Tyler’s data center footprint is smaller than the corridors around Dallas-Fort Worth, roughly 100 miles to the west, but the equipment inside a Tyler-area facility is no less complex to remove. Whether the project involves a converted downtown property, a colocation site, or a private data hall supporting a hospital system, manufacturer, or logistics operation, pulling out generators, UPS modules, precision cooling units, switchgear and IT racks requires the same level of planning as a much larger facility.
USA Decom provides targeted data center equipment removal services in Tyler and across East Texas. This is different from a full decommissioning or white-space clearing project — it’s the focused, technical work of safely disconnecting, disassembling, rigging and hauling specific pieces of critical infrastructure while the rest of the facility may remain occupied, under construction, or in transition to a new use.
Why Equipment Removal Projects Come Up in Tyler
Several conditions can drive this type of project in the local market:
- A property is being repositioned or retrofitted for a new tenant or a different digital infrastructure use, and existing mechanical and electrical equipment needs to come out before renovation can proceed.
- A facility is upgrading UPS, generator or cooling capacity and the legacy equipment has to be removed to make room for new systems.
- A tenant is vacating a leased data hall and is contractually required to remove owned equipment before turnover.
- A company operating a smaller private data center — supporting healthcare records, manufacturing operations, or logistics systems relevant to the Tyler area — is consolidating IT infrastructure into a colocation provider or the cloud and no longer needs on-site generators, UPS and cooling equipment.
Tyler sits along regional fiber routes and near East Texas natural gas infrastructure, and some facilities in the area incorporate on-site generation, dedicated switchgear and independent cooling plants as part of their power strategy. That same infrastructure is exactly the type of equipment that eventually needs to be removed, replaced or relocated as facilities change hands or change purpose.
What Falls Under Equipment Removal (and What Doesn’t)
Data center equipment removal is a narrower scope than a full data center decommissioning project. It typically does not involve clearing an entire white space, tearing out raised flooring, or shutting down an entire building. Instead, it focuses on removing specific systems, such as:
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Standby and backup generators (CAT, Cummins, Kohler and Generac units in the kW ranges common to small and mid-sized data halls)
- UPS systems and associated battery cabinets, including Eaton 9395/93PM and Vertiv/Liebert EXL, eXM or APM units
- Precision cooling equipment such as Liebert, STULZ or Data Aire CRAC/CRAH units, along with associated refrigerant piping
- Electrical distribution gear — switchgear, breakers and transfer equipment from manufacturers such as Square D/Schneider, Eaton/Cutler-Hammer, Siemens/ITE, ABB, ASCO and Russelectric, plus Starline busway
- PDUs and RPPs from Vertiv/Liebert, PDI, Eaton/Powerware or APC/Schneider
- IT racks, cabinets and containment from APC, Chatsworth/CPI, Panduit or Rittal, along with raised-floor systems such as Tate
- Servers, storage and networking gear from Dell, HPE, Cisco, NetApp and similar manufacturers when IT equipment removal accompanies the infrastructure work
If the project scope grows to include the entire building shell, structural work, or wholesale clearing of a data hall, that moves into full decommissioning or white-space decommissioning territory. Many equipment removal projects, though, are exactly this kind of targeted work — a generator swap, a UPS replacement, or a partial infrastructure teardown ahead of a lease turnover.

Planning the Shutdown Before Anything Moves
Every equipment removal project starts with understanding what stays energized and what doesn’t. Before any disconnection work begins, our team works through:
- Identifying which circuits, panels and systems feed the equipment being removed
- Confirming whether adjacent systems, racks or tenants remain live during the project
- Establishing lockout/tagout (LOTO) procedures for each piece of equipment
- Coordinating with the facility’s electrical contractor or engineer of record on isolation points and permit-to-work requirements
- Verifying UPS and generator systems are fully de-energized, batteries are isolated, and stored energy has been discharged before disassembly begins
Battery handling deserves particular attention. UPS systems tied to VRLA or lithium-ion battery strings hold significant stored energy even after the UPS itself is shut down. Removing battery cabinets safely means confirming discharge, following proper disconnection sequencing, and segregating battery units for appropriate handling and recycling — lead-acid and lithium chemistries require different handling and cannot be commingled.
Rigging and Removal Logistics
Data center equipment is heavy, often awkwardly shaped, and frequently installed in locations that weren’t designed with removal in mind. A 500 kW-class generator, a multi-module UPS system, or a bank of CRAC units can each weigh several thousand pounds and may be positioned in mechanical yards, rooftop pads, basements or interior mechanical rooms with limited clearance.
Before removal, our team evaluates:
- Path of travel from the equipment’s current location to the loading area, including doorways, corridors, elevators and floor loading limits
- Whether equipment can be removed intact or needs to be disassembled into smaller sections
- Rigging points, lift capacity and whether a crane, forklift, or rigging skates will be used
- Refrigerant recovery requirements for CRAC and CRAH units before the coils and compressors can be moved
- Cable and conduit disconnection, including tracing circuits back to source panels to confirm complete de-energization
Buildings converted into data center use often present tighter access, lower ceiling heights, and less predictable floor construction than a purpose-built facility — a condition worth planning for whenever a project involves a repurposed commercial or industrial structure. Confirming floor loading and access constraints early avoids costly surprises once equipment is already partially disassembled.
Cabling, Freight and Loadout
Once equipment is disconnected, the practical work of getting it off-site begins. This includes:
- Removing and segregating copper wiring, control cabling, and fiber runs associated with the equipment being removed
- Palletizing or crating smaller components such as PDUs, battery modules and rack hardware for transport
- Coordinating freight for larger components — generator enclosures, UPS cabinets, and cooling units frequently require flatbed or specialized transport depending on size and weight
- Scheduling loadout around the facility’s operating hours, dock access, and any restrictions related to adjacent occupied space
For a Tyler project, loadout logistics typically route through Interstate 20, which runs through the market and connects toward Dallas-Fort Worth to the west and Shreveport to the east, which supports equipment transport to regional recyclers, secondary markets or a buyer’s facility.
Asset Recovery and Recycling Considerations
Not every piece of equipment coming out of a data center is scrap. Generators, UPS systems, transformers, precision cooling units and networking equipment often retain resale or reuse value depending on manufacturer, model, age, condition, and completeness. Before removal work begins, it’s worth identifying:
- Which equipment may have resale value in the secondary market versus which is better suited for recycling
- Whether components are complete (control boards, batteries, compressors, etc.) or missing key parts
- Manufacturer and model information that affects marketability — for example, a Vertiv Liebert EXL S1 UPS or an Eaton 9395 module in working condition typically draws more resale interest than an obsolete or heavily corroded unit
- Copper, aluminum and steel content in switchgear, busway, cabling and structural components, which carries recyclable commodity value even when equipment itself isn’t resalable
Recoverable value from resale or recycling can offset a portion of removal costs, though not every item will have significant market demand, and equipment condition ultimately determines what’s realistic. Identifying these opportunities before demolition-style removal begins is what keeps otherwise valuable equipment from being scrapped unnecessarily.
Working Around Occupied or Partially Active Facilities
Many equipment removal projects happen while portions of a building remain occupied — an adjacent office suite, a warehouse operation sharing the same building, or IT systems that need to stay online during the transition. This requires:
- Clear work-zone boundaries and communication with facility staff or other tenants
- Scheduling noisy or disruptive work (cutting, rigging, heavy equipment movement) during agreed windows
- Temporary power or cooling arrangements if adjacent systems depend on infrastructure being partially reconfigured
- Dust, debris and housekeeping control appropriate to a facility that isn’t being fully vacated
This kind of coordination often comes up where data center space is integrated into a mixed-use commercial building rather than a standalone purpose-built campus, which is a layout our team plans around regularly.
How We’ve Done It Before
Projects of this type often follow a similar arc: a facility operator needs a specific generator, UPS lineup, or bank of CRAC units removed while the rest of the building stays functional. On comparable work, our team has coordinated with an in-house electrical contractor to confirm isolation points, de-energized and discharged UPS battery strings before cabinet disassembly, rigged out generator enclosures through a loading dock with limited clearance, and staged recovered switchgear and copper for separate resale and scrap streams. The sequencing — isolate, disconnect, disassemble, rig, load, dispose or resell — stays consistent whether the job involves a single generator or a full lineup of UPS, cooling and electrical gear.

What to Gather Before Requesting a Quote
A useful first step is putting together a basic picture of the equipment and site conditions. Before reaching out, it helps to have:
- A list of the equipment to be removed (type, manufacturer, model, and approximate capacity if known)
- Photos of each system, including nameplates showing model and serial numbers
- The facility address and a description of access — loading docks, freight elevators, stairwells, or at-grade access
- Whether the equipment is currently energized, partially de-energized, or already shut down
- Any known electrical isolation points or single-line diagrams, if available
- The target removal timeline and any deadlines tied to lease turnover, construction schedules or new equipment installation
- Whether portions of the facility will remain occupied during the project
This information lets our team put together an accurate scope and identify any items with asset recovery potential before committing to a removal plan.
Serving Tyler and the Surrounding East Texas Region
USA Decom provides data center equipment removal services in Tyler and throughout the surrounding East Texas region, including Longview, Lufkin, Nacogdoches, Jacksonville, Kilgore and Marshall, as well as connections west toward the Dallas-Fort Worth data center corridor. Facilities in this market — whether supporting colocation, a private data hall, or a converted commercial building — will periodically need equipment replaced, upgraded or removed, and that work requires the same technical care whether it’s a single generator swap or a multi-system removal ahead of a facility repurposing.
Tell Us About Your Project
If you’re planning an equipment removal project at a data center, colocation facility, or private data hall in the Tyler area, use the form below to tell our team about the facility, the equipment involved and your target schedule. Include details on manufacturer and model where known, site access conditions, whether the space will remain partially occupied during the work, and any deadlines tied to construction or turnover. That information helps us scope the project accurately and identify what may be worth recovering before removal begins.