Temple has become a meaningful data center market in Central Texas, anchored by a large hyperscale campus in the area and additional facility development along the Interstate 35 corridor. Behind every one of these facilities sits a large inventory of mechanical and electrical equipment that eventually has to come out — whether because of a technology refresh, a change in tenant, a decommissioned pod, or a full facility retirement.
USA Decom provides data center equipment removal services in Temple and throughout the surrounding Central Texas market, focused specifically on the safe disconnection, extraction, and disposition of the generators, UPS systems, precision cooling units, switchgear, PDUs, racks, and IT hardware that make up a modern data center’s infrastructure. This is a different scope than a full facility decommissioning or a white-space clearing project — it’s targeted removal work built around specific systems, often while the rest of the facility remains operational or under separate control.
Why Data Center Equipment Removal Projects Come Up in Temple
Several conditions drive this type of project in a market like Temple. A facility may be replacing aging UPS modules or precision cooling units as part of a capacity upgrade. A colocation or enterprise tenant may be vacating a suite and leaving behind racks, PDUs, and cabling that belong to the outgoing occupant. A generator plant may be getting swapped out for larger units as IT load increases. In some cases, a facility that supported an earlier generation of computing equipment is being repositioned for a new use entirely, and the legacy electrical and mechanical infrastructure needs to come out before new systems go in.
Because much of Temple’s data center infrastructure is relatively new, equipment coming out of service in the near term is often still in reasonably good working condition — which is exactly the situation where asset recovery planning matters most. Pulling equipment out and sending it straight to scrap when it still has resale or reuse value is a missed opportunity that a properly planned removal project can often avoid.
What’s Typically Involved: Equipment We Remove
A targeted data center equipment removal scope can include some or all of the following systems:
- Standby and backup generators — CAT, Cummins, Kohler and Generac units ranging from smaller kW packages up to multi-megawatt paralleled plants, along with associated fuel systems, day tanks, and switchgear
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- UPS systems and battery infrastructure — modular and monolithic units such as Eaton 9395 and 93PM systems, Vertiv/Liebert EXL, eXM and APM platforms, and APC/Schneider Galaxy systems, along with VRLA or lithium-ion battery strings, cabinets, and racks
- Precision cooling equipment — Vertiv/Liebert, STULZ, Schneider/APC Uniflair, and Data Aire CRAC and CRAH units, including in-row and perimeter configurations
- Electrical distribution and switchgear — Square D/Schneider, Eaton/Cutler-Hammer, Siemens/ITE, GE/ABB switchgear, ASCO and Russelectric transfer switches, and Starline busway
- PDUs and RPPs — Vertiv/Liebert, PDI, Eaton/Powerware, and APC/Schneider power distribution units and remote power panels
- IT racks, cabinets and infrastructure — APC, Chatsworth/CPI, Panduit and Rittal enclosures, containment systems, and Tate or similar raised-floor systems
- Server, storage and network hardware — Dell, Dell EMC, HPE, Cisco, IBM, Lenovo, NetApp, Pure Storage, Supermicro, Arista and Juniper equipment, where the customer has determined the hardware is ready for removal
Not every project involves every category above. Scope is defined around the specific equipment the facility needs removed, not a generic checklist.

Shutdown, Isolation and Safe Disconnection Come First
Before any piece of equipment moves, it has to be safely isolated from the systems around it. For electrical gear, that means confirming lockout/tagout procedures, verifying de-energization, and coordinating with the facility’s electrical staff or engineer of record on which circuits, breakers, and transfer switches are involved. UPS systems require particular attention to stored energy in the battery strings — VRLA and lithium-ion batteries both need to be handled according to their specific discharge, disconnection, and transport requirements, and battery cabinets are often one of the heaviest and most hazard-sensitive components in the removal scope.
Generators bring their own isolation sequence: fuel systems need to be addressed, cooling systems drained, and any remaining diesel or coolant managed appropriately before the unit is disconnected from its pad and switchgear. Precision cooling units that use refrigerant require proper refrigerant recovery consistent with applicable federal requirements before the unit can be disassembled or removed, since refrigerant cannot simply be vented during teardown.
In an active or partially occupied data center — a real possibility in a market where newer facilities sit near existing operations — sequencing also has to account for what stays live. Removal crews need clear boundaries between the equipment being taken out and the systems still supporting production load, along with a communication plan with facility operations so that isolation work doesn’t create unintended risk to adjacent infrastructure.
Rigging, Extraction and Site Logistics
Data center equipment is heavy, often awkwardly shaped, and frequently located somewhere that isn’t easy to reach. A 1,000 kVA UPS cabinet, a bank of VRLA batteries, or a rooftop CRAH unit each present different rigging and access challenges. Interior equipment may need to move through raised floor cutouts, freight elevators, loading dock doors, or narrow equipment corridors that weren’t designed with removal in mind. Rooftop or pad-mounted generators and cooling equipment may require crane service, especially where structural clearances or building layout rule out a simple forklift extraction.
Before mobilizing, it’s worth documenting equipment dimensions, weights, and access routes, along with floor loading limits for raised floor or upper-level mechanical spaces. This information shapes the rigging plan, determines whether disassembly is required before a unit can be moved, and affects how many pieces of handling equipment and how much crew time the project will take.
Asset Recovery: Getting Value Out of Equipment Before It’s Scrapped
This is where a well-planned removal project can materially change the economics of the work. Equipment coming out of a data center isn’t always at the end of its useful life — it’s frequently being replaced because of a capacity change, a technology refresh, or a lease transition, not because the equipment itself has failed. That distinction matters when deciding what happens to it next.
Before any equipment is cut apart or sent to scrap, it’s worth evaluating:
- Manufacturer, model and capacity — a 500 kW CAT generator, a Liebert EXL UPS, or a bank of Chatsworth cabinets each have different secondary markets depending on age, configuration and demand
- Condition and completeness — units removed intact with documentation, control panels and accessories generally retain more value than equipment that’s been damaged during extraction
- Age and remaining service life — even legacy or discontinued models can have resale or parts value depending on the platform
- Quantity — a full room of matching PDUs, racks or UPS modules is often more attractive to a secondary buyer than a single mismatched unit
- Removal condition — equipment that’s been carefully de-energized, drained and rigged out tends to move through resale channels more easily than equipment torn out without regard to condition
Where reuse or resale isn’t practical, equipment still typically carries recoverable value in its underlying materials. Copper windings, aluminum housings, steel enclosures, and circuit board components can be segregated and directed to appropriate recycling and scrap channels rather than mixed waste. This kind of material segregation during teardown — rather than after — tends to produce better recovery outcomes and keeps more material out of landfill disposal.
We don’t promise that every piece of equipment will have resale value, and recoverable value won’t offset every dollar of a removal project. But identifying disposition options before demolition starts, rather than after, is usually what determines whether a project captures that value at all.
Cabling, IT Hardware and Data-Bearing Devices
Server, storage and networking equipment removal often runs alongside the electrical and mechanical scope, particularly during a tenant move-out or refresh. Structured cabling, patch panels, and containment systems typically need to be removed along with the racks and enclosures that housed them. Data-bearing devices — drives, appliances, and any hardware that stored information — may require appropriate sanitization, destruction, or chain-of-custody handling as part of the overall project plan, and this is worth clarifying early with whoever owns that equipment and its data policy.
Working Around an Active or Partially Occupied Facility
Not every removal project happens in an empty building. In a market with newer data center campuses developing alongside existing operations, equipment removal can take place in a facility that’s still partially staffed, still running production systems in another suite, or still under a live lease with adjacent tenants. That changes how the work gets scheduled and how the site gets managed — after-hours or weekend windows for the noisiest or most disruptive phases, coordinated shutdown windows for any shared electrical infrastructure, and clear physical separation between active work areas and areas still in service.
Recent Projects: Comparable Equipment Removal Work
On projects of this type, our team has handled the removal of paralleled UPS systems in the 500-1,000 kVA range along with their associated VRLA battery cabinets, coordinated refrigerant recovery ahead of CRAC unit teardown, and extracted multiple generator sets ranging from smaller standby units up to multi-hundred kW packages, including disconnection from switchgear and fuel system drawdown. On facility transitions involving IT infrastructure, work has included removal of full rows of server racks, cabinets and PDUs following data sanitization by the equipment owner, with usable enclosures and power distribution equipment set aside for evaluation rather than immediate scrapping. Each project is scoped around the specific equipment, access conditions and disposition goals involved rather than a standard template.

What to Have Ready Before Requesting a Quote
A useful starting point for scoping a data center equipment removal project in Temple includes:
- The facility type and current operational status (active, partially decommissioned, vacant)
- A list of equipment involved, including manufacturer, model, and approximate capacity where known
- Site access conditions — floor levels, elevator or dock access, ceiling heights, and any known rigging constraints
- Whether refrigerant, fuel, or battery systems are involved
- The target schedule, including any lease, shutdown, or turnover deadlines
- Whether photographs of the equipment and space are available
Providing this information up front helps our team put together an accurate scope and identify disposition options before a truck ever shows up on site.
Serving Temple and the Surrounding Central Texas Market
USA Decom provides data center equipment removal services in Temple and throughout the surrounding region, including Belton, Killeen, Harker Heights, Waco, Georgetown, and other communities along the Interstate 35 corridor. As data center development continues in this part of Central Texas, USA Decom is positioned to support equipment removal projects tied to technology refreshes, tenant turnover, and facility repositioning throughout the market.
Tell Us About Your Project
If you’re planning a generator swap, a UPS or cooling system replacement, a tenant move-out, or a broader equipment removal project at a Temple-area data center, use the form below to tell our team about the facility, the equipment involved, and your target schedule. Include as much detail as you can about manufacturer, model, capacity, quantity, and site access — along with photographs if you have them — so we can put together an accurate plan for your project.

