If your organization operates a data center, colocation suite, corporate server room or hospitality IT closet in the Coachella Valley, sooner or later you’ll need to take equipment out of service. A generator reaches the end of its useful life. A UPS system is replaced with newer lithium-ion technology. A CRAC unit is swapped for a more efficient model. IT racks are consolidated after a cloud migration. In every one of these situations, someone has to safely disconnect, remove, transport and dispose of or recover the equipment that’s coming out.
That’s the work USA Decom focuses on: targeted removal of the generators, UPS systems, precision cooling units, switchgear, PDUs, racks and IT hardware that make up a data center’s electrical and mechanical infrastructure. This is different from decommissioning an entire building or clearing a white space floor from top to bottom. It’s equipment-specific work driven by a refresh, a partial shutdown, a lease change or an infrastructure upgrade, and it requires its own planning around power isolation, rigging, battery handling and asset disposition.
Why Equipment Removal Projects Come Up in the Palm Springs Market
The Coachella Valley’s data infrastructure needs are shaped by a mix of hospitality, healthcare, tribal gaming, retail, municipal and small enterprise operations rather than by a concentration of hyperscale campuses. Resort properties, casino operations and regional healthcare systems throughout Palm Springs, Rancho Mirage, Palm Desert and the surrounding valley typically run their own server rooms, network closets or small colocation footprints to support reservations, point-of-sale, patient records and building systems.
The region does not have the concentration of large ground-up data center campuses found in nearby Inland Empire and greater Los Angeles submarkets, and local land use in the Coachella Valley has generally centered on existing commercial and hospitality development rather than new large-scale data center construction. For facility managers and IT directors, that environment often translates into refresh projects: swapping out an aging UPS fleet, retiring an underused generator, or removing legacy cooling and rack infrastructure that no longer matches current load requirements.
Whatever is driving the project on your end, the practical challenge is the same. Equipment has to come out of an occupied or partially occupied facility without disrupting adjacent operations, and it has to be handled correctly from an electrical, mechanical and environmental standpoint.
What We Remove
USA Decom performs targeted removal of the electrical and mechanical systems that support data center and server room operations, including:
- Standby and backup generators — diesel and natural gas units from manufacturers such as CAT, Cummins, Kohler and Generac, typically ranging from small standby units supporting a single server room up to larger paralleled systems supporting a full facility
- UPS systems and battery plants — double-conversion units such as the Eaton 9395/93PM family and Vertiv/Liebert EXL, eXM and APM series, along with APC/Schneider Galaxy, MGE, Mitsubishi and Toshiba systems, plus the VRLA or lithium-ion battery cabinets that support them
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Precision cooling equipment — CRAC and CRAH units from Vertiv/Liebert, STULZ, Schneider/APC Uniflair and Data Aire, including associated condensers and refrigerant piping
- Electrical distribution equipment — switchgear, ATS/STS gear and breakers from Square D/Schneider, Eaton/Cutler-Hammer/Westinghouse, GE/ABB and Siemens/ITE, along with ASCO and Russelectric transfer switches and Starline busway
- PDUs and RPPs — floor-mounted and overhead units from Vertiv/Liebert, PDI, Eaton/Powerware and APC/Schneider
- Server racks and support infrastructure — cabinets and containment from APC, Chatsworth/CPI, Panduit and Rittal, along with raised-floor systems such as Tate
- IT hardware — servers, storage and networking equipment from manufacturers including Dell, Dell EMC, HPE, Cisco, IBM, Lenovo, NetApp, Pure Storage, Supermicro, Arista and Juniper
Not every project involves this full list. Most facility teams are dealing with one or two categories of equipment at a time — a generator replacement, a UPS refresh, a batch of end-of-life racks after a virtualization project. We scope the work around the equipment you actually have, not a generic checklist.

How a Typical Removal Project Comes Together
Scope and site walk. Before anything moves, we need to understand what’s being removed, what stays energized, and how the space is currently used. This includes documenting equipment nameplate data, existing electrical connections, mechanical interconnects (refrigerant lines, exhaust, fuel piping) and physical access from the equipment room to the loading area.
Isolation and lockout/tagout. Equipment scheduled for removal has to be properly de-energized and isolated using lockout/tagout procedures before disconnection begins. On projects where adjacent systems remain live — a common condition in a Palm Springs hospitality property or hospital annex that’s replacing part of its infrastructure while the rest of the building keeps running — this coordination is one of the more important parts of the plan. We work with facility electricians, engineers or the customer’s designated personnel to confirm circuits are locked out and verified dead before disconnection.
Disconnection. Electrical conductors, control wiring, network and fiber cabling, refrigerant lines and fuel connections are disconnected in the sequence appropriate to the equipment and the site. Battery cabinets require particular attention — VRLA and lithium-ion battery strings need to be de-energized, disconnected and handled according to applicable transportation and disposal requirements before the cabinets themselves are removed.
Rigging and extraction. Data center equipment is often heavy, awkwardly shaped or located in tight mechanical rooms. UPS modules and battery cabinets can weigh several thousand pounds; a mid-size generator set easily exceeds that. Getting equipment out frequently means routing through raised floor cutouts, doorways sized for a different era of equipment, freight elevators or roof hatches for rooftop CRAH and condenser units. We plan rigging, floor loading and equipment paths before removal starts, not as an afterthought once equipment is already disconnected.
Loading and transportation. Once equipment is free and staged, it’s loaded for transport to a recycling facility, a resale buyer or an appropriate disposal channel depending on condition and market demand.
Recycling and asset recovery. Copper, aluminum, steel and electronic scrap streams are separated for recycling. Equipment that still has useful service life — a generator with reasonable hours, a UPS module in working condition, functional racks or usable IT hardware — may have resale value in the secondary market. Recoverable value depends on manufacturer, model, age, condition, completeness and current market demand, and it can help offset a portion of removal costs even when it isn’t guaranteed for every item.
Site restoration. After equipment is out, the space is typically cleaned and left in the condition specified for the project — whether that’s a bare mechanical room ready for new equipment or a space being returned to the landlord.
Battery Handling and Refrigerant Considerations
Two categories of data center equipment carry specific handling requirements that are worth planning for early.
UPS batteries — whether VRLA/sealed lead-acid or lithium-ion — are regulated materials. Lead-acid batteries are generally managed as universal waste or recycled through battery recyclers, and applicable EPA and state hazardous-waste requirements govern how spent batteries are stored, labeled and transported. Lithium-ion battery cabinets have their own handling and shipping considerations related to thermal and fire risk during removal and transport. Either way, batteries should be identified, counted and planned for as a distinct line item in the project scope rather than treated as an afterthought once the UPS cabinets are already out.
Precision cooling equipment — CRAC and CRAH units, and any associated condensers — typically contains refrigerant that must be recovered and managed in accordance with applicable federal and state refrigerant handling requirements before the unit is disconnected and removed. This work is usually performed by a qualified mechanical contractor as part of the overall removal sequence, and it needs to be built into the schedule before rigging begins.
Working Around an Occupied or Partially Operating Facility
Very few equipment removal projects happen in an empty building. Hotels, resorts and casino properties throughout the Coachella Valley run around the clock, hospital and healthcare facilities can’t tolerate unplanned outages, and even a corporate office server room removal usually has to happen without disrupting the rest of the building’s operations.
That reality drives most of the scheduling decisions on a project like this:
- Work is often sequenced during off-peak hours, overnight windows or scheduled maintenance periods
- Temporary power or cooling may need to stay in place for systems that aren’t part of the removal scope
- Noise, dust and equipment movement through common areas or guest-facing spaces need to be planned and, where necessary, screened or scheduled around property operations
- Coordination with property engineering, IT staff, security and, in gaming or healthcare environments, compliance or facilities personnel is typically part of the plan

Nearby Areas We Serve
USA Decom provides data center and server room equipment removal services throughout Palm Springs and the surrounding Coachella Valley, including:
- Cathedral City
- Rancho Mirage
- Palm Desert
- Indian Wells
- La Quinta
- Indio
- Desert Hot Springs
- Coachella
We also work with facilities further out in the Inland Empire and Southern California corridor when a project calls for it.
What to Gather Before You Reach Out
A clear picture of the equipment and site conditions helps us give you a realistic scope and schedule faster. Before requesting a quote, it’s useful to have on hand:
- The type, manufacturer and model of equipment being removed (generator, UPS, CRAC unit, switchgear, racks, IT hardware, etc.)
- Approximate capacity or size — kW/kVA for generators and UPS, tonnage for cooling equipment, quantity of racks or cabinets
- Age and general condition, including whether the equipment is still operational
- Battery type and configuration if a UPS or battery plant is part of the scope
- Site access details — floor location, doorway and elevator dimensions, loading dock availability, stair or ramp access
- Whether adjacent systems need to stay energized during the work
- Target removal timeline, including any lease, shutdown or upgrade deadlines
- Photographs of the equipment and the access path, if available
Tell Us About Your Project
Whether you’re replacing an aging UPS fleet, retiring a generator, upgrading precision cooling, or clearing out racks and IT hardware after a consolidation, use the form below to tell our team about the equipment, the facility and your target schedule. The more detail you can share about equipment type, quantity, condition and site access, the faster we can put together a realistic plan for your Palm Springs project.