A data center rarely goes offline all at once. More often, a facility in Riverside is modernizing its power chain, consolidating racks after a lease renewal, replacing an aging UPS fleet, or preparing a suite for turnover to a landlord or new tenant. In each of these situations, the equipment inside the facility has to come out before the next phase of the project can begin, and that work involves far more than unbolting cabinets and hauling them to a dumpster. Generators, UPS systems, precision cooling units, switchgear, PDUs, racks and IT equipment are interconnected, energized, and in many cases still supporting live load right up until the moment they’re scheduled for removal.
USA Decom performs targeted data center equipment removal for facility operators, colocation providers, enterprise IT teams, general contractors and property owners throughout Riverside and the surrounding Inland Empire. This is different from a full data center decommissioning project or a white space teardown. Equipment removal projects are usually narrower in scope: a specific generator plant being replaced, a UPS fleet being upgraded, a bank of CRAC units being retired, or a room full of racks, PDUs and network gear being cleared out ahead of new build-out. The work still requires the same discipline around shutdown sequencing, disconnection, rigging and disposition, just applied to a defined set of systems rather than an entire facility.
Why Equipment Removal Projects Come Up in Riverside
Riverside sits at the center of the Inland Empire, one of the largest logistics and distribution markets in the country. Large warehouse, manufacturing and distribution operations throughout the region rely on server rooms, network closets and small-to-mid-size data centers to run warehouse management systems, transportation platforms and inventory control. As these operations expand, consolidate or upgrade their facilities, the equipment supporting that infrastructure often needs to be replaced, relocated or removed entirely.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Some of the most common triggers we see for equipment removal projects include a UPS fleet reaching end of support life and being swapped for new modules, a generator plant being upsized or replaced after a utility service change, a cooling system retrofit that requires pulling out older CRAC or CRAH units before new precision cooling goes in, and IT refresh cycles that leave racks of retired servers, storage arrays and network switches that need to be cleared before new hardware arrives. Lease turnovers and sublease arrangements are another driver, particularly when a tenant is required to return a data hall or equipment room to a specified condition before vacating.
Scoping the Project Before Anything Moves
Every removal project starts with understanding exactly what is in the room, what is still energized, and what has to happen before physical removal can begin. Our team typically works from as-built drawings, single-line diagrams, and a facility walkthrough to identify which systems are in scope, which breakers and disconnects control them, and where the interconnections lie between generators, UPS modules, switchgear, PDUs and downstream IT load. This is especially important in a live or partially live facility, where equipment scheduled for removal may share bus work, cooling loops or monitoring points with systems that need to stay in service.
For UPS removal specifically, the scope has to account for both the UPS modules themselves and the battery strings supporting them. A double-conversion system such as an Eaton Power Xpert 9395 UPS, available in capacity ranges commonly used for data centers, server farms, financial services and telecommunications applications, may be paired with large VRLA or lithium-ion battery cabinets that require their own disconnection, discharge verification and handling procedures before they can be moved. Comparable removals involving Vertiv/Liebert EXL or eXM systems, APC/Schneider Galaxy units, or older MGE and Toshiba UPS platforms follow the same basic logic: isolate the module from utility and load, verify stored energy has been addressed, disconnect battery strings, and stage the equipment for rigging.
Shutdown Sequencing and Lockout/Tagout

Data center equipment removal depends on a shutdown sequence that protects both personnel and any systems remaining in operation. Before any disconnection begins, our team works with the facility’s electrical staff or engineer of record to confirm breaker positions, apply lockout/tagout on the circuits being de-energized, and verify zero energy state using appropriate test equipment. This step matters more in a data center environment than in most industrial settings because of the density of interconnected gear: a generator feeding an automatic transfer switch, a UPS feeding downstream PDUs, and PDUs feeding rack-level power strips can all be part of a single electrical path that has to be de-energized in the correct order.
Battery handling deserves particular attention. VRLA and lithium-ion battery strings store significant energy even when the UPS itself has been shut down, and they need to be discharged, disconnected and packaged according to their chemistry before transport. Refrigerant-based cooling equipment, including CRAC and CRAH units from manufacturers such as Vertiv/Liebert, STULZ, Data Aire and Schneider/APC Uniflair, may require refrigerant recovery consistent with applicable federal requirements before the unit can be dismantled and moved, since venting refrigerant to the atmosphere during removal is not a permitted disposal method.
Rigging, Disassembly and Equipment Movement
Once equipment has been isolated and de-energized, the physical removal begins. Generators in the 500 kW to 2 MW range, whether CAT, Cummins, Kohler or similar diesel or natural gas units, typically require a crane or heavy forklift, engineered rigging points, and a clear path from the equipment yard or generator room to the loading area. Indoor UPS modules and switchgear lineups, including Square D/Schneider, Eaton/Cutler-Hammer, Siemens/ITE and GE/ABB gear, are often broken down into sections for movement through interior corridors, freight elevators or loading docks that were never designed to accommodate equipment of this size and weight.
Precision cooling units present their own access challenges, particularly rooftop or mezzanine-mounted CRAC and CRAH systems that require crane picks or rigging through a roof opening. PDUs, RPPs and busway systems from manufacturers such as Vertiv/Liebert, PDI, Eaton/Powerware and APC/Schneider are generally lighter individually but numerous, and disconnecting the branch circuit wiring and busway taps correctly is as important as the physical removal itself. Rack-level infrastructure, including cabinets from APC, Chatsworth/CPI, Panduit and Rittal, along with Tate or similar raised-floor systems, typically comes out toward the end of the sequence once the overhead cable trays, structured cabling and containment have been cleared.
Handling IT Equipment and Data-Bearing Devices
Server, storage and networking equipment removal is usually the most visible part of an equipment removal project, even though it’s often lighter and more straightforward to physically move than power and cooling infrastructure. Racks of retired hardware from manufacturers such as Dell, Dell EMC, HPE, Cisco, IBM, Lenovo, NetApp, Pure Storage, Supermicro, Arista and Juniper need to be inventoried, disconnected from power and network cabling, and staged for removal or resale evaluation. Data-bearing devices, including drives, storage arrays and any equipment that may retain client information, may require appropriate sanitization, destruction or chain-of-custody procedures as part of the overall project plan, and this is typically coordinated in advance with the facility’s IT and security stakeholders.
Transportation, Freight and Loadout Logistics
Riverside’s position within the Inland Empire’s freight network is an advantage for equipment removal logistics. The market’s proximity to major rail intermodal facilities, the Ports of Los Angeles and Long Beach, and interstate corridors including I-215 and SR-91 makes it practical to stage trucks, schedule freight carriers and move heavy equipment out of the region efficiently. Loadout planning has to account for dock height, floor loading limits inside the building, elevator or ramp capacity, and whether equipment needs to be broken down further before it can be loaded onto a flatbed or box truck. For facilities without a suitable loading dock, this often means routing equipment through a lobby, stairwell or exterior wall opening, which requires careful protection of finished surfaces and coordination with building management.
Asset Recovery and Equipment Disposition
Not every piece of equipment coming out of a data center is scrap. Generators, UPS modules, precision cooling units, switchgear, PDUs, racks and IT hardware in usable condition can often be evaluated for resale or reuse rather than automatic disposal, depending on age, condition, completeness and current demand in the secondary market. A generator plant being replaced due to a capacity upgrade, for example, may still have significant service life left, and switchgear or UPS modules retired during a modernization project are sometimes still attractive to buyers supporting smaller facilities or backup applications. Material that doesn’t have resale value, including copper wiring, aluminum busway, structural steel and other recoverable commodities, is typically segregated for recycling. Recoverable equipment and material value can help offset a portion of the overall removal cost, though the actual recoverable value depends heavily on the specific equipment, its condition and current market conditions.
Coordinating With Facility Stakeholders

Equipment removal projects rarely happen in isolation. They usually run alongside new equipment installation, electrical contractors, mechanical contractors, general contractors managing a broader renovation, and in some cases a landlord or property manager with turnover requirements to meet. Clear communication about the removal schedule, work zones, and any temporary outages needed to complete disconnections helps keep the project moving without disrupting operations that need to stay live in adjacent parts of the building. On projects involving colocation space or shared facilities, this coordination becomes even more important, since work in one suite can affect neighboring tenants if not carefully sequenced.
Recent Projects
Projects of this type that our team has handled typically involve a defined scope, such as removing an aging UPS fleet in the 300 to 750 kVA range along with associated battery cabinets, clearing a bank of CRAC units ahead of a cooling system retrofit, or removing a generator and switchgear lineup being replaced during a power capacity upgrade. On similar projects, our team works through the electrical isolation, battery discharge and refrigerant recovery steps first, then sequences the rigging and removal to keep the facility’s remaining systems in service throughout the work. Racks and IT hardware are usually the last elements removed, once power and cooling infrastructure have been cleared and the space is ready for its next use.
Serving Riverside and the Inland Empire
USA Decom provides data center equipment removal services throughout Riverside and nearby communities including Moreno Valley, Corona, San Bernardino, Ontario, Fontana and the broader Inland Empire logistics corridor. Whether the project involves a single generator swap, a full UPS and battery replacement, or clearing an entire equipment room ahead of a lease turnover, our team can evaluate the scope and put together a removal plan suited to the facility’s operating conditions.
Tell Us About Your Project
If you have equipment coming out of a data center, server room or network facility in Riverside, use the form below to tell our team about the project. Useful details include the type of equipment involved (generators, UPS and batteries, precision cooling, switchgear, PDUs, racks or IT hardware), approximate quantities and capacities, the facility’s operational status, site access conditions, your target schedule, and any photographs you’re able to share. That information helps us put together an accurate plan for shutdown, removal, transportation and disposition, and identify any equipment that may be worth evaluating for resale or asset recovery.