El Paso’s data center footprint has expanded over the past several years, supported by significant hyperscale and enterprise infrastructure investment along the region’s power and logistics corridors as well as continued growth in colocation facilities serving cross-border manufacturing, healthcare, government and defense-related operations. As that market matures, facility owners, IT leadership and colocation operators are increasingly facing the other side of the data center lifecycle: retiring, consolidating or fully decommissioning space that has reached end of service life, is being repurposed, or is being turned over as part of a lease expiration, ownership change or technology refresh.
Complete data center decommissioning is a different undertaking than removing an individual system or clearing a single data hall. It involves coordinating the shutdown, disconnection, removal and disposition of an entire facility’s IT and infrastructure ecosystem, from servers and network gear down to switchgear, generators, UPS plants, PDUs, cooling systems, cabling and raised flooring, while satisfying whatever turnover condition the landlord, buyer or corporate real estate team requires. USA Decom provides these services to facility owners, data center operators, IT executives and property teams across El Paso and the surrounding region, guiding projects from initial walkthrough through final site turnover.
Why El Paso Facilities Are Facing Decommissioning Decisions Now
El Paso’s data center growth has been shaped by significant hyperscale and enterprise development activity in the region, alongside the metro’s longstanding role as a logistics and cross-border manufacturing hub tied to Interstate 10 and one of the busiest land ports on the U.S.-Mexico border. That combination has supported steady enterprise and colocation demand from healthcare systems, government contractors, distribution operators and the maquiladora supply chain extending into Ciudad Juárez.
As newer, more efficient capacity comes online, older facilities are retired, consolidated or repurposed. A hospital system may be moving IT operations to a colocation provider. A regional business may be closing a legacy server room as workloads shift to the cloud. A colocation operator may be exiting a lease or reconfiguring a facility for new tenants. A corporate real estate team may be preparing a building for sale or redevelopment and need the data center space cleared and restored. Each of these situations calls for the same underlying capability: a coordinated, technically sound decommissioning process rather than piecemeal equipment removal.
What Complete Data Center Decommissioning Involves
A full decommissioning project is broader than removing racks or pulling a UPS system. It typically spans several interconnected systems that were designed and installed to work together, and each one has to be shut down, disconnected and removed in the right sequence:
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Servers, storage arrays, network switches and racks/cabinets
- UPS systems and associated battery strings
- Standby and emergency generators
- PDUs, RPPs and branch circuit distribution
- Medium- and low-voltage switchgear and switchboards
- Transformers
- CRAC and CRAH cooling units and associated piping
- Structured cabling, cable tray and overhead infrastructure
- Containment systems and raised access flooring
Because these systems are interdependent, the sequence in which they come down matters. Pulling power before IT equipment is properly shut down, or removing cooling before confirming no equipment remains energized, creates unnecessary risk. A well-planned decommissioning project maps out the order of operations before any equipment is touched.

Planning and Scope Development
Every decommissioning project starts with understanding what is actually in the facility and what condition it needs to be left in. That means walking the space, documenting equipment by system and location, identifying what is still live versus already de-energized, and confirming utility service points, backup power configuration and any shared infrastructure that serves other tenants or building systems that must remain untouched.
Scope development also has to account for the facility’s operational status. A data center being decommissioned in phases while portions remain live is a fundamentally different project than a facility that has already been fully powered down. Active-facility decommissioning requires closer coordination with the customer’s operations and engineering staff, more careful work-zone separation, and a sequence that avoids any disruption to systems that need to stay running until their scheduled cutover date. We work through these details with the facility team early so the project plan reflects the actual condition of the site rather than assumptions about it.
Shutdown Sequencing and Active-Facility Coordination
Sequencing is one of the most important technical elements of a data center decommissioning project. IT equipment generally needs to be powered down and disconnected first, followed by the distribution equipment feeding it, working back through PDUs and RPPs to UPS systems, then to switchgear and, where applicable, to standby generation. Confirming isolation at each stage before physical removal begins is a basic safety requirement, and it also protects equipment that is being recovered for resale by preventing improper shutdown procedures that can damage components.
In facilities that remain partially operational during the project, whether because other tenants occupy the building, because portions of the white space are staying in service, or because critical infrastructure supports adjacent operations, coordination becomes more involved. This can mean scheduling work around defined maintenance windows, maintaining temporary power or cooling to areas not yet in scope, and keeping ongoing communication with the customer’s facilities and IT teams so nothing scheduled to remain live is inadvertently affected.
Data-Bearing Equipment Considerations
Servers, storage arrays and other data-bearing devices carry an additional layer of concern beyond physical removal. Facility owners and IT leadership typically need assurance that appropriate handling, chain-of-custody and data sanitization or destruction procedures are followed for this equipment as part of the overall project plan. Every organization has different requirements here depending on its industry, its compliance obligations and its internal IT asset disposition policy, and those requirements should be identified and documented during project planning rather than addressed after equipment has already left the site.
Electrical Systems: Isolation, Removal and Disposition
The electrical infrastructure in a data center is often the most valuable and the most technically demanding portion of the decommissioning scope. UPS systems, such as Vertiv Liebert or Eaton platforms commonly found in enterprise and colocation environments, require confirmed isolation of both utility input and battery strings before disconnection, since stored energy in battery cabinets can present a hazard even after a unit is shut down. Standby generators, whether Caterpillar, Cummins or another manufacturer, need fuel systems, exhaust and control wiring addressed before rigging and removal. Switchgear and switchboards, frequently built by manufacturers like Eaton, Square D, Siemens or ABB, sit at the top of the facility’s power distribution hierarchy and require utility or building engineering coordination to de-energize safely before disconnection work begins.
Removal logistics vary significantly by equipment type. A rooftop or exterior generator may require crane access and coordination with building management on rigging paths, while an indoor UPS system or switchgear lineup installed in a purpose-built electrical room may need to be broken down into sections that fit through existing doorways, freight elevators or loading dock openings. Understanding equipment dimensions, weights and floor loading limits before mobilization avoids delays once crews are on site.
Cooling Systems and Facility Infrastructure
CRAC and CRAH units, along with associated chilled water or refrigerant piping, condenser connections and controls, need to be de-energized and disconnected as part of the overall project. In a full facility decommissioning, this work is coordinated alongside electrical removal rather than treated as a separate project, since cooling infrastructure is typically tied into the same building management and monitoring systems as the power distribution equipment. Facilities with more extensive precision cooling requirements, or with raised floor and containment systems that need to be fully cleared as part of a white space turnover, may warrant more focused attention on those systems depending on the scope the customer defines.

Rigging, Removal and Site Logistics
Getting equipment out of the building is often the most physically demanding part of the project. Data center equipment tends to be heavy, dense and awkwardly shaped relative to standard doorways and freight paths. Switchgear lineups, transformers and larger UPS cabinets frequently require mechanical rigging, dollies, floor protection and a documented removal path that accounts for elevator capacity, dock height, turning radius and any weight restrictions in the building. In multi-tenant or active facilities, this logistics planning also has to account for other occupants, shared corridors and building access hours.
Loadout and transportation planning should be established before removal begins, particularly for equipment being preserved for resale, where careless handling during rigging can reduce recoverable value. Coordinating truck access, staging areas and disposal or recycling destinations in advance keeps the project moving rather than accumulating equipment on site with no clear path out.
Asset Recovery, Recycling and Equipment Disposition
Not everything coming out of a decommissioned data center is scrap. UPS systems, generators, switchgear, transformers, PDUs, racks and even certain cooling equipment can retain resale or reuse value depending on manufacturer, model, age, condition, completeness and current secondary-market demand. Identifying which equipment has recovery potential before demolition or scrapping begins is part of how we approach these projects, and recoverable equipment and commodity value, such as copper, aluminum and structural steel, can help offset a portion of the overall project cost. We do not guarantee that every piece of equipment will have resale value or that recovered value will cover project costs, but a deliberate asset recovery review is a standard part of scope development rather than an afterthought.
From the Field: Data Center Decommissioning Project Conditions
Data center decommissioning projects of this type often share common characteristics regardless of market: a facility with a mix of legacy and newer infrastructure, a defined turnover deadline tied to a lease, sale or corporate consolidation.