Data centers and server rooms across the Los Angeles basin are constantly cycling through closure, consolidation, relocation and modernization. A colocation suite in a converted office tower downtown reaches the end of a lease. A corporate data hall in the South Bay gets absorbed into a larger regional facility. An aging server room inside a media, aerospace or logistics building gets gutted for a tenant improvement project. In nearly every one of these scenarios, the precision cooling equipment lining the perimeter of the white space or sitting in the hot aisle has to come out before the space can be turned over, redeveloped or repurposed.
USA Decom removes computer room air conditioning (CRAC) and computer room air handling (CRAH) units from data centers, telecom rooms, network operations centers and other critical environments throughout Los Angeles and the surrounding region. This work sits apart from general HVAC or central-plant removal. Precision cooling equipment is purpose-built for tight temperature and humidity tolerances, often ties into raised-floor air distribution, and frequently carries refrigerant, glycol or chilled-water connections that require coordinated disconnection before a unit can safely be rigged out of a data hall.
Why CRAC and CRAH Removal Comes Up in Los Angeles Facilities
Los Angeles has one of the more established data center markets on the West Coast, anchored by legacy carrier hotel buildings downtown — such as One Wilshire and 600 West Seventh Street — and expanding into newer purpose-built facilities in the South Bay and San Gabriel Valley. Much of the downtown inventory was originally built out inside converted office towers rather than ground-up data center shells, since these buildings weren’t designed with the floor loading, ceiling height or mechanical infrastructure that dense server rows require. That legacy has practical consequences for equipment removal today: older downtown facilities often have narrower freight elevators, lower floor-to-floor heights, and mechanical rooms that were never designed for large-unit rigging.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
At the same time, the market has been expanding outward, with growing data center activity in Los Angeles-area communities such as Vernon, Monterey Park and El Segundo as development pushes operators beyond the traditional downtown core. Facilities in these markets tend to be newer, single-story or low-rise structures with more direct dock and crane access, which generally simplifies the logistics of removing large precision cooling units compared to a high-rise downtown environment.
Regardless of vintage or location, the underlying reasons a facility needs CRAC or CRAH removal are fairly consistent: a lease is expiring and the space must be returned to base building condition, a colocation or enterprise data center is consolidating into a different facility, aging DX units are being replaced with more efficient chilled-water or in-row systems, or an entire building is being repositioned for a different use. Each of these situations puts precision cooling equipment removal on the project critical path.
What Precision Cooling Removal Actually Involves

CRAC and CRAH units are not simple through-the-wall air conditioners. A typical unit in the 5-ton to 30-ton range — and larger units well above 40 tons in bigger data halls — includes a cabinet housing fans, coils, filters and controls, along with piped or ducted connections that run beneath a raised floor or overhead through the ceiling plenum. Direct-expansion (DX) units have refrigerant piping running to an outdoor condenser or condensing unit, while chilled-water CRAH units connect into the facility’s chilled-water loop with supply and return piping, isolation valves and often a secondary containment pan. Either configuration requires the mechanical connections to be properly isolated and drained before the cabinet can be disconnected and moved.
Electrical disconnection is equally important. Precision cooling units are typically hardwired to dedicated circuits, and many are integrated with building management or environmental monitoring systems that need to be decommissioned in the correct sequence so that other equipment still operating in the space isn’t affected. On projects where only part of a data hall is being decommissioned — a partial floor consolidation, for example — this sequencing becomes more involved, since some units may need to stay in service while adjacent units are removed.
Refrigerant handling deserves specific attention on DX-based units. Under EPA’s refrigerant management requirements, technicians are prohibited from intentionally venting ozone-depleting refrigerants and their substitutes, including HFCs, during the maintenance, servicing, repair or disposal of air conditioning and refrigeration equipment. In practical terms, this means refrigerant charge in a DX-type CRAC unit generally needs to be properly recovered as part of the disconnection process, with appropriate documentation, before the unit is decommissioned or moved offsite. This applies whether the unit uses an older refrigerant blend or a newer lower-GWP alternative that has become more common in recent-generation precision cooling equipment.
Equipment Commonly Found in Los Angeles Data Halls
Los Angeles data centers and server rooms span decades of build-outs, so the mix of precision cooling equipment we encounter varies significantly by facility age and design. Older downtown suites and network rooms often still run legacy Liebert perimeter units — upflow or downflow configurations feeding a raised floor — while newer builds and recent retrofits are more likely to include Vertiv/Liebert DS, DSE or PDX platforms, STULZ CyberAir units in DX or chilled-water configurations, or Schneider Electric/APC and legacy Uniflair InRow systems positioned directly in the hot aisle rather than around the perimeter.
Each configuration comes with its own removal considerations. Perimeter downflow units tied into a raised floor plenum need the floor tiles and any underfloor cabling or containment cleared before the unit itself can be disconnected and rolled out. In-row units are more compact but are often physically integrated with rack rows and containment panels, so removal has to be coordinated with whatever is happening to the surrounding cabinets and aisle containment. Chilled-water CRAH units generally require more piping work to isolate but eliminate the refrigerant recovery step altogether, which can simplify that portion of the project.
Access, Rigging and Working in Active Facilities
Getting a CRAC or CRAH unit out of a data hall is rarely as simple as unbolting it and rolling it to a loading dock. Many Los Angeles facilities — particularly the converted office buildings downtown — present real access constraints: undersized freight elevators, tight corridors, low ceiling clearances, and mechanical penetrations that were engineered for the original office use rather than heavy cooling equipment. A 20-ton or 30-ton unit can weigh well over a thousand pounds once piping, refrigerant and structural framing are accounted for, and moving that weight through a building not designed for it takes careful route planning before any disconnection work begins.
On projects where the surrounding data hall or portions of the facility remain live, sequencing becomes a central planning issue. Cooling redundancy has to be evaluated so that removing one unit doesn’t compromise environmental conditions for equipment still operating nearby. This often means staging the work unit by unit, coordinating temporary cooling if needed, and keeping close communication with facility operations staff and any other trades working in the space at the same time. Fire suppression systems, raised-floor grounding, and building automation tie-ins also frequently need to be addressed as part of a clean disconnection.
Where a unit is beyond simple carry-out — located on a mezzanine, behind other equipment, or requiring disassembly to fit through an access path — rigging plans typically call for partial disassembly of the cabinet, protection of surrounding finishes and equipment, and use of appropriate lifting or moving equipment sized to the space. Rooftop condensing units associated with DX systems add another layer, since crane or hoist access at height has to be planned around building setbacks, parapet conditions and, in many parts of Los Angeles, proximity to adjacent structures.
Asset Recovery and Disposition
Precision cooling units that are still functional, reasonably current in design, and complete with their major components can sometimes carry resale or reuse value, particularly newer DS/DSE, CyberAir 3 or Uniflair InRow platforms that were removed for consolidation or upgrade reasons rather than failure. Age, condition, completeness, refrigerant type and current demand for a particular model family all factor into whether a given unit is a realistic resale candidate versus a recycling or scrap candidate. Units that have reached end of practical service life, or that used older refrigerant blends that are becoming harder to service, are more often routed toward responsible recycling, with copper, aluminum and steel components recovered and refrigerant handled according to applicable recovery requirements.
We evaluate each unit’s condition and configuration as part of project planning rather than assuming every piece of equipment has resale value. On larger projects involving a full data hall or multiple rooms, this evaluation can identify units worth pulling for resale separately from units headed straight to recycling, which can help offset a portion of the overall removal cost even though it isn’t a guaranteed outcome on every project.
Coordinating with Facility Owners, IT and Engineering Teams

CRAC and CRAH removal rarely happens in isolation. It typically overlaps with IT decommissioning, rack and cabling removal, electrical disconnection of PDUs and busway, and sometimes structural or raised-floor work tied to the broader space turnover. Property owners handling a lease exit need the mechanical footprint documented and the space returned to whatever condition the lease requires, which may include capping piping, patching floor penetrations, and removing associated condensate lines or containment curbs. Facility engineering teams managing an internal consolidation or upgrade need cooling capacity taken offline in a sequence that protects the equipment staying in service. Getting alignment on these requirements early — before disconnection work starts — avoids rework and keeps the schedule intact.
Real-World Project Examples
Projects of this type commonly start with a walkthrough to document the number and type of units, their piping and electrical connections, current operating status, and the physical access path from the mechanical or data hall space to the loading area. From there, a sequence is developed that accounts for which units can come offline immediately and which need to stay running until other work is complete. On a recent-generation chilled-water CRAH removal, that sequence generally includes isolating and draining piping, disconnecting and removing the cabinet, and capping the piping stubs for the base building contractor. On a DX-based removal, refrigerant recovery is built into the schedule before any rigging begins. In facilities with raised floors, floor tile removal and underfloor cable management are coordinated with the mechanical disconnection so the space is left clean and ready for the next phase of the project, whether that’s a new build-out, demolition, or a different tenant’s improvements.
Serving Los Angeles and the Surrounding Region
USA Decom provides CRAC and CRAH removal services for data centers, colocation facilities, network operations centers and enterprise server rooms throughout Los Angeles, including downtown, the South Bay, San Gabriel Valley and San Fernando Valley submarkets. We also provide these services to facilities in nearby markets such as El Segundo, Vernon, Monterey Park, Long Beach, Burbank, Glendale, Irvine and the broader Inland Empire, recognizing that many operators managing California portfolios have facilities spread across several of these communities rather than a single site.
Tell Us About Your Project
If you’re planning a data center closure, consolidation, relocation or upgrade in the Los Angeles area, use the form below to tell our team about the facility, the precision cooling equipment involved, and your target schedule. Useful details include the type and approximate size of the units (DX or chilled-water, and tonnage if known), how many units are involved, whether the facility or surrounding space is still operational, any known access constraints such as elevator size or floor loading, and whether there’s a shutdown or lease turnover deadline driving the timeline. Photographs of the units and the access path are also helpful. Sharing this information up front lets us put together an accurate scope and sequence for your specific facility.