Precision cooling equipment rarely comes out of a data hall the way it went in. A Liebert DS unit that was rigged through a loading dock and rolled into place a decade ago now has refrigerant charge, chilled-water or condenser piping, dedicated electrical feeds, and BMS/controls wiring tying it into the rest of the mechanical plant. Pulling that unit — or a row of them — without a plan built around the facility’s actual operating status is how projects run into shutdown surprises, code compliance gaps and damaged floor systems. USA Decom works with facility operators, data center managers, colocation providers and decommissioning contractors in Long Beach on the removal of CRAC and CRAH units, in-row and perimeter cooling systems, and related precision-cooling infrastructure.
This page focuses specifically on precision cooling equipment used to condition data halls, server rooms, telecom facilities and other critical environments — not central chiller plants or conventional building HVAC. If your project also involves a central chiller or cooling tower, that is a related but separate scope, and it’s worth telling us about both pieces so we can evaluate the full project together.
Why CRAC and CRAH Removal Projects Are More Complicated Than They Look
A CRAC or CRAH unit looks like a large, self-contained cabinet, but the complexity of removing one is rarely in the cabinet itself — it’s in everything connected to it. Depending on the system type, a unit may have:
- A DX refrigerant circuit with a compressor and remote condenser, requiring refrigerant recovery before any line is opened
- Chilled-water supply and return piping with isolation valves that may or may not actually hold once closed
- Three-phase power feeds, often on dedicated breakers tied into critical or UPS-backed distribution
- Humidification, condensate and drain connections
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- BMS, DDC or manufacturer-specific control wiring (Liebert iCOM, STULZ C7000/C3000, or similar) linking the unit to a broader monitoring platform
- A raised-floor or slab-mounted footprint with anchoring, floor cutouts, or underfloor ductwork that has to be addressed once the unit is gone
None of that is unusual for a facility that has been running for years. It does mean that a CRAC removal project needs to be scoped as a mechanical, electrical and structural project — not just a rigging job.
Active Facility Conditions Drive the Sequencing
CRAC removal projects generally fall into one of two categories: a full data center or server room decommissioning where every unit comes out, or a partial removal where some units stay in service while others are decommissioned. The second scenario is by far the more demanding one to plan.
When neighboring units, racks or IT loads remain live, the project has to account for:
- Maintaining adequate cooling redundancy for equipment that stays online while units are removed
- Coordinating shutdown windows with facility operations, IT, and building engineering staff
- Isolating electrical circuits and chilled-water branches without affecting circuits serving equipment that stays in service
- Managing airflow and containment changes as units are pulled — removing a perimeter CRAC from an active row can change hot-aisle/cold-aisle dynamics for the racks around it
- Sequencing so that redundant (N+1 or 2N) cooling configurations aren’t inadvertently reduced below a safe margin mid-project
Before mobilizing, our team works through what’s actually running, what’s already decommissioned, and what the facility’s tolerance is for temporary cooling reduction. That planning step is what keeps a partial removal from becoming a disruption to the operation that’s staying in business.
Refrigerant Handling and Utility Disconnection

DX-based CRAC units — including many Liebert DS, Deluxe, and CRV models, and STULZ CyberAir DX systems — operate on a sealed refrigerant circuit. Under EPA Section 608, refrigerant must be recovered from an HVAC appliance before it is disposed of, scrapped or recycled, regardless of unit size or refrigerant charge. Refrigerant recovery has to happen before any line, coil or compressor connection is opened for removal, and that applies whether the unit still holds a full charge or has been leaking for years.
Chilled-water CRAH units carry a different set of disconnection requirements — glycol or water drain-down, valve isolation, and confirming that isolation valves actually hold before piping is cut. On older systems, valves that haven’t been cycled in years sometimes don’t seat properly, which is why our approach typically includes verifying isolation rather than assuming a valve position on a drawing still reflects field conditions.
Electrical disconnection has its own sequencing requirements. Units fed from UPS-backed or generator-backed distribution need to be de-energized and locked out in coordination with facility electricians or an electrical contractor, particularly where a CRAC unit shares a panel or transfer switch with equipment that remains in service. We coordinate this scope with the facility’s engineering staff or electrical trade rather than treating disconnection as an assumption.
Rigging, Access and Floor Considerations
CRAC and CRAH units range from smaller in-row and perimeter systems in the 5- to 10-ton class up through larger downflow units in the 20-, 25-, 30-ton and higher range, with some legacy and large-frame systems well beyond that. Weight, footprint and access conditions vary considerably across that range, and access is frequently the deciding factor in how a removal is planned.
Many Long Beach data centers, telecom rooms and server environments occupy converted industrial, office or mixed-use buildings rather than purpose-built facilities, which means loading docks, freight elevators, corridor widths and door openings weren’t always designed around mechanical equipment of this size. Raised-floor environments add another layer: units are often anchored to the slab beneath the floor system, tied into underfloor ductwork, or positioned in a way that requires floor tile removal and temporary decking to move equipment out safely. Where a unit sits several floors up or in a space with tight freight access, rigging plans need to account for disassembly of the cabinet into sections that can actually clear the building’s access path.
Our team evaluates rigging paths, floor loading, elevator or hoist capacity, and disassembly requirements as part of scope development — before a crew shows up expecting a straightforward roll-out.
Asset Recovery, Resale and Recycling Potential
Not every decommissioned CRAC unit is scrap. Depending on manufacturer, model, age, condition and completeness, precision cooling equipment from brands like Vertiv/Liebert, STULZ, Schneider Electric/APC/Uniflair and Data Aire can have secondary-market value — either for resale as functioning equipment, for parts recovery, or for component and refrigerant reclamation. A unit that’s been well maintained and recently serviced is a different asset than one that’s been offline and stripped of parts for years, and that condition assessment factors into how a project is scoped.
Where equipment does have recoverable value, factoring that into the project can help offset a portion of removal costs. Where it doesn’t — units with obsolete refrigerants, corroded coils, or extensive prior parts removal — the more practical path is typically recycling of the metal, copper and other recoverable materials, along with proper refrigerant reclamation. We evaluate this on a unit-by-unit or lot basis rather than assuming every system in a room has the same disposition path.
Scope Development: What We Need to Know
Because CRAC and CRAH removal projects vary so much based on system type, quantity, and building conditions, the most useful first step is a clear picture of what’s actually in the space. Helpful information includes:
- Manufacturer and model (Liebert DS/DSE/CW/PDX/CRV, STULZ CyberAir 3/CyberRow/CyberOne, APC/Uniflair InRow RC or RD, Data Aire, or similar)
- Cooling type — DX/refrigerant-based or chilled-water — and approximate tonnage
- Quantity of units and whether they’re perimeter, in-row, or a mix
- Current operating status: fully decommissioned, partially live, or still supporting active load
- Floor type (raised floor vs. slab) and known anchoring or underfloor connections
- Building access conditions: floor level, loading dock, freight elevator, corridor and doorway dimensions
- Target schedule, including any lease expiration, facility shutdown date, or landlord turnover deadline
- Photographs of the units, nameplates, and the access path when available
That information lets us put together a realistic scope and sequencing plan rather than a generic estimate.
Working in the Long Beach Market

Long Beach sits at the center of one of the busiest port and logistics complexes in the country, and that industrial base shapes the mix of facilities in the area — distribution centers, manufacturing and light-industrial buildings, aerospace and marine-adjacent operations, and a growing base of technology, biomedical and professional-services tenants that occupy converted commercial and industrial space. Server rooms, telecom closets and small-to-midsize data environments supporting these operations are frequently tucked into buildings that were never designed around mechanical equipment removal, which makes access planning particularly relevant here.
USA Decom provides CRAC and precision-cooling removal services in Long Beach and the surrounding Los Angeles and Orange County markets, including Signal Hill, Lakewood, Carson, Compton, Torrance, Cerritos, and the broader South Bay and Gateway Cities areas. Facilities in these communities share similar building stock and access constraints, so the same planning approach applies whether the project is a single server room or a multi-unit data hall.
Coordinating With Your Broader Project Team
CRAC removal rarely happens in isolation. It’s typically one piece of a larger data center decommissioning, IT equipment removal, or facility closure project, and it often needs to be coordinated with electricians, mechanical contractors, IT decommissioning teams, and building management or landlord requirements for turnover condition. We work alongside those other parties rather than assuming our scope covers every adjacent trade, and we’ll ask early in the process who else is involved so the sequencing lines up.
Tell Us About Your Project
If you’re planning the removal of CRAC or CRAH units, in-row cooling systems, or a broader precision-cooling teardown in Long Beach, use the form below to tell our team about the facility, the equipment involved, and your target schedule. Useful details include the manufacturer and model of the units, whether they’re DX or chilled-water systems, current operating status, access conditions, and any shutdown or turnover deadlines you’re working against. Photographs of the equipment and the access path help us evaluate the project more accurately before we discuss scope and next steps.