Central Texas sits along the I-35 corridor between Dallas-Fort Worth and Austin, and Waco has seen growing interest in data center and technical facility development in recent years, supported by available power infrastructure and industrial-zoned land throughout McLennan County. That development activity also means existing facilities in and around Waco are increasingly reaching a point where equipment needs to come out — whether because a legacy data hall is being refreshed with new infrastructure, a facility is downsizing after a workload migration, or a site is being repositioned for a different use entirely.
USA Decom performs targeted removal of data center infrastructure for facility owners, operators, colocation providers, enterprise IT teams and general contractors working in the Waco market. This is distinct from a full data center decommissioning or white space teardown — targeted equipment removal typically means pulling specific systems such as standby generators, UPS modules, precision cooling units, switchgear, PDUs and IT hardware while portions of the facility remain active, are being repurposed, or are moving toward a later full decommissioning phase.
Why Facilities Need Targeted Equipment Removal
Data center infrastructure has a finite operational life, and refresh cycles rarely wait for a convenient moment. A facility might need to remove aging UPS modules ahead of a lithium-ion battery conversion, pull legacy CRAC units to make room for higher-density cooling, or clear out a retired generator plant after a utility upgrade reduces the need for as much on-site standby capacity. In other cases, a tenant vacating a colocation suite needs racks, PDUs and cabling removed and the space returned to the landlord in an agreed condition, while the rest of the building continues normal operations around them.
Growth-driven markets like Waco add another common trigger: capacity expansion. When a facility brings new switchgear, generators or cooling plant online, the older equipment being replaced still has to come out — safely, on schedule, and without disrupting the systems that remain in service. That last point is often the real constraint. Removing a generator or UPS module from a facility that is still running production loads requires careful coordination so the work doesn’t touch circuits, cooling loops or fire suppression zones that support equipment staying in place.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Equipment Categories We Remove
Targeted removal projects typically involve one or more of the following systems, often in combination:
- Standby and backup generators, including CAT, Cummins, Kohler and Generac units ranging from smaller support gensets up to large multi-megawatt standby plants
- UPS systems and associated battery infrastructure, such as Eaton 9395/93PM units, Vertiv/Liebert EXL and eXM systems, and APC/Schneider Galaxy platforms, along with VRLA or lithium-ion battery cabinets
- Precision cooling equipment including Vertiv/Liebert, STULZ and Data Aire CRAC and CRAH units, along with associated condensers and refrigerant piping
- Electrical distribution equipment such as Square D/Schneider, Eaton/Cutler-Hammer, Siemens/ITE and ABB switchgear, along with ASCO and Russelectric transfer switches
- PDUs and RPPs from manufacturers including Vertiv/Liebert, PDI, Eaton/Powerware and APC/Schneider
- IT and network infrastructure, including servers, storage and networking equipment from Dell, HPE, Cisco, IBM, Lenovo, NetApp and similar manufacturers, along with the racks, rail kits and cable management supporting it
- Rack and infrastructure hardware from APC, Chatsworth/CPI, Panduit and Rittal, along with Tate and similar raised-floor systems where floor tiles or pedestals need to come out around removed equipment
Not every project touches all of these categories. A generator swap-out is a very different scope from clearing a retired UPS room or pulling IT assets from a decommissioned cage, and the planning approach shifts accordingly.
Planning the Scope Before Work Begins
Before any equipment moves, we work through the practical questions that determine how a removal project should be sequenced. What is currently energized, and what has already been de-energized or isolated by the facility’s electrical staff? Are batteries still connected, and if so, what is their condition and chemistry? Is refrigerant still charged in the cooling units being removed, and does that require licensed recovery before disassembly? Which loads, if any, remain critical during the project, and what separation is needed to keep the removal work from creating risk to production systems?
Lockout/tagout procedures are central to this planning. Every circuit, disconnect and isolation point associated with the equipment being removed needs to be verified and controlled before disconnection work starts, and that verification typically has to be coordinated directly with the facility’s own electrical and operations personnel rather than assumed from as-built drawings alone. On active or partially active sites, this coordination step often takes as much planning attention as the physical removal itself.
Battery handling deserves its own attention. VRLA batteries associated with legacy UPS systems require proper handling, packaging and transportation as regulated materials, and lithium-ion battery cabinets bring additional handling considerations related to state of charge and thermal risk during transport. Refrigerant-charged cooling equipment similarly requires recovery by appropriately certified personnel before the unit can be disassembled or moved, consistent with applicable federal refrigerant management requirements. Building these steps into the schedule up front avoids delays once crews are on site.

Rigging, Disassembly and Loadout
Once isolation and any hazardous-material handling steps are complete, the physical work shifts to disassembly, rigging and loadout. Generators and large UPS modules are heavy, often requiring forklifts, pallet jacks rated for the load, or overhead rigging depending on the equipment’s weight and the building’s access conditions. A multi-module UPS system or a containerized generator set may need to be broken down into smaller sub-assemblies to move through interior corridors, freight elevators or loading dock openings that weren’t necessarily designed around the equipment’s original footprint.
Cable management is frequently underestimated. IT rooms and electrical rooms alike tend to accumulate years of copper and fiber cabling, and removing racks or PDUs cleanly means tracing and disconnecting that cabling in a way that doesn’t disrupt adjacent equipment that is staying in place. On raised-floor spaces, this also means working carefully around floor tiles, understructure and any active cabling running beneath the equipment being pulled.
Floor loading is another practical constraint in facilities built on slab or raised-floor systems designed for specific point loads. Moving a generator or large switchgear lineup across a finished floor, or staging heavy equipment temporarily before loadout, requires understanding what the floor and any raised-floor pedestals were designed to carry, and planning dolly or rigging paths accordingly.
Recycling, Salvage and Asset Recovery
Retired data center equipment is rarely pure scrap. Generators, UPS modules, switchgear and IT hardware frequently retain resale or reuse value depending on manufacturer, model, age, condition, completeness and current demand in the secondary market. A Cummins or CAT generator in working condition, an Eaton 9395 or Liebert EXL UPS module with intact power electronics, or a batch of enterprise servers and networking gear from Dell, HPE or Cisco may be candidates for resale rather than immediate scrapping.
At the same time, transformers, copper wiring, aluminum busway, steel racking and structural components carry recoverable commodity value even when the equipment itself is beyond economical reuse. Identifying which path applies to which asset — resale, component recovery, or recycling — before demolition starts is what allows recoverable value to actually be captured instead of lost. We evaluate equipment condition and market relevance as part of scope development so that decisions about disposition are made deliberately rather than by default. Recovered value from resalable equipment or recyclable materials can offset a portion of the overall removal cost, though the extent of that offset depends on the specific equipment involved and current market conditions.
Working Around Active Operations
A meaningful share of targeted equipment removal work happens inside facilities that are only partially affected by the project. A colocation provider might be clearing one vacated suite while neighboring tenants continue normal operations. An enterprise data center might be pulling a legacy UPS lineup during a planned maintenance window while critical IT load rides through on a parallel system. In these situations, the removal plan has to account for fire suppression zones that shouldn’t be disturbed, building management and monitoring systems that need to stay intact, and physical separation between the work area and spaces that remain in service.
Communication with facility staff, building engineers and any other trades on site is a continuous part of this kind of project rather than a one-time kickoff conversation. Schedules often need to flex around the facility’s own maintenance windows, utility work, or operational constraints, and a removal plan that looks straightforward on paper can change once real-time conditions on site are factored in.

Project Spotlight
Recent work in this category has included coordinated removal of a legacy UPS lineup — including Vertiv/Liebert EXL modules and associated battery cabinets — from an active facility undergoing a lithium-ion conversion, where isolation and battery handling had to be sequenced around a live production environment. Other similar projects have involved pulling retired CRAC units and Square D switchgear from a facility being reconfigured for higher-density cooling, along with removal of racks, PDUs and IT hardware from a vacated colocation suite ahead of landlord turnover. On projects like these, our approach typically starts with a walk-through to confirm current electrical and mechanical conditions, followed by a sequenced plan that separates isolation and hazardous-material handling from the physical rigging and loadout work, with recyclable and resalable materials segregated throughout rather than commingled for disposal.
Regional Context for Central Texas Facilities
Waco’s data center and technical facility base sits alongside established manufacturing, logistics and distribution activity along the I-35 corridor, giving the market a mix of purpose-built technical facilities and converted industrial space. Facilities here range from newer builds designed around current infrastructure standards to older buildings retrofitted for data center or technical use over multiple ownership cycles, and the equipment inside reflects that range — anything from recently installed lithium-ion UPS systems to legacy VRLA-battery lineups still in service from an earlier build-out.
USA Decom provides data center equipment removal services in Waco and throughout the surrounding Central Texas region, including Temple, Killeen, Hillsboro, Marlin, Gatesville and communities along the I-35 corridor toward both Dallas-Fort Worth and Austin. Whether the project involves a single generator swap or a multi-system removal spanning electrical, mechanical and IT infrastructure, the same core planning principles apply: confirm current conditions, sequence isolation and hazardous-material handling correctly, protect systems staying in service, and manage disposition of removed equipment deliberately.
Tell Us About Your Project
If your Waco facility has equipment coming out — generators, UPS systems, precision cooling, switchgear, PDUs, racks or IT hardware — use the form below to tell our team about the facility, the equipment involved, current operational status and your target schedule. Photos of the equipment and site access conditions are especially helpful for an accurate initial assessment, along with any details on shutdown windows, lease or turnover deadlines, and whether portions of the facility need to remain in service during the work. That information lets our team put together a scope and approach specific to your project.