Precision Cooling Equipment Doesn’t Come Out the Way It Went In
A CRAC or CRAH unit that’s been running for ten or fifteen years inside an Oakland data center, telecom room or corporate IT closet was almost certainly rigged into place before walls, raised floors, ductwork and adjacent equipment were built around it. Pulling it back out rarely follows the same path.
Whether the project is a full white space teardown, a colocation suite turnover, or the replacement of a handful of aging perimeter units with newer in-row cooling, removing precision cooling equipment involves more coordination than most facility teams expect the first time they scope it. Refrigerant has to come out before the cabinet does. Chilled water piping and condensate lines need to be isolated and drained. Electrical disconnects have to be verified and locked out. And the unit itself — often several hundred pounds of steel, coils and compressors — has to move through a building that wasn’t necessarily designed with equipment removal in mind.
USA Decom provides CRAC and CRAH removal services to facility managers, data center operators, IT infrastructure teams and property owners throughout the Oakland market. If you’re planning to remove CRAC units, CRAH units or related precision cooling equipment from a facility in Oakland or the surrounding East Bay, here’s what our team typically looks at, and what helps us evaluate your project quickly.
CRAC, CRAH and the Terminology That Actually Matters
Not all precision cooling equipment is built or removed the same way, and the distinction affects scope more than most people expect.
- CRAC (Computer Room Air Conditioner): A direct-expansion (DX) system with its own refrigerant circuit, typically tied to a remote condenser or condensing unit.
- CRAH (Computer Room Air Handler): Cools using chilled water supplied from a central plant rather than refrigerant, which changes the disconnection sequence significantly — piping and valves instead of refrigerant lines.
- Perimeter cooling: Floor-mounted units positioned around the edge of the data hall, often in upflow or downflow configurations tied into a raised floor plenum.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- In-row cooling: Units positioned directly within server rows, generally smaller footprint but often more tightly integrated with containment and busway above.
Before we quote a removal project, we want to know which of these we’re dealing with, because a DX CRAC removal and a chilled-water CRAH removal are genuinely different jobs from a disconnection and sequencing standpoint.
Precision Cooling Systems We Commonly Encounter
Oakland and the broader Bay Area have a long history of telecom central offices, colocation build-outs, corporate data centers and enterprise server rooms, many of which were outfitted over multiple technology refresh cycles. That means a single facility can have several generations of precision cooling equipment side by side. Systems we typically see and are prepared to evaluate for removal include:
- Vertiv/Liebert DS, DSE, CW, PDX and PCW units, along with older Liebert Deluxe and Challenger-series systems still running in legacy rooms
- STULZ CyberAir units, including CyberAir DX and CyberAir CW configurations, as well as CyberRow in-row systems
- Schneider Electric/APC and Uniflair equipment, including InRow RC and RD units and NetworkAIR systems
- Data Aire precision units in smaller server rooms and telecom spaces
Capacities on units we remove commonly range from roughly 5-ton wall-mounted or small-room systems up to 20, 30 or 40-ton floor-mounted CRAC and CRAH units serving larger data halls, with some legacy or central systems sized higher. Dual-circuit DX CRAC systems are commonly built in capacities ranging from roughly 6 to 30 tons, which is one reason a single data hall removal project can involve moving several hundred combined tons of cooling capacity out of the building.
Why These Projects Get Complicated Fast

A CRAC removal looks straightforward on paper — disconnect it, unbolt it, move it out. In practice, several factors tend to drive complexity:
Refrigerant handling. DX-based CRAC units contain a refrigerant charge that has to be properly recovered before the unit can be disconnected and moved. Under EPA regulations governing refrigerant management, recovery requirements apply to appliances of all sizes — a small wall-mounted DX unit is subject to the same basic recovery obligation as a much larger system, and this step needs to be built into the project plan rather than handled as an afterthought.
Piping and electrical isolation. Chilled-water CRAH units require coordinated valve isolation and line draining, often in coordination with the building’s central plant operator. DX units require condenser or condensing unit disconnection, which may involve rooftop or exterior work in addition to the interior teardown.
Active facility conditions. Very few CRAC removal projects happen in an empty building. Most involve working around live racks, adjacent cooling units still in service, active fire suppression and building management systems, and IT staff who need continued access to the space throughout the project.
Access and rigging. Downtown Oakland office towers, converted industrial buildings in Jack London Square and West Oakland, and suburban office parks along the I-880 corridor all present different loading dock, freight elevator and floor-loading conditions. A unit that came in through a ground-floor bay during original construction may need to go out through a completely different path once racks, walls or ductwork have been added.
How a Typical CRAC Removal Project Sequences
Most projects we evaluate follow a similar general sequence, adjusted for the specific facility:
- Site walk and scope confirmation — verifying unit types, quantities, capacities, and how each is connected to power, piping or refrigerant lines.
- Shutdown coordination — working with facility or IT staff to schedule the outage window, confirm which units can go offline and when, and coordinate with any remaining active cooling.
- Isolation and lockout — electrical disconnects verified and locked out, chilled water valves closed and lines drained, or refrigerant recovered from DX circuits.
- Disassembly and rigging — panels, coils and compressor sections separated as needed for the available path out of the space, with rigging planned around doorways, elevators and floor openings.
- Loadout and transportation — moving equipment to the dock or exterior staging area and onto trucks for its next destination.
- Site restoration — patching floor penetrations, capping abandoned piping or conduit, and leaving the space in the condition required by the landlord, buyer or next occupant.
Access Conditions Around the Oakland Market
Facility layouts around the East Bay vary enough that access planning is almost always project-specific:
- Older commercial buildings near downtown Oakland and Jack London Square often have narrower freight elevators and tighter dock access than newer suburban facilities
- Converted warehouse and industrial space, common throughout West Oakland and along the Port of Oakland corridor, can offer better ground-level access but sometimes lacks modern loading infrastructure
- Suburban office and light-industrial parks along I-880 and I-580 toward Emeryville, San Leandro and Hayward tend to have more flexible dock and drive-in access
- Multi-tenant buildings may require coordinated after-hours or weekend work windows to avoid disrupting neighboring tenants
Understanding which of these conditions applies to your building early in the process helps determine crew size, rigging equipment and the realistic project timeline.
Asset Recovery and Disposition
Not every CRAC or CRAH unit coming out of a facility is scrap. Depending on age, condition, completeness and current secondary-market demand, some units may have resale or reuse value, particularly newer units removed during upgrades rather than end-of-life replacements. Compressors, coils, copper and aluminum components also carry recyclable value even on units too old or damaged for resale.
USA Decom evaluates each unit’s condition, manufacturer, capacity and configuration as part of scoping a removal project, and factors recoverable value into the overall project approach where applicable. We can’t guarantee that every unit has resale value or that recovered value will offset the full cost of a project, but identifying viable recovery opportunities before equipment is scrapped is part of how we approach these jobs.
Refrigerant recovery has to be documented as part of the disposal process for DX equipment, regardless of unit size or age, and this is a step that should be accounted for in the schedule and cost of the project rather than treated as an afterthought.

Projects in Action
Precision cooling removal work in the Bay Area often comes up in a handful of recurring situations: a colocation tenant vacating a suite ahead of lease turnover, an enterprise IT department consolidating server rooms into a smaller footprint after a cloud migration, or a facility team replacing a bank of aging perimeter CRAC units with newer, more efficient in-row cooling.
On a project of this type, our team typically starts by confirming which units are DX and which run on chilled water, since that determines whether the first step is refrigerant recovery or valve isolation and line draining. From there, disconnection and rigging get planned around whatever path is actually available — which, in an occupied building, is rarely the same path the equipment came in on. Units are broken down into manageable sections where necessary, moved through the building on the agreed schedule, and staged for loadout without disrupting adjacent operations still running in the space. Units in usable condition are set aside for evaluation, while damaged or obsolete equipment is processed for recycling once refrigerant has been recovered and documented.
That general sequence — confirm system type, coordinate the outage, isolate and disconnect, rig and remove, evaluate for recovery, restore the space — applies whether the job involves two wall-mounted units in a small server room or a dozen floor-mounted CRAH units across a full data hall.
What Helps Us Scope Your Project Quickly
Before requesting a quote, it helps to have a general sense of the following. You don’t need every detail finalized — this simply speeds up our review:
- Type of units involved (CRAC/DX vs. CRAH/chilled water, perimeter vs. in-row)
- Manufacturer and model if known (Liebert, STULZ, APC/Uniflair, Data Aire, or others)
- Approximate quantity and tonnage of the units
- Whether units are currently operating, partially decommissioned, or already offline
- Building address and general access conditions (loading dock, elevator, stairs-only, etc.)
- Floor level and distance from the units to the nearest exterior loadout point
- Target schedule, including any lease turnover, shutdown or move-out deadline
- Photos of the units, nameplates and access route, if available
This information lets our team put together a realistic scope and schedule before a site visit, rather than guessing at conditions we haven’t seen.
Serving Oakland and the Surrounding East Bay
USA Decom provides CRAC and CRAH removal services throughout Oakland and nearby communities, including Berkeley, Emeryville, Alameda, San Leandro, Hayward and Richmond, as well as facilities across the broader Bay Area extending toward San Francisco and San Jose. Whether your project is a single server room in a downtown office building or a full data hall teardown in an East Bay industrial park, we approach the scope the same way — understand the equipment, plan the disconnection and access, and move the project forward without unnecessary downtime.
Tell Us About Your Project
If you have CRAC units, CRAH units or related precision cooling equipment that need to come out of a facility in Oakland or elsewhere in the East Bay, use the form below to tell our team about the building, the equipment involved and your target schedule. The more detail you can share — unit types, quantities, access conditions and timing — the faster we can put together a project review.