If a facility upgrade, colocation move, or hardware refresh has left your Inland Empire data center with a room full of equipment that needs to come out safely and on schedule, you’re dealing with a project that’s more complicated than it looks from the outside. Pulling a UPS system, a bank of CRAC units, or a row of switchgear out of a live or semi-live facility involves electrical isolation, rigging, battery handling, and coordination with whatever operations are still running around the work area. USA Decom performs targeted equipment removal inside data centers throughout the Inland Empire, working with facility teams, IT staff, general contractors, and property owners to pull specific systems out cleanly, safely, and with appropriate attention to asset recovery.
This page walks through the questions we hear most often from facility managers and operations teams planning this kind of project, along with the local factors that tend to shape scope and scheduling in this market.
What Does “Equipment Removal” Actually Cover in a Data Center?
Data center equipment removal is narrower than a full decommissioning or white-space teardown. It typically means targeted extraction of specific systems while the rest of the facility, or at least the building shell, remains in place or in use. Depending on the project, that can include:
- Standby and backup power generators (CAT, Cummins, Kohler and Generac units in varying kW ratings)
- UPS systems and associated battery cabinets, including modular and monolithic units such as Eaton 9395/93PM and Vertiv/Liebert EXL, eXM and APM platforms
- Precision cooling equipment, including Liebert, STULZ, Data Aire and Schneider/APC Uniflair CRAC and CRAH units
- Electrical distribution gear such as switchgear, ATS/transfer switches, PDUs and RPPs from manufacturers including Square D/Schneider, Eaton/Cutler-Hammer, Siemens/ITE, ASCO, Russelectric and GE/ABB
- IT racks, cabinets, and hardware from Dell, HPE, Cisco, IBM, Lenovo, NetApp and similar OEMs, along with rack and containment infrastructure from APC, Chatsworth/CPI, Panduit and Rittal
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
A project might involve one category, like pulling out an aging UPS plant and its battery strings ahead of a lithium-ion upgrade, or several categories at once when a tenant is vacating a suite and needs everything they installed removed before turnover. We scope each project around the specific systems coming out rather than treating every removal like a full facility teardown.
Why Are Inland Empire Facilities Requesting This Work?
The Inland Empire’s role as one of the country’s largest logistics and distribution hubs has pulled a substantial amount of supporting technology infrastructure into the region along with it. Warehousing, fulfillment, and manufacturing operations across Ontario, Riverside, San Bernardino, Fontana, Rancho Cucamonga, Moreno Valley and the surrounding corridor rely on on-site server rooms, network closets, and in some cases dedicated data center space to run inventory systems, automation, and building operations. As those operations upgrade infrastructure, consolidate locations, or move workloads to colocation and cloud providers, the equipment supporting the old setup still has to come out of the building.
This type of equipment removal project is often driven by factors such as:
- Lease turnover requirements. Commercial and industrial leases in the Inland Empire often require tenants to return space to a defined condition, which can mean removing IT racks, cooling equipment, and electrical infrastructure that was installed during the tenancy.
- Power and cooling upgrades. Older UPS and CRAC equipment nearing end of service life is frequently replaced rather than repaired, and the outgoing units need to be extracted, often through the same limited-access paths used to bring in the new equipment.
- Consolidation into regional or national data center campuses. As companies shift workloads to larger facilities, satellite server rooms and smaller data center suites throughout the region need to be cleared out.
Because the Inland Empire covers a wide geographic footprint, from the western Ontario/Rancho Cucamonga corridor near Ontario International Airport out through Redlands and the San Bernardino Valley toward the Coachella Valley, we plan logistics around each site’s specific location, road access, and freight requirements rather than assuming one regional approach fits every project.
How Do You Handle Power Shutdown Without Disrupting Operations?

This is usually the first question we get from facility managers, and it’s a fair one. If any part of the building is still operating, sequencing matters more than almost anything else on the project.
Before any equipment moves, we work through:
- Confirming what stays energized. Identifying which circuits, panels, and equipment must remain live throughout the project, and which can be fully de-energized.
- Lockout/tagout (LOTO) procedures. Applying appropriate LOTO on the specific breakers, disconnects, and equipment involved in the removal, coordinated with facility electrical staff or the building’s electrical contractor of record.
- UPS and battery isolation. UPS systems store energy even after input power is removed, and battery strings (VRLA, wet-cell, or lithium-ion) require their own isolation and handling steps before disconnection and extraction.
- Load transfer planning. On projects where a UPS or generator is being replaced rather than eliminated, confirming how critical loads transfer to the new source or to a temporary source during the changeover window.
For facilities that can’t tolerate a full shutdown, this often means scheduling the disconnection and removal work in phases tied to a maintenance window, or working section by section so the rest of the space keeps running normally.
What Happens to Batteries, Refrigerant, and Other Regulated Materials?
UPS battery strings and CRAC/CRAH refrigerant charges are two of the most common items that require specific handling during equipment removal, and they’re worth planning for in advance.
Batteries. VRLA and wet-cell battery cabinets are heavy, contain corrosive electrolyte, and require careful disconnection before physical removal. Lithium-ion UPS battery systems, increasingly common in newer Eaton and Vertiv installations, bring their own handling and transportation considerations. In either case, batteries are typically disconnected, packaged, and directed to appropriate recycling or disposal channels rather than treated as general scrap.
Refrigerant. Precision cooling units from manufacturers like Liebert, STULZ and Data Aire operate on refrigerant circuits that may require recovery, depending on the refrigerant type and applicable federal and state requirements. Refrigerant recovery ahead of disconnection is standard practice on CRAC and CRAH removal, consistent with EPA guidance under the Clean Air Act’s refrigerant management program.
Other materials. Transformers manufactured before the mid-1980s may contain PCB-impacted dielectric fluid, and older switchgear or breakers can contain components requiring specific handling. Confirming what’s actually present in a given piece of equipment, rather than assuming, is part of how we scope removals that involve legacy gear.
What Does the Physical Removal and Rigging Process Look Like?
Once equipment is electrically isolated, the physical extraction work depends heavily on the equipment’s size, weight, and the building’s access conditions.
A typical sequence includes:
1. Disconnecting conduit, cabling, and busway connections at the equipment
2. Detaching equipment from anchor points, curbs, or seismic bracing
3. Rigging and moving equipment to a staging area, using appropriate lifting equipment, dollies, or skates for units that can weigh several thousand pounds
4. Navigating the equipment through doorways, hallways, freight elevators, or roof hatches to a loading area
5. Loading equipment onto trucks for transport to recycling, resale, or disposal destinations
UPS cabinets, PDUs, and larger CRAC units are often too heavy or too large to move through standard interior doors without disassembly, so field breakdown is common. Rooftop CRAC and condensing units add another layer of planning, since access is frequently limited to a roof hatch, ladder, or crane pick depending on the building’s design. Raised floor systems, common in older data center suites, also affect how equipment and personnel move through the space and how cabling below the floor gets addressed during removal.
Facility conditions across the Inland Empire vary quite a bit; a converted office suite in an older Riverside business park has very different access constraints than a purpose-built data center space in a newer Ontario or Fontana industrial park, and the removal plan should reflect that.
What Happens to the Equipment After It’s Removed?

Not everything coming out of a data center is scrap. Depending on age, condition, and market demand, some equipment has meaningful resale or reuse value, and identifying that potential before demolition or scrapping is part of how we approach these projects.
Considerations that affect disposition include:
- Manufacturer, model, and capacity (a 500 kVA Eaton 9395 or Liebert EXL UPS in working condition carries different resale potential than an obsolete or damaged unit)
- Completeness of the system, including whether batteries, modules, or control components are present
- Remaining service life and maintenance history where documented
- Current market demand for that equipment type and capacity range
- Quantity, since a full row of matching PDUs or racks can be more attractive to buyers than mismatched single units
Equipment that isn’t suitable for resale is generally directed toward appropriate recycling channels, where copper, aluminum, steel, and other recoverable materials are separated and processed. Recovered value from resale or scrap can help offset a portion of the overall removal cost, though it isn’t something we promise will cover the project. IT hardware in particular often needs additional attention around data-bearing components, and any drives or storage media should go through appropriate sanitization, destruction, or chain-of-custody procedures as part of the overall project plan, coordinated with your IT and security teams.
What Should I Have Ready Before Requesting a Quote?
Projects move faster when we’re working from real information about the site and equipment rather than a general description. Before reaching out, it helps to gather:
- Facility details: building type, address, and whether the space is currently occupied or fully vacated
- Equipment inventory: manufacturer, model, and approximate quantity for the major systems involved (generators, UPS units, CRAC/CRAH units, switchgear, racks, etc.)
- Access information: loading dock availability, freight elevator access, door and hallway clearances, ceiling heights, and any roof access requirements
- Power status: whether equipment is still energized and whether other parts of the building need to remain operational during the work
- Timeline: lease turnover date, shutdown window, or target completion date
- Photographs: nameplate photos and general equipment/room photos, when available, help our team evaluate scope and asset recovery potential before a site visit
Even partial information is useful for an initial conversation. We can refine scope further during a site walk or call once we understand the general shape of the project.
Nearby Areas We Serve
Beyond the core Inland Empire cities, we provide this service to facilities throughout the broader region, including Ontario, Rancho Cucamonga, Fontana, San Bernardino, Riverside, Corona, Moreno Valley, Redlands and the surrounding communities along the I-10, I-15 and I-215 corridors. If your facility sits closer to the Coachella Valley, the San Gabriel Valley, or Orange County, our team can still evaluate the project; distance from the core Inland Empire cities doesn’t rule out a conversation.
Tell Us About Your Project
If you’re planning to remove a UPS system, generators, precision cooling units, switchgear, racks, or other data center equipment from a facility in the Inland Empire, use the form below to share the details: the equipment involved, the facility’s current operating status, access conditions, and your target schedule. Photos of the equipment and the space are helpful if you have them, but not required to start the conversation. Our team will follow up to discuss scope, sequencing, and what the removal process would look like for your specific site.