A facilities team at a Rancho Cordova colocation site recently faced a familiar problem: three aging downflow CRAC units serving a raised-floor data hall had reached the end of their useful service life, and the operator needed them removed before new precision cooling equipment could be installed in the same footprint. The units had been in continuous operation for well over a decade, the refrigerant lines ran beneath a raised floor packed with power and data cabling, and the room needed to stay partially live while adjacent racks continued serving customer load. This is the kind of project USA Decom is built around — not a simple haul-away, but a coordinated removal that has to respect an active mechanical and electrical environment while getting old equipment out safely and efficiently.
Projects like this come up constantly across the Sacramento region as data centers, colocation facilities, server rooms and mission-critical spaces cycle through equipment refreshes, capacity upgrades and facility consolidations. Whether the site is a purpose-built data center in McClellan Park, a colocation suite in Rancho Cordova, a corporate server room in downtown Sacramento, or a critical environment supporting a state agency, hospital system or university campus, the underlying removal challenge tends to look similar: precision cooling equipment that was never designed to be quickly disconnected and pulled out of a finished, occupied space.
What CRAC Removal Actually Involves
Computer room air conditioning (CRAC) units and their chilled-water cousins, computer room air handlers (CRAH), are built to run for years with minimal disturbance. That reliability becomes a liability once a unit needs to come out. A typical downflow or upflow CRAC unit — commonly sized in the 5-ton, 10-ton, 15-ton, 20-ton and 30-ton range for smaller server rooms, and scaling into 40-ton and 50-ton-plus configurations for larger data halls — is tied into refrigerant piping, condensate lines, electrical feeds, and often building automation or unit-level controls. Direct expansion (DX) units add a refrigerant circuit and condenser connection that has to be properly recovered before disconnection. Chilled-water CRAH units replace the refrigerant circuit with piping tied into a central chilled-water loop, which changes the disconnection sequence but does not make the removal any less involved.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Before any unit gets unbolted from the floor, our team works through the same basic questions on every project: What is the unit still supporting, and can it be isolated without affecting other racks or systems? Where do the refrigerant lines, condensate lines, electrical whips and control wiring physically run, and how much of that infrastructure has to be traced and disconnected safely? Is the unit a standalone perimeter cooling unit, or is it part of an in-row or CyberRow-style arrangement tied into containment and airflow management for a specific row of racks? Answering these questions before mobilization is what keeps a CRAC removal project from turning into a series of surprises once demolition starts.
Refrigerant Recovery and Disconnection
For DX-based CRAC units, refrigerant recovery is a required first step, not an afterthought.
Under EPA Section 608, all refrigerant must be recovered from any HVAC appliance before it is disposed of, scrapped, or recycled, and this applies regardless of the equipment’s size or refrigerant charge.
That means a legacy Liebert unit still running an older refrigerant blend has to be handled with the same care as a newer STULZ CyberAir unit charged with a current refrigerant. Refrigerant type, charge quantity and unit age all affect how recovery is planned, and improperly handled refrigerant can create both an environmental issue and a compliance problem for the facility owner.
Once refrigerant has been recovered, electrical disconnection follows — typically involving coordination with facility electrical staff or an electrician to safely de-energize whips, breakers and any building management or monitoring connections tied to the unit. Condensate and, where applicable, chilled-water or condenser water piping has to be drained and disconnected as well. On raised-floor environments, this often means lifting floor tiles around the unit footprint, tracing cabling and conduit that may have been added or rerouted over the years, and confirming that nothing still active is riding along the same pathway as the unit being removed.
Rigging, Access and Difficult Floor Conditions

Precision cooling units are heavy, and their placement is rarely convenient. A 20-ton or 30-ton Liebert DS or CyberAir unit can weigh well over a thousand pounds, and it is usually sitting inside a finished room with raised access flooring, tight aisle clearances, containment structures, and cable pathways overhead. Getting the unit out frequently means breaking it down into manageable sections — separating the coil section, blower assembly, cabinet and base — rather than attempting to move it as a single piece through a standard doorway or freight elevator.
Raised floor systems add another layer of planning. Floor tiles and pedestals were not designed to support concentrated point loads from rigging equipment or from dragging a cooling unit across the floor field. Our approach typically includes identifying safe travel paths across the raised floor, protecting adjacent tile sections, and using appropriate material handling equipment rather than relying on brute force. In older facilities or converted office space repurposed as a server room, access can be even more constrained — narrow corridors, standard-height doorways, and freight elevators sized for office equipment rather than mechanical equipment. These conditions are exactly why a generic HVAC contractor unfamiliar with data center environments can struggle with a project that a team experienced in precision cooling removal handles routinely.
Working Around Active IT Load
Very few CRAC removal projects happen in a completely empty room. More often, the units coming out are adjacent to racks that are still live, sharing airflow, power distribution and containment with equipment that cannot go down during the project. Sequencing matters here. Understanding which units are providing redundant cooling capacity, which are on a shared chilled-water loop with equipment that must stay online, and how temporary cooling capacity might need to be staged before a unit comes offline are all part of planning a removal that does not put an operator’s live environment at risk.
This is where clear communication with facility engineering staff pays off. Before mobilization, it helps to understand the room’s current cooling redundancy, whether the units being removed are being replaced in place or eliminated as part of a broader capacity reduction, and what temperature and humidity thresholds the space needs to maintain throughout the work. A project scoped around these operational realities moves faster and creates far less risk than one that treats the removal as a straightforward demolition task.
Asset Recovery and Recycling Potential
Not every CRAC or CRAH unit reaching the end of its service life in a given facility is scrap. Depending on age, condition, completeness and market demand, components such as compressors, blower motors, coils and control packages may retain resale or reuse value, particularly for facilities maintaining older Liebert, STULZ or Uniflair fleets that still rely on compatible replacement components. Copper coils, aluminum housings and steel cabinetry also carry recyclable commodity value once a unit is no longer viable for reuse. As part of a removal project, we evaluate what can reasonably be recovered, resold or recycled and what needs to be processed as scrap, which can help offset a portion of the overall removal cost. We do not promise that every unit has resale value, and the right disposition path depends heavily on the specific equipment and its condition, but identifying that potential before demolition begins is part of a responsible removal plan.
Coordinating With Facility Systems and Other Trades
CRAC removal rarely happens in isolation. On larger data center and colocation projects, the work often has to coordinate with building automation system integrators, electrical contractors handling permanent disconnects, fire suppression contractors if detection or suppression heads are tied to the mechanical room, and general contractors managing a broader retrofit or capacity upgrade. Establishing a clear sequence — who disconnects what, in what order, and what documentation is required before demolition begins — keeps a multi-trade project moving without conflicts or rework.
For facilities operating under specific uptime or SLA commitments, this coordination becomes even more important. Confirming isolation points, verifying that redundant systems are truly redundant rather than assumed to be, and walking the space with facility staff before cutting anything loose all reduce the chance of an unplanned outage during a removal project.

Local Considerations for the Sacramento Market
McClellan Park is a large industrial and office park located just off Interstate 80
and has become one of the region’s notable concentrations of purpose-built data center capacity, alongside colocation and enterprise facilities spread across Rancho Cordova, Folsom, West Sacramento and the broader Sacramento metro. Many of these facilities occupy converted industrial or office buildings as well as ground-up construction, which means CRAC removal projects in this market cover a wide range of building conditions — from modern facilities with generous service corridors to older buildings where getting a unit out means working around load limits, tighter doorways and less forgiving loading dock access.
Sacramento’s role as a state government hub also means the region supports a range of institutional and public-sector server rooms and data closets outside the commercial colocation market, many of which are approaching equipment age where precision cooling replacement becomes necessary. USA Decom provides CRAC and CRAH removal services throughout Sacramento and into nearby markets including Rancho Cordova, Folsom, Elk Grove, Roseville, Davis, West Sacramento and Stockton, working with facility teams on projects ranging from a handful of server-room units to full data hall cooling system removals.
How a Project Like This Typically Concludes
Back at the Rancho Cordova colocation site, a project of this type generally follows a consistent sequence: refrigerant recovery from each DX unit, electrical and condensate disconnection coordinated around the live sections of the room, careful raised-floor protection during rigging, and disassembly of each cabinet into sections that can move through the facility’s existing access points without disturbing neighboring racks. Recoverable components get set aside for evaluation, and the balance of each unit is processed for recycling. The room is left clean and ready for new cooling equipment to move in, with the adjacent live racks never losing conditioned airflow throughout the process. That is the outcome we aim for on every CRAC removal project — old equipment out, new capacity ready to go in, and no disruption to the systems that had to keep running the whole time.
Tell Us About Your Project
If your facility has CRAC or CRAH units that need to come out — whether it’s a handful of aging Liebert or STULZ units in a server room or a full row of precision cooling equipment in a Sacramento-area data hall — use the form below to tell our team about the facility, the equipment involved, the room’s current operating conditions and your target schedule. Include details such as unit manufacturer and size where known, whether the space needs to stay partially live during removal, and any access constraints like raised flooring, tight corridors or limited loading dock hours. That information helps us put together a removal plan built around your specific site rather than a generic approach.