A Growing Data Center and Critical-Facility Market Around Temple
Temple sits along the I-35 corridor between Austin and the Dallas-Fort Worth metro, an area that has attracted significant hyperscale data center and digital infrastructure investment in recent years. Large technology and infrastructure companies have located major campus projects in and around Temple, adding to a base of manufacturing, healthcare, logistics and corporate facilities that already rely on precision cooling to protect server rooms, IT closets and mechanical spaces.
That level of investment doesn’t just create new construction work. It also drives a steady cycle of refresh, retrofit, relocation and decommissioning activity at existing facilities as capacity is reconfigured, leases turn over, colocation tenants change, or legacy mechanical rooms are replaced with newer thermal management systems. Whether the project involves a hyperscale support building, a colocation suite, a corporate server room, a hospital IT closet, or a smaller edge facility tied to the region’s logistics and manufacturing base, precision cooling equipment eventually reaches the end of its service life and has to come out safely.
USA Decom provides CRAC and CRAH removal services for organizations in Temple and throughout the surrounding Central Texas market, working directly with facility teams, general contractors, IT infrastructure managers and mechanical contractors to get precision cooling equipment disconnected, dismantled and removed on schedule.
What This Article Covers
This guide is written for facility managers, data center operators, mechanical contractors and property teams who need to remove computer room air conditioning (CRAC) or computer room air handler (CRAH) equipment from a Temple-area facility — whether that’s a single failed unit, a full row of in-row coolers, or an entire mechanical room being cleared ahead of a redevelopment or lease turnover.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
CRAC, CRAH and In-Row Cooling: Know What You’re Removing
Precision cooling terminology gets used loosely, but the distinction matters for planning a removal:
- CRAC (Computer Room Air Conditioner): Self-contained DX (direct expansion) units with an integral compressor, typically perimeter-mounted, using refrigerant circuits tied to an outdoor condenser or dry cooler.
- CRAH (Computer Room Air Handler): Chilled-water units without a compressor, relying on a facility chilled-water loop and requiring coordination with the central plant rather than refrigerant recovery.
- In-row cooling: Units mounted directly within a rack row rather than around the room perimeter, common in higher-density colocation and hyperscale support spaces.
- Downflow vs. upflow: Refers to whether conditioned air discharges beneath a raised floor or directly into the room, which affects how ductwork, floor tiles and underfloor cabling interact with the removal.
Perimeter DX units, chilled-water CRAH systems and row-based in-row coolers are all common in Temple-area facilities, from legacy server rooms built years ago to newer builds supporting the region’s growing data center footprint. Manufacturers commonly encountered include Vertiv/Liebert systems such as the DS, DSE and CW perimeter lines, and Liebert CRV in-row units; STULZ CyberAir and CyberRow platforms; and Schneider Electric/APC Uniflair and InRow RC/RD systems. Legacy nameplates matter here — older equipment may still carry the original Liebert or Uniflair branding even after corporate ownership changes, and recognizing that helps confirm refrigerant type, control platform and rigging requirements before a crew ever arrives on site.
Why CRAC/CRAH Removal Projects Come Up

Several situations typically bring a Temple-area facility to the point of needing precision cooling removed:
- Replacement of aging DX units with more efficient in-row or chilled-water systems
- Consolidation of IT load into a smaller footprint, leaving excess cooling capacity stranded
- Full or partial data hall decommissioning ahead of a lease turnover or building repurpose
- Facility closures or relocations where the space is being converted to warehouse, office or light industrial use
- Colocation tenant moves that leave dedicated cooling infrastructure behind
- Mechanical failures where a unit is beyond economical repair and needs to be pulled rather than serviced
Each of these scenarios changes the removal sequence. A single failed 20-ton unit being swapped out during an otherwise live operation is a very different project than clearing an entire row of 30- to 40-ton perimeter units from a data hall being fully decommissioned.
Planning the Shutdown Before Anything Comes Apart
Precision cooling removal starts well before any physical disconnection. Our team typically works through the following before mobilizing:
Confirm the cooling architecture. Is the unit DX with a refrigerant circuit and remote condenser, or chilled-water fed from a central plant? This determines whether refrigerant recovery is required or whether the work centers on isolating and draining a water/glycol loop.
Identify redundancy and load impact. In a live environment, removing one CRAC unit from an N+1 or 2N cooling configuration may be routine. Removing multiple units, or the last unit serving an active zone, requires closer coordination with IT and facilities staff to confirm remaining capacity can hold room conditions during the work window.
Establish electrical isolation points. Precision cooling units are typically hardwired on dedicated circuits, sometimes fed from critical or UPS-backed panels depending on controls. Lockout/tagout and confirmation of de-energized circuits has to happen before any panel or unit disconnection begins.
Sequence around active operations. In a working data center or server room, removal work often happens in defined maintenance windows, with barriers or containment separating the work area from live racks, and close coordination with on-site operations staff throughout.
Disconnection and Refrigerant Handling
For DX-based CRAC units, refrigerant recovery is a required step before the unit can be physically separated from its piping. This applies to systems such as air-cooled or water/glycol-cooled Liebert CRV and CyberAir DX platforms, where refrigerant lines run to a remote condenser or dry cooler. Recovery, handling and documentation should follow applicable federal requirements for refrigerant management, and the specific refrigerant type (commonly R410A on newer in-row systems) affects both the recovery procedure and the equipment’s resale or scrap value.
Chilled-water CRAH units skip refrigerant recovery but still require the chilled-water and condensate piping to be properly isolated, drained and capped before disconnection, along with coordination with whoever manages the central chilled-water plant to avoid affecting other zones on the same loop.
Electrical disconnection follows: unhooking power feeds, control wiring, humidifier supply lines where present, and any building management system (BMS) or unit-level monitoring connections tied into the equipment.
Rigging, Access and Physical Removal
Precision cooling units are heavy, awkwardly shaped, and often located in spaces that weren’t designed with equipment removal in mind. A 20-to-30-ton perimeter CRAC unit can weigh well over a thousand pounds, and in-row units — while narrower — still require careful maneuvering through rack rows, containment aisles and raised-floor cutouts.
Common access and rigging considerations on these projects include:
- Raised floor loading limits and the need for temporary floor protection during equipment movement
- Doorway, elevator and corridor clearances, particularly in multi-tenant or upper-floor facilities
- Disassembly of larger units into sections where full-size removal isn’t practical through existing openings
- Coordination of loading dock access and street-level staging for larger campuses
- Protecting adjacent live racks, cabling and containment structures during removal in occupied spaces
On projects involving a full mechanical room or an entire row of in-row units, sequencing matters. Units are typically taken out in a planned order that keeps remaining cooling capacity online for as long as possible, rather than all at once.
Proven Project Experience: Precision Cooling in the Field
On projects involving multi-unit CRAC removals, our approach generally starts with confirming which units can come offline first without affecting room conditions for the remaining IT load. A recent project of this type for a facility consolidating IT capacity involved removing several perimeter DX units while a portion of the room remained live — work sequenced around maintenance windows, with refrigerant recovery completed on each unit before disconnection, and remaining capacity monitored throughout to confirm room temperature and humidity stayed within range. Units with reasonable remaining service life were evaluated for resale, while older or damaged equipment was broken down for component and material recovery. That kind of sequencing and evaluation reflects how we approach comparable precision cooling projects in Temple and similar markets.

Asset Recovery and Recycling Potential
Not every CRAC or CRAH unit is scrap the moment it’s disconnected. Depending on age, condition, capacity and completeness, precision cooling equipment can carry resale or component value in the secondary market — particularly larger-capacity DX and chilled-water units, in-row systems still under a reasonable service life, and units from manufacturers with active secondary markets like Vertiv/Liebert, STULZ and Schneider Electric/APC.
Where resale isn’t practical, recoverable materials including copper coil, compressors, structural steel and electrical components are typically segregated for recycling rather than sent to landfill. Recognizing recovery potential before a unit is torn down or scrapped is part of evaluating the project, and it can help offset a portion of overall removal costs depending on the specific equipment involved.
What to Gather Before You Reach Out
A faster, more accurate assessment starts with basic information about the equipment and the site. Before requesting a quote, it helps to have on hand:
- Manufacturer and model number (nameplate photo is ideal)
- Cooling type — DX/air-cooled, water/glycol, or chilled-water
- Approximate tonnage per unit (5-ton up through 40-ton-plus perimeter and in-row systems are all common)
- Number of units and whether they’re perimeter, in-row, or a mix
- Current operational status — running, offline, or already failed
- Facility access details — floor level, raised floor or slab, doorway and corridor widths
- Whether the surrounding space is live/occupied or already vacated
- Target removal timeline, including any lease turnover or shutdown deadlines
- Photos of the units, connections and access path where possible
This information lets our team evaluate rigging requirements, refrigerant handling needs, and realistic scheduling before a site visit, rather than guessing at scope.
Serving Temple and the Surrounding Central Texas Corridor
USA Decom provides CRAC and CRAH removal services in Temple and throughout the surrounding region, including Belton, Killeen, Waco, Georgetown, Round Rock, and the broader I-35 corridor between Austin and the Dallas-Fort Worth metro. That regional reach matters given how much data center and industrial development in Central Texas is concentrated along this same corridor, and how often facility and IT teams manage multiple sites across the area rather than a single building.
Tell Us About Your Project
If you’re planning a CRAC or CRAH removal in Temple — whether it’s a single failed unit, a full row of in-row coolers, or a complete mechanical room being cleared for a facility turnover — use the form below to tell our team about the equipment, the facility, and your target schedule. Include manufacturer and model information, unit count, cooling type and any access constraints you’re aware of, and we’ll follow up to discuss scope and next steps.