A data center rarely closes because the building itself has reached the end of its useful life. More often, the decision comes from a lease expiration, a migration to colocation or cloud infrastructure, a corporate consolidation, or a shift in how a company in the logistics, maritime or distribution sectors around the Port of Long Beach chooses to run its IT operations. Whatever triggers the decision, the result is the same: a facility full of interconnected electrical, mechanical and IT systems that has to be shut down, disassembled and cleared in the right order, without creating safety hazards, data exposure or unnecessary costs along the way.
USA Decom provides data center decommissioning services in Long Beach and throughout the surrounding Los Angeles and Orange County markets, working with facility managers, IT directors, colocation operators, corporate real estate teams and property owners who need the entire data center operation shut down, dismantled and turned over in a defined condition. This is different from simply pulling out a rack of servers or clearing a data hall. A full decommissioning project addresses the whole system, from the utility service entrance to the last piece of cabling in the raised floor.
What a Full Data Center Decommissioning Project Involves
A data center decommissioning project is fundamentally a sequencing problem before it is a removal problem. The facility typically has multiple interdependent systems that were designed to keep IT load running continuously, and shutting that down safely requires understanding how each system depends on the others.
A well-planned data sanitization or media destruction step, when data-bearing devices are involved, generally depends on categorizing the type of media, its confidentiality level and its intended disposition before selecting an appropriate method. That kind of structured thinking applies to the entire decommissioning project, not just the storage media. Before any physical removal begins, the project scope typically needs to identify:
- Which systems are still live and which have already been migrated or powered down
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- The electrical distribution path from utility service through switchgear, UPS, PDUs and branch circuits
- Mechanical systems supporting the space, including CRAC/CRAH units, chillers or rooftop condensing units
- Standby generation, including generators, fuel systems and automatic transfer switches
- Data-bearing assets requiring sanitization, destruction or documented chain of custody
- Structural elements such as raised flooring, containment, cable trays and overhead bus duct
- The condition the space needs to be turned over in, whether that is a shell return to a landlord or a cleared pad for redevelopment
Long Beach’s built environment includes everything from older commercial buildings converted into IT space to purpose-built facilities supporting the logistics, maritime and distribution operations concentrated near the Port of Long Beach and along corridors such as the 710 Freeway. Each building type brings different access conditions, floor loading limits and utility configurations, which is why scope development for this kind of project starts with a walk-through and a review of as-built drawings rather than a generic checklist.
Electrical Isolation and Shutdown Sequencing
The electrical systems in a data center are usually the most consequential part of the shutdown. Getting the sequence wrong can create arc-flash hazards, damage equipment that still has resale value, or leave circuits energized in ways that put personnel at risk during demolition.
A typical sequence works backward from the IT load toward the utility service. Server racks and network equipment are powered down and disconnected first, followed by PDUs and RPPs feeding those racks. UPS systems are then taken offline, batteries are isolated and disconnected, and the upstream switchgear and transformers are de-energized in coordination with the facility’s electrical contractor or the utility, depending on ownership of the service equipment. Generators and their automatic transfer switches are addressed separately, since they may need to remain operational to support other parts of a building even after the data center itself is shut down.
Coordination with the facility’s electrical engineer or a licensed electrical contractor is standard practice on this type of isolation work, particularly where switchgear, transformers or medium-voltage equipment are involved. USA Decom coordinates this sequencing directly with the customer’s engineering and facilities staff so that isolation, lockout and de-energization happen in the right order relative to the physical removal schedule.

Rigging, Access and Equipment Removal Logistics
Once systems are isolated, the physical removal work begins, and this is where equipment weight, dimensions and building access start to drive the schedule. A single UPS cabinet or battery string can weigh several thousand pounds; a central chiller, packaged generator or piece of switchgear can weigh considerably more. Getting that equipment out of the building safely depends on understanding the path from the equipment room to the loading dock or street before the first bolt is removed.
Practical considerations on a typical Long Beach project include:
- Freight elevator dimensions and weight capacity in multi-tenant or converted office buildings
- Floor loading limits on raised flooring, mezzanines or upper levels
- Door and corridor clearances for oversized equipment such as chillers, generators and switchgear sections
- Loading dock configuration and truck staging, which can be tighter in dense commercial districts of Long Beach compared to purpose-built industrial parks
- Crane or rigging access for rooftop mechanical equipment, including CRAC condensing units or packaged cooling systems
- Battery handling and transportation requirements for VRLA or lithium-based UPS battery strings
- Coordination with building management in occupied or mixed-use properties where other tenants continue normal operations during the project
Rigging plans typically break equipment into manageable sections when full-unit removal isn’t practical, particularly for larger switchgear line-ups, chillers or generator sets that were originally installed before the surrounding walls or partitions existed. This kind of disassembly requires people who understand both the mechanical fastening of the equipment and the structural path required to move it out safely.
Data-Bearing Equipment and Chain of Custody
Data center decommissioning projects almost always involve some quantity of data-bearing equipment, whether that’s a handful of servers in a smaller facility or racks of storage arrays in a larger one. Guidance on media sanitization generally distinguishes between clear, purge, and destroy methods, with the appropriate approach depending on the confidentiality of the data, the type of storage media, and its intended disposition. Because these decisions typically involve a company’s own IT security policy and compliance obligations, the customer’s IT or security team usually determines the required sanitization or destruction method and any documentation needed for internal or regulatory purposes. USA Decom coordinates the physical handling, transportation and chain-of-custody logistics for that equipment as part of the overall project plan, working around whatever process the customer’s IT team has specified.
Asset Recovery and Equipment Disposition
Not everything in a decommissioned data center is scrap. Depending on age, condition, manufacturer and market demand, some of the equipment coming out of a Long Beach facility may have resale or reuse value that can be recovered rather than sent straight to a recycler.
Equipment commonly evaluated for disposition includes UPS systems and battery strings from manufacturers such as Vertiv/Liebert, Schneider Electric/APC and Eaton; PDUs and RPPs; standby generators; CRAC and CRAH cooling units; switchgear and transformers; server racks, cabinets and containment systems; and copper cabling, which retains meaningful commodity value even when the equipment itself does not. The realistic value of any of these categories depends heavily on age, completeness, physical condition, and the current secondary market for that specific type of equipment, so no two projects generate the same recovery outcome. Recovered value from resale, reuse or scrap can help offset a portion of overall project costs, though it isn’t something that should be assumed to cover the full cost of decommissioning before the equipment has actually been evaluated.
Segregating recyclable materials such as copper, aluminum and structural steel from equipment destined for resale, and keeping both separate from true waste streams, is part of what keeps a decommissioning project’s disposition plan organized and reduces unnecessary landfill volume.
Coordinating Work in an Active or Partially Occupied Facility
Many data center decommissioning projects in Long Beach don’t happen in an empty building. A data center is sometimes one operation within a larger commercial property, or portions of the facility may remain in use by other departments or tenants while the IT space is cleared. That reality shapes how the project is planned and executed.
Work zones need to be clearly defined so that demolition activity, equipment staging and material movement don’t interfere with ongoing operations elsewhere in the building. Noise, dust and vibration from disassembly work may need to be scheduled around business hours in occupied properties. Elevator and loading dock access often has to be shared or scheduled around other building activity, particularly in downtown Long Beach commercial buildings where multiple tenants use the same core infrastructure. Communication with property management, other tenants and the customer’s own operations staff becomes as important as the physical work itself in these situations.
Case Studies from the Field

Projects of this type often begin with a facility transitioning out of an on-premises data center model, whether because operations have moved to colocation, cloud infrastructure, or a consolidated regional site. On a project in this category, our team works from an inventory of the electrical and mechanical systems, develops a shutdown sequence with the customer’s IT and facilities staff, and schedules removal in phases that follow the isolation order: IT load first, then power distribution, then central plant equipment, then structural elements like raised floor and containment.
In facilities located within logistics or distribution-heavy markets like Long Beach, where properties often sit close to port operations and major freight corridors, project scheduling has to account for truck access windows and coordination with building or property management to avoid conflicts with surrounding freight activity. Similar projects have also involved separating recoverable UPS and battery equipment from units too degraded for resale, so that the viable equipment can move through appropriate resale or recycling channels rather than being scrapped by default. The result on projects like these is a facility that’s fully cleared down to whatever turnover condition the lease, sale agreement or redevelopment plan requires, with a documented disposition record for the equipment and materials that came out of the building.
Site Restoration and Turnover Requirements
The final phase of a data center decommissioning project is turning the space over in the condition the customer needs. That might mean a shell-condition return to a landlord, a cleared space ready for a new tenant’s build-out, or a site prepared for redevelopment. Requirements vary considerably depending on the lease terms, sale agreement or corporate real estate strategy driving the project.
Turnover scope commonly includes removing raised flooring and understructure, patching penetrations left by cabling, ductwork or conduit, removing wall-mounted equipment brackets and support steel, and restoring finishes to the condition specified in the governing lease or agreement. Establishing this turnover standard early in the planning process, ideally before removal work begins, avoids disputes later about what “cleared” actually means for a given property.
Nearby Markets We Serve
Beyond Long Beach itself, USA Decom provides data center decommissioning services throughout the surrounding Los Angeles and Orange County region, including Signal Hill, Carson, Lakewood, Compton, Torrance, Cerritos, Anaheim and the broader South Bay and Gateway Cities areas. Facilities located anywhere within reach of the Long Beach and Los Angeles port complex, the 710 and 405 Freeway corridors, or the surrounding logistics and industrial submarkets fall within our regional service area.
Tell Us About Your Project
If your organization is planning a data center shutdown, consolidation, lease exit or full facility decommissioning in the Long Beach area, our team can review the scope and help you plan the sequencing, removal and disposition of the systems involved. Use the form below to tell us about the facility, its size and equipment mix, the electrical and mechanical systems involved, your target schedule, and any turnover or lease-exit requirements that need to be met. Photographs of the space and equipment, if available, help us understand the project faster and provide more useful feedback on scope and next steps.