Data Center Equipment Removal in Bakersfield, California
Removing Equipment Without Shutting Down What’s Left
Bakersfield’s data center footprint includes colocation facilities along the Highway 99 corridor as well as enterprise server rooms, telecom points of presence and edge computing spaces supporting the region’s oil and gas, agriculture, logistics and public-sector operations. When one of these environments needs to retire a UPS system, swap out CRAC units, remove electrical distribution gear or clear out a rack of end-of-life servers, the challenge isn’t just physical removal — it’s doing so without disrupting the equipment and operations that stay in place.
USA Decom performs targeted data center equipment removal for facilities in Bakersfield and throughout Kern County. This work is different from a full decommissioning or white-space clearing project. It typically involves pulling specific systems — a generator, a battery string, a bank of PDUs, obsolete IT racks — while the rest of the facility continues operating. That distinction changes how the project has to be planned, sequenced and executed, and it’s where asset recovery and disposition planning become especially important, since much of what comes out of a working data center still has resale, reuse or recycling value.
What Drives Equipment Removal Projects in Bakersfield
Facility teams in this market typically call for equipment removal for a handful of recurring reasons:
- End-of-life UPS or battery replacement — swapping an aging Eaton 9395 or Vertiv Liebert EXL system for newer double-conversion or lithium-based technology
- Cooling system upgrades — replacing legacy CRAC units from Liebert, STULZ or Data Aire with higher-efficiency precision cooling
- Electrical infrastructure changes — removing switchgear, PDUs or panelboards during a power capacity upgrade
- Server and storage refresh cycles — clearing racks of retired Dell, HPE, Cisco or NetApp equipment ahead of new deployments
- Space reclamation — freeing up floor space in a colocation suite or enterprise server room for reconfiguration
- Tenant or lease turnover — removing equipment owned by a departing occupant so a suite can be returned to base-building condition
Each of these scenarios calls for a different removal sequence, but they share the same underlying requirement: isolate the target equipment safely, remove it without disturbing adjacent live systems, and make a sound decision about where the equipment goes next.
Building the Removal Scope
Before any equipment comes out, we work through a scope that identifies exactly what’s being removed, what’s staying energized, and how the two will be kept apart during the work. That typically includes:
- A walk-through or review of drawings identifying the specific systems in scope — model numbers, quantities, capacities and locations
- Confirmation of which circuits, panels or UPS modules can be de-energized and which must remain live throughout the project
- A lockout/tagout (LOTO) plan for every piece of equipment being disconnected, developed jointly with facility electrical staff or a licensed electrician where required
- A path-of-travel review from the equipment location to the loading area, including doorways, elevators, raised floor cutouts and any weight restrictions
- A schedule that accounts for facility maintenance windows, especially in colocation environments where tenant notification may be required
For active facilities, this scoping step matters more than almost anything else in the project. A generator or UPS pull in a live data hall has very little tolerance for improvisation — the plan needs to account for what happens if a breaker doesn’t isolate the way it’s expected to, or if a lift path is tighter than drawings suggest.
Equipment Categories We Commonly Remove

Standby and backup power. Diesel generator sets from CAT, Cummins, Kohler and Generac, along with associated fuel systems, automatic transfer switches and paralleling gear from ASCO or Russelectric.
UPS and battery systems. Modular and monolithic UPS units including Eaton 9395/93PM platforms and Vertiv/Liebert EXL, eXM and APM systems, along with APC/Schneider Galaxy and legacy MGE units. Battery removal is treated as its own discipline — VRLA and flooded battery strings require careful handling for weight, acid exposure and terminal isolation, and lithium-ion battery cabinets carry their own transport and disposal requirements that differ from traditional lead-acid systems.
Precision cooling. CRAC and CRAH units from Vertiv/Liebert, STULZ, Schneider/APC Uniflair and Data Aire, along with associated condensing units and piping. Refrigerant recovery is handled in accordance with applicable requirements before any unit is disconnected and rigged out.
Electrical distribution. Switchgear and panelboards from Square D/Schneider, Eaton/Cutler-Hammer, GE/ABB and Siemens/ITE, plus PDUs and RPPs from Vertiv/Liebert, PDI, Eaton/Powerware and APC. Busway systems such as Starline are removed in coordinated sections to avoid disturbing adjacent electrical infrastructure.
IT and network equipment. Server, storage and networking hardware from Dell, Dell EMC, HPE, Cisco, IBM, Lenovo, NetApp, Pure Storage, Supermicro, Arista and Juniper, along with the racks, rails and cabling that support them.
Racks and structural infrastructure. Cabinets and containment from APC, Chatsworth/CPI, Panduit and Rittal, along with Tate and other raised-floor systems when floor modifications are part of the scope.
Not every project touches every category — most removal engagements focus on one or two systems at a time, which is what separates this type of project from a full facility decommissioning.
Why Disposition Planning Comes Before Demolition
One of the most consequential decisions in an equipment removal project happens before a single wrench is turned: deciding what happens to each item once it’s disconnected. Treating everything as scrap is usually the least efficient path, both financially and logistically.
Several factors determine whether a piece of equipment is a resale, reuse or recycling candidate:
- Age and remaining service life. A UPS or generator that’s been well-maintained and is only a few years past its warranty period often has meaningful resale value in the secondary market, while genuinely obsolete equipment is more appropriately routed to recycling.
- Completeness and condition. Battery cabinets missing modules, cooling units with damaged coils, or IT gear stripped of drives are worth considerably less than complete, intact systems.
- Manufacturer and model demand. Certain UPS and generator platforms maintain stronger secondary-market demand than others, which affects whether reselling or parting out makes more sense.
- Quantity. A facility retiring a dozen matched CRAC units or a full row of racks has a different disposition path than a single obsolete unit.
- Removal condition. Equipment that comes out cleanly, without being cut apart or damaged during extraction, retains more resale value than material removed carelessly.
We evaluate these factors as part of scope development, not as an afterthought once equipment is already sitting on a loading dock. In many projects, generators, UPS modules, precision cooling units, switchgear, and functioning IT hardware are strong resale or reuse candidates, while damaged components, obsolete circuit boards, and non-functional units are directed to appropriate recycling streams. Copper, aluminum, and steel content from panels, busway, and structural rack material is separated and recycled rather than sent to landfill. Where hard drives or other data-bearing devices are part of the equipment being removed, appropriate sanitization, destruction or chain-of-custody procedures should be addressed as part of the overall project plan.
Explaining recoverable value up front matters because it directly affects project economics — recovered equipment and material value can offset a portion of the removal cost, though the amount varies significantly by equipment type, condition and current market demand, and shouldn’t be assumed until the equipment has actually been evaluated.
Rigging, Loading and Logistics
Data center equipment removal projects involve moving heavy, often awkward loads through spaces that weren’t necessarily designed for it. A monolithic UPS cabinet or a mid-size generator can weigh several thousand pounds, and getting it from a mechanical room or data hall to a truck requires attention to:
- Floor loading limits, particularly on raised floor systems or upper-level mechanical rooms
- Doorway, hallway and elevator dimensions along the path of travel
- Disassembly requirements for oversized units that won’t fit through standard openings
- Rigging equipment — pallet jacks, floor dollies, gantries or cranes depending on weight and access
- Loading dock configuration and truck staging, which in Bakersfield often needs to account for facilities located along industrial corridors with shared dock access
Freight planning follows the same logic. Equipment headed for resale or reuse needs to be packaged and transported in a way that protects its condition and value, while material headed for recycling can be consolidated and staged differently. Coordinating both streams on the same schedule keeps the project moving without one disposition path holding up the other.
Case Studies from the Field

Projects of this type in our experience often follow a similar arc. A facility operator identifies aging UPS and battery infrastructure that needs to come out ahead of a capacity upgrade — for example, a pair of modular UPS systems in the 150-300 kVA range along with their associated battery cabinets. The sequence typically starts with confirming isolation points and building a LOTO plan that keeps adjacent, still-operating UPS modules fully energized throughout the work. Battery strings are disconnected and staged separately from the UPS cabinets themselves, since the two often follow different disposition paths — batteries frequently go to recycling given their limited secondary-market life, while functional UPS modules are evaluated for resale. Cooling and electrical work is scheduled around the facility’s own maintenance windows, and equipment is rigged out through a loading dock during a period that minimizes disruption to any occupied or colocated space. The result is a facility that gets its capacity upgrade completed while retiring the old equipment through a mix of resale, recycling and disposal rather than a single blanket removal-and-scrap approach.
Serving Bakersfield and the Surrounding Kern County Market
USA Decom provides data center equipment removal services in Bakersfield and throughout the surrounding region, including Delano, Wasco, Shafter, Tehachapi, Arvin and Taft, as well as facilities along the broader Highway 99 corridor extending toward Visalia and the southern San Joaquin Valley. Kern County’s mix of energy, agriculture, logistics and telecom infrastructure means equipment removal needs can originate from a colocation facility, an enterprise server room supporting a corporate or public-sector operation, or a telecom point of presence — each with its own access conditions and scheduling constraints that a removal plan needs to account for.
Tell Us About the Equipment You Need Removed
If your facility has a UPS system, generator, cooling unit, electrical gear or IT hardware that needs to come out, use the form below to tell our team about the equipment involved — manufacturer, model or capacity if known, quantity, condition, location within the facility, and your target timeline. That information lets us put together a removal plan that protects what stays operational, moves recoverable equipment toward the right disposition path, and gets the project done on your schedule.