Data centers and enterprise server rooms throughout the Inland Empire eventually reach a point where specific systems need to come out, whether the rest of the facility keeps operating or not. A UPS reaching end of design life, a bank of CRAC units being replaced with newer cooling technology, or a generator being swapped ahead of a utility interconnection change all create the same practical problem: heavy, energized, sometimes hazardous equipment has to be safely disconnected, disassembled and hauled out of a working building without disrupting everything around it.
USA Decom provides data center equipment removal services in San Bernardino and across San Bernardino County, focused specifically on pulling out UPS systems, generators, precision cooling units, switchgear, PDUs/RPPs, racks and IT hardware in a way that protects the facility, the remaining infrastructure and the people working around it. This is a different scope than a full data center decommissioning or a white space teardown — it’s targeted equipment removal, usually driven by a refresh, a capacity change, a consolidation or a partial facility exit.
Why Equipment Removal Projects Come Up in This Market
San Bernardino sits within the Inland Empire, one of the largest logistics and distribution corridors in the country, positioned along key freight routes connecting inland warehousing to the ports of Los Angeles and Long Beach. That concentration of e-commerce, third-party logistics and distribution operations supports a range of enterprise server rooms, edge facilities, colocation space and corporate IT infrastructure tied to warehouse management systems, transportation management platforms and regional network operations.
The broader market includes colocation and carrier infrastructure serving network operators and enterprise tenants, alongside corporate and warehouse-based server rooms common to the region’s logistics operations. As these operators upgrade capacity, consolidate racks, replace aging UPS strings or retire older cooling plants, the removal of that equipment becomes its own project — separate from any lease-end obligations or full-building shutdown.
Common triggers we see behind equipment removal requests include:
- A UPS system or battery plant reaching the end of its service life and being replaced with a newer double-conversion or lithium-ion system
- Precision cooling units being swapped for higher-efficiency units or consolidated as IT load changes
- A generator being replaced due to emissions requirements, fuel-type changes, or a utility service upgrade
- Rack and cabinet consolidation following a server refresh or virtualization project
- Switchgear, PDU or RPP replacement tied to an electrical infrastructure upgrade
- Partial floor or suite exits where only a portion of the equipment inventory needs to leave
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Equipment We Commonly Remove
Data center equipment removal covers a wide range of electrical, mechanical and IT infrastructure. Depending on the facility, a project may involve:
UPS and battery systems — Modular and monolithic UPS units such as the Eaton 9395 family or Vertiv/Liebert EXL and EXM systems, along with their associated VRLA or lithium-ion battery cabinets. The Eaton 9395X UPS family — including the 9395XR, 9395XC and related Power Xpert 9395 configurations — is a common double-conversion platform found in mid-size to large data center environments, typically supplied in cabinet configurations weighing well over a thousand pounds per module. Removal requires proper disconnection sequencing, load transfer coordination and rigging equipment sized for the actual unit weight.
Precision cooling equipment — CRAC and CRAH units from manufacturers such as Vertiv/Liebert, STULZ and Data Aire, along with associated condensers, piping and refrigerant lines. Refrigerant recovery and proper handling of any remaining glycol or condensate lines are part of a responsible removal sequence.
Standby and backup generators — Diesel and natural gas units from CAT, Cummins, Kohler and Generac, ranging from smaller standby units supporting a server room up to larger paralleled sets supporting a full data hall. Fuel system draining, exhaust disconnection and pad or enclosure considerations all factor into the removal plan.
Electrical distribution equipment — Switchgear, automatic transfer switches and static transfer switches from manufacturers such as Square D/Schneider, Eaton/Cutler-Hammer, GE/ABB, Siemens/ITE, ASCO and Russelectric, along with PDUs and RPPs from Vertiv/Liebert, PDI, Eaton/Powerware and APC/Schneider.
Racks, cabinets and raised-floor infrastructure — Server racks and containment from APC, Chatsworth/CPI, Panduit and Rittal, along with Tate raised-floor systems where floor tiles or pedestals are being removed along with the equipment.
IT and network hardware — Servers, storage arrays and networking equipment from manufacturers such as Dell, Dell EMC, HPE, Cisco, IBM, Lenovo, NetApp, Pure Storage, Supermicro, Arista and Juniper, typically removed as part of the same project scope when a suite or floor is being cleared of active equipment.
Shutdown Sequencing and Electrical Isolation

Removing energized data center equipment safely starts with proper sequencing rather than simply disconnecting whatever is closest to the door. Before any physical removal begins, our team works through the electrical topology of the space with the customer’s facility or engineering staff to identify:
- Which circuits, breakers and disconnects feed the equipment being removed
- Whether load needs to transfer to a bypass source, alternate UPS module or utility feed before work begins
- Lockout/tagout points for each piece of equipment, verified and documented before hands-on work starts
- Whether adjacent racks, PDUs or cooling zones remain live and need physical separation or barriers during the work
- Coordination windows if the removal has to happen during a maintenance window or scheduled outage
This sequencing matters even more in a partially occupied facility, where equipment two feet away from the removal zone may still be carrying production load. A generator or UPS module coming out of an active data hall requires a different level of coordination than the same removal in a facility that has already been fully powered down.
Battery Handling and Hazardous Material Considerations
UPS battery removal deserves its own attention because of the chemical and electrical hazards involved. Stationary battery strings supporting UPS systems are frequently valve-regulated lead-acid (VRLA) batteries. OSHA’s electrical safety standards address battery rooms and charging areas, including ventilation, personal protective equipment and spill response, and these considerations inform how battery removal work is planned and sequenced. A sound removal plan typically includes:
- Verifying battery strings are de-energized and isolated before disconnection
- Using appropriate PPE for acid exposure, including face shields, aprons and gloves where lead-acid batteries are involved
- Staging spill containment and neutralization materials in case a cell is damaged during handling
- Packaging and labeling batteries appropriately for transport toward recycling, since spent lead-acid batteries are generally subject to transport and handling requirements even when exempt from certain hazardous waste rules
- Handling lithium-ion battery cabinets according to their own transport and thermal-safety requirements, which differ from lead-acid handling procedures
Skipping any of these steps creates real exposure — both physical risk to the removal crew and liability exposure for the facility. A removal plan should specify how batteries will be isolated, handled and transported before the first cabinet is opened.
Rigging, Access and Equipment Movement
Data center equipment is heavy, dense and often located in spaces that were never designed with removal logistics in mind. A monolithic UPS cabinet, a generator skid, or a large CRAC unit can weigh from several hundred to several thousand pounds, and getting it out of a raised-floor data hall, a second-floor mechanical room or a tight electrical closet takes planning around:
- Floor loading limits, particularly on raised access flooring rated for distributed IT loads rather than concentrated rigging loads
- Door widths, corridor turns, elevator capacity and any freight elevator weight or dimension restrictions
- Whether equipment needs to be partially disassembled on-site to fit through existing access paths
- Use of pallet jacks, cranes, skates or gantry systems depending on the unit and the path out of the building
- Protecting existing raised floor, cable pathways and adjacent operating equipment during the move
For rooftop-mounted condensers or cooling equipment, additional coordination is needed around crane placement, roof access and load path, particularly in warehouse-adjacent buildings common throughout the San Bernardino industrial corridor where roof structures and dock areas may limit staging options.
Loadout, Transportation and Recycling

Once equipment is disconnected and staged, it has to move off-site. Depending on condition and market demand, individual units may be routed toward resale, reuse in a secondary facility, or recycling for recoverable metals and components. Copper windings, aluminum housings, steel enclosures and circuit boards all carry different recovery value, and functioning equipment — a UPS module still under useful service life, a generator with reasonable running hours, or IT hardware still supported by its manufacturer — may have resale value that a straight scrap disposition would not capture.
Our approach is to sort equipment for its most appropriate disposition rather than treating every removed unit the same way. That can mean:
- Identifying UPS modules, generators or cooling units suitable for resale or reuse
- Segregating batteries, refrigerants and other regulated materials for proper handling
- Directing scrap metal, cabling and non-recoverable components to appropriate recycling streams
- Coordinating freight for larger units that require flatbed or specialized transport
Recoverable value from removed equipment can help offset a portion of the overall project cost, though the amount varies significantly by equipment age, condition, completeness and current secondary-market demand.
Working in Active and Constrained Facilities
Most equipment removal projects in this category happen inside buildings that are still operating — a colocation suite serving other tenants, a corporate data center supporting live production systems, or a warehouse facility with an on-site server room supporting daily logistics operations. That reality shapes the entire project approach:
- Work zones are physically separated from occupied or live areas using barriers, signage and controlled access
- Noise, dust and vibration from rigging or disassembly are managed to avoid affecting adjacent operations
- Deliveries, staging and loadout are scheduled around the facility’s own truck traffic and dock availability, which matters in an Inland Empire market where dock scheduling can be tight
- Communication with facility staff, IT teams and security happens continuously throughout the project rather than only at the start and end
Given the density of distribution and logistics operations around San Bernardino, many of these facilities operate on tight schedules with limited tolerance for disruption. Sequencing removal work around existing shift patterns and truck court activity is often as important as the technical work itself.
Real-World Project Examples
Projects in this category often involve a defined equipment list rather than an entire facility. On similar projects, our team may be asked to remove a paralleled set of 500 kW to 1 MW diesel generators being replaced ahead of a utility interconnection change, a modular UPS system in the 300–750 kVA range along with its associated battery cabinets, and a row of CRAC units being swapped for updated cooling technology — all within a facility that continues operating throughout the work. Sequencing typically starts with the least disruptive systems and builds toward the equipment