A data center closure rarely happens on a simple timeline. A lease is ending, a colocation contract is being consolidated, a legacy facility is being replaced by newer infrastructure, or an operator is exiting a site entirely. Whatever the trigger, the facility still has to be shut down safely, cleared responsibly and turned over in the condition the landlord, buyer or corporate parent requires. That process touches server racks and network gear, UPS and battery systems, generators, switchgear, cooling infrastructure, cabling and containment, and it has to happen without creating safety exposure, data risk or unnecessary cost.
USA Decom works with facility managers, IT infrastructure teams, property owners and general contractors who need a single point of accountability for a complete data center decommissioning project in Bakersfield and throughout Kern County. This page walks through the questions we hear most often from teams planning this kind of shutdown, along with the practical considerations that shape scope, sequencing and cost.
What Does a Complete Data Center Decommissioning Involve?
Full decommissioning is different from removing a single piece of equipment. It’s the coordinated shutdown and clearing of an entire data center environment, from the IT layer down to the building shell. Depending on the facility, that scope can include:
- Servers, storage arrays, network switches and cabinets
- UPS systems and associated battery strings
- Standby and emergency generators
- PDUs, RPPs, busway and branch circuit distribution
- Switchgear, transformers and main electrical gear
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- CRAC/CRAH units and other precision cooling equipment
- Structured cabling, fiber runs and cable trays
- Containment systems and raised access flooring
A decommissioning project typically ends with the space handed back in the condition specified in the lease or sale agreement, whether that’s a swept, disconnected shell or a fully restored space ready for a different tenant. Because scope spans IT, electrical, mechanical and structural systems, the project usually needs a coordinated plan rather than a series of disconnected vendor calls.
This is a distinct service from removing a specific equipment category, such as pulling UPS units or clearing white space racking. Those narrower projects have their place, but when the whole facility is going offline, the shutdown sequence, isolation plan and disposition strategy have to account for every system at once.
Bakersfield and Kern County’s Data Infrastructure Landscape
Kern County’s economy has long been anchored by oil and gas production, large-scale agriculture and food processing, and warehousing and logistics along the I-5 and SR-99 corridors. The county is also a significant producer of renewable and alternative energy, which in recent years has drawn interest from developers looking to pair new data center capacity with existing power generation and transmission infrastructure in the region. Bakersfield itself is home to established enterprise and telecom infrastructure, including smaller colocation and network uplink facilities that have operated in the market for years alongside corporate and institutional server rooms.
That mix means decommissioning projects in the Bakersfield area can look quite different from one another: a company consolidating a legacy server room into a larger regional facility, a colocation tenant exiting a cage, or a property owner retiring an older mechanical and electrical plant ahead of a renovation or resale. Kern County’s broader industrial base in oilfield services, agricultural processing and warehousing also means many facility teams are already familiar with large-scale equipment removal, rigging and electrical isolation from other parts of their operations, which often makes coordination on a data center project more straightforward from the outset.

How Do You Sequence a Shutdown Without Disrupting Active Operations?
Very few decommissioning projects start with a facility that’s already fully offline. Most involve some combination of live circuits, partially migrated workloads, backup systems still in service, and neighboring tenants or departments that need to keep operating. Sequencing has to account for all of it.
A typical shutdown sequence includes:
- Confirming that workloads, backups and connectivity have migrated or been formally decommissioned before physical removal begins
- Verifying which circuits, UPS modules and generator systems remain live versus which have already been taken offline
- Establishing a de-energization order that respects redundant feeds, maintenance bypass paths and any equipment still supporting building systems outside the data center
- Coordinating with facility engineers, IT staff, utility representatives and any remaining tenants on timing and access
- Staging removal by zone or system rather than attempting a single all-at-once teardown
On projects with a hard deadline, such as a lease termination date or a colocation contract expiration, the sequence also has to build in enough time for electrical isolation, verification and documentation before any equipment leaves the building. Rushing that part of the process is where safety incidents and rework tend to originate.
What Happens to Servers, Storage and Data-Bearing Equipment?
Servers, storage arrays and network equipment carry both physical value and data risk, and both have to be addressed before equipment leaves the site. Data-bearing devices may require appropriate sanitization, destruction or chain-of-custody procedures as part of the overall decommissioning plan, and many organizations have internal or contractual requirements that dictate how that process needs to be documented.
From a physical standpoint, planning typically addresses:
- Inventory and asset tagging of racks, servers and network gear before removal
- Sequencing removal to match any required data-handling or chain-of-custody steps
- Safe extraction from racks and cabinets, particularly in facilities with tight aisle clearances or elevated flooring
- Packaging and transport that protects equipment with potential resale or reuse value
Because data handling requirements vary by industry, contract and internal policy, the specifics of that part of the process are usually worked out directly with the customer’s IT and compliance teams rather than treated as a standard step.
How Is Electrical Equipment Safely De-Energized and Removed?
Data center electrical systems are built with redundancy on purpose, which means decommissioning them safely requires identifying every energy source before any equipment is touched. A single circuit may be fed by a utility source, a generator, a UPS output, and a maintenance bypass path, and all of them need to be accounted for.
Electrical work of this kind is generally governed by established workplace electrical safety practices, including the lockout/tagout and verification principles addressed in NFPA 70E, which requires establishing an electrically safe work condition before conductors or circuit parts are exposed. In practice, that means every isolating device has to be identified, physically locked out, tagged, and verified de-energized with appropriate test equipment before disconnection and removal proceed. On systems with multiple energy sources, crews or work periods, this isolation work often needs a written, sequenced plan rather than a general instruction to “shut off power.”
Switchgear, transformers, PDUs, RPPs and busway all have to be worked through this same isolation and verification process before they can be safely disconnected, rigged and removed from the building.
What About UPS Systems, Batteries and Generators?
UPS systems and standby generators are usually among the more valuable assets in a data center, but they also carry some of the highest safety exposure during decommissioning. UPS modules can retain stored energy even after input power is removed, and battery strings, whether VRLA or lithium-ion, need to be de-energized and disconnected using manufacturer-specified procedures before physical removal.
Equipment found in Bakersfield-area facilities may include modular and cabinet-based UPS systems such as Vertiv Liebert platforms, along with legacy units still identified by their original Liebert nameplate, as well as diesel or natural gas standby generators sized to the facility’s critical load. Each system has its own disconnect sequence, and battery modules in particular typically require a documented removal procedure to avoid tipping hazards, arc exposure or accidental re-energization.
Generators add their own logistics considerations: fuel systems need to be addressed, exhaust and structural connections have to be disconnected, and units often require a crane or heavy rigging plan depending on weight, placement and access. On rooftop or mechanical-yard installations, that rigging plan has to account for crane positioning, load paths and any weight restrictions on the surrounding structure.
Can Decommissioned Equipment Be Recovered Rather Than Scrapped?

Not every component of a data center is headed for the scrap bin. Servers, network switches, UPS modules, generators, switchgear, transformers, CRAC units and copper-heavy cabling can all carry resale, reuse or recycling value depending on age, condition, completeness and current secondary-market demand.
Before demolition-style removal begins, it’s worth identifying:
- Which equipment is recent enough or complete enough to have resale or reuse value
- Which components should be recycled for material value, such as copper, aluminum and steel
- Which systems need to be documented and disposed of according to applicable requirements, particularly batteries and any equipment containing refrigerants or other regulated materials
Recoverable equipment and commodity value can help offset a portion of overall project costs, though the amount varies significantly by project and shouldn’t be assumed before the equipment has actually been evaluated. Identifying disposition paths early, before crews start cutting and hauling, is usually what determines whether recoverable assets get captured or lost to scrap.
What Should You Prepare Before Requesting a Quote?
A more complete picture up front leads to a more accurate scope and schedule. Before reaching out, it helps to gather:
- Facility address, square footage and general layout, including raised floor or containment areas
- Current operational status: fully live, partially migrated, or already offline
- An equipment list or rack elevation showing servers, UPS units, generators, switchgear and cooling systems, with manufacturer and model information where available
- Any known lease, sale or shutdown deadlines driving the timeline
- Data-handling or chain-of-custody requirements from IT, legal or compliance
- Site access details: dock doors, freight elevators, floor loading limits, parking and staging areas
- Photos of key equipment rooms, electrical gear and any unusual access conditions
Having this information available doesn’t need to be exhaustive on day one, but the more that’s known before the first site walk, the faster a workable scope and schedule can come together.
Nearby Areas We Serve
In addition to Bakersfield, our team provides data center decommissioning services throughout the surrounding Kern County and southern San Joaquin Valley region, including Delano, Shafter, Tehachapi, Ridgecrest and Taft, as well as facilities further north toward Visalia and Fresno. We also work with facilities in Santa Clarita and the Antelope Valley communities of Palmdale and Lancaster for projects that fall along the Highway 14 and I-5 corridors connecting the Central Valley to the Los Angeles basin.
Tell Us About Your Project
If you’re planning a data center shutdown in Bakersfield or anywhere in Kern County, use the form below to share some details about the facility, the equipment involved and your target timeline. Let us know the facility type, current operational status, approximate scope of equipment, any lease or shutdown deadlines, and site access conditions. From there, our team can walk through the project with you and outline what a coordinated shutdown, removal and turnover plan would look like for your specific site.