racks/cabinets, whether populated, partially populated or already stripped of IT gear
- Raised access flooring, including panels, stringers and pedestals
- Overhead ladder rack, cable tray and cable basket
- Structured cabling — copper and fiber runs, patch panels and associated pathway
- Hot-aisle/cold-aisle containment systems, including doors, roof panels and curtain walls
- Power distribution units (PDUs), remote power panels (RPPs) and overhead busway
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- In-room CRAC or CRAH units serving the hall
- Fire-suppression components tied to the space, when included in scope
- Abandoned or orphaned infrastructure left behind from prior tenants or prior IT refreshes
The goal on nearly every project is the same: hand back a data hall that’s genuinely ready for its next use — whether that’s a full renovation, a new tenant buildout, or conversion to a different kind of commercial space.
Why Are Amarillo Facilities Clearing White Space?
The Amarillo area has attracted data center development in recent years, supported by regional power capacity and available industrial land in and around the metro. As newer facilities come online, older or smaller data halls in the area — including legacy colocation suites, enterprise server rooms, and edge deployments built around prior-generation IT loads — can become candidates for white space clearing as owners consolidate operations, upgrade infrastructure, or convert space to a different use.
Amarillo’s position along major interstate and rail corridors also makes it a practical base for regional logistics and industrial operations more broadly, which in turn makes it a reasonable location for staging equipment removal, coordinating trucking for salvaged materials, and moving crews and equipment efficiently across the metro and surrounding Panhandle communities.
We work with facility managers, IT directors, colocation operators, property managers and general contractors throughout Amarillo and nearby communities including Canyon, Bushland, Hereford, Borger, Pampa, Dumas and Clovis, New Mexico, whenever a data hall needs to be cleared for reuse, renovation or turnover.
Do You Need Full White Space Decommissioning or Just Equipment Removal?

This is one of the most common questions we get, and the answer depends on what happens to the room after the work is done.
Choose white space decommissioning when:
- The entire data hall is being vacated and the space itself needs to be turned over
- Raised floor, containment and cable infrastructure all need to come out, not just the racks
- The room is being repurposed for office space, warehouse use, or another tenant’s buildout
- A lease is ending and the landlord requires the space returned to a specified condition
Choose targeted equipment removal instead when:
- Only specific racks, PDUs or a subset of cabinets need to come out
- The raised floor and containment are staying in place for continued use
- IT refresh or consolidation is underway but the room remains an active data hall
If you’re not sure which category your project falls into, describing the end condition you need — an empty shell, a partially cleared hall, or something in between — helps us scope the right approach from the start.
What Happens to the Racks, Floor Tiles and Cabling We Remove?
Data halls accumulate a wide range of brand-name infrastructure over their operating life, and much of it has genuine recovery value if it’s removed carefully rather than demolished.
Cabinets and enclosures from manufacturers such as APC/Schneider Electric, Chatsworth Products (CPI), Rittal, Panduit, Vertiv, Great Lakes Case & Cabinet, Eaton and Legrand are common in halls of all sizes, and many are suitable for resale or reuse depending on condition, age and completeness. Raised access floor systems — including product families from Tate, ASM, Haworth and Kingspan, along with a range of legacy panel systems still found in older Amarillo-area facilities — can often be salvaged, resold or recycled depending on panel type and condition. Overhead cable tray, ladder rack and structured cabling from manufacturers like Chatsworth/CPI, Panduit, Legrand, Cablofil, Corning and CommScope typically carry commodity or reuse value as well, particularly copper cabling and intact tray sections.
Containment systems — hot-aisle and cold-aisle enclosures from APC/Schneider, Vertiv, Chatsworth, Subzero Engineering or Tate — are frequently reusable in another facility if disassembled without damaging panels, doors or framing. PDUs, RPPs and busway from Vertiv/Liebert, Eaton, APC/Schneider, PDI, Starline and Square D are also evaluated individually, since power distribution equipment often retains meaningful secondary-market value.
Not every component has resale value, and condition, age, completeness and current market demand all affect what’s recoverable. But identifying what can be resold, reused or recycled before demolition begins — rather than sending everything straight to a dumpster — can meaningfully offset the cost of the overall project.
How Is a White Space Clearing Project Actually Sequenced?
Every data hall is different, but most projects follow a similar general sequence:
1. Site walk and scope development. We review rack counts, floor plans, containment layout, cabling density and any hazardous or sensitive materials before finalizing scope.
2. Utility and power isolation coordination. Circuits feeding racks, PDUs and in-row cooling need to be confirmed de-energized and isolated before physical removal begins, typically coordinated with the facility’s electrical team or engineer of record.
3. Data-bearing device handling. Any servers, storage or networking equipment still on-site may require appropriate sanitization, destruction or chain-of-custody procedures as part of the overall project plan, coordinated with the customer’s IT and security requirements.
4. Rack and cabinet removal. Enclosures are unbolted, disconnected and removed, generally starting from the perimeter of the hall inward or in a sequence that matches an active shutdown schedule.
5. Overhead and containment teardown. Ladder rack, cable tray, containment panels and cabling pathway come down once the racks below are cleared.
6. Cabling removal. Copper and fiber runs are pulled, segregated by material type, and staged for recycling or disposal.
7. Raised floor demolition. Panels, stringers and pedestals are removed down to the structural slab, with attention to floor loading and any embedded conduit or grounding infrastructure.
8. PDU, RPP and busway removal. Power distribution equipment is de-energized, disconnected and removed, with usable units set aside for evaluation.
9. Final cleanup and turnover. The hall is cleared to slab (or to whatever end condition the customer specifies) and ready for inspection, renovation or handoff to the next tenant or use.
Similar projects we’ve handled have ranged from single suites of roughly 50 racks and a few thousand square feet up to full data halls of 500 or more racks and 50,000-plus square feet, and the sequencing above scales in either direction depending on room size and shutdown constraints.
What If the Data Hall Is Still Partially Live?
Many white space projects happen inside facilities that aren’t fully vacant. A colo suite may be losing one tenant while others remain operational nearby; a corporate data center may be migrating workloads to the cloud in phases rather than all at once. In these cases, sequencing has to account for:
- Which circuits, racks and containment sections are confirmed dead versus still live
- Physical separation or barriers between active and inactive zones during demolition
- Noise, dust and vibration limits that protect equipment still in service
- Coordination windows tied to maintenance periods or off-hours access
- Fire-suppression and life-safety systems that may need to remain functional for the active portion of the room
Facilities with mixed active/inactive status generally take longer to plan than a fully vacant hall, simply because more coordination is required before work can start.

What Should You Have Ready Before Requesting a Quote?
Projects move faster and quotes come back more accurately when we have a clear picture of the space up front. Useful information includes:
- Facility address and current operational status (fully vacant, partially active, or fully active)
- Approximate rack/cabinet count and hall square footage
- Whether raised floor, containment and overhead cable tray are included in scope
- Manufacturer information for racks, containment or PDUs if known
- Target completion date, lease-end deadline, or turnover requirement
- Site access conditions — loading dock availability, elevator or ramp access, ceiling heights
- Photos of the hall, if available
Practical Checklist for Planning a White Space Clearing Project
Before reaching out, it helps to walk the space (or review recent photos) and note the following:
- Total rack/cabinet count and general condition
- Raised floor type and approximate square footage
- Containment system type — hot-aisle, cold-aisle, or none
- Overhead cable tray and ladder rack extent
- Estimated cabling volume (copper vs. fiber)
- PDU, RPP and busway count and manufacturer, if known
- In-room CRAC/CRAH units included in scope
- Any data-bearing devices still on-site requiring sanitization or destruction
- Building access constraints — dock height, freight elevator, stairwell-only access
- Required completion date and any lease or landlord deadlines
Having this information ready doesn’t just speed up our review — it also helps you compare scope and pricing accurately if you’re evaluating more than one contractor.
Tell Us About Your Data Hall
If you’re planning to clear a data hall in Amarillo or anywhere in the surrounding Panhandle region, use the form below to tell our team about the facility — rack count, square footage, raised floor and containment details, current operational status, and your target timeline. Photos are helpful if you have them. We’ll use that information to put together a scope review for your specific project.