A precision cooling system rarely gets decommissioned on its own timeline. It happens because a lease is turning over, a colocation suite is being reconfigured, a legacy data hall is being modernized with newer cooling architecture, or a company is consolidating operations and vacating a facility that once ran its own on-site server room. In Irving, where Las Colinas has developed into one of the more established corporate and technology corridors in North Texas, these projects come up regularly as older raised-floor computer rooms and legacy data halls give way to newer infrastructure, redevelopment, or relocation. Whatever triggers the project, the CRAC and CRAH units sitting on that raised floor or mezzanine represent real removal complexity — refrigerant circuits, chilled-water piping, electrical disconnects, and equipment that was often installed before the surrounding building was finished around it.
USA Decom works with facility managers, IT infrastructure teams, general contractors, and property owners who need precision cooling equipment removed safely, in the correct sequence, and without disrupting adjacent operations that may still be live. This page walks through what a CRAC removal project in the Irving market typically involves, from early planning through final turnover.
Why CRAC Removal Projects Come Up in the Irving Market
Irving’s technology footprint didn’t happen by accident. The city sits inside the Dallas-Fort Worth metroplex with direct access to DFW International Airport, and Las Colinas has developed into one of the region’s more established corporate and technology office markets over the past several decades. That corporate density has historically meant a substantial number of on-premises server rooms, data closets, and smaller enterprise data halls built out as part of the surrounding office space — many of them cooled with legacy Liebert or early-generation precision air units that are now reaching the end of practical service life or being replaced as part of a broader infrastructure refresh.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
The market has also seen larger-scale change, with data center and colocation development continuing to move into the Las Colinas area alongside its existing corporate office base. Projects like these tend to generate two kinds of precision-cooling work: new installation as facilities expand or convert to data center use, and legacy CRAC/CRAH removal on older, previously built-out space as facilities get repositioned, downsized, or fully vacated. Smaller enterprise IT rooms throughout Irving’s office corridors, along with facilities near the DFW Airport submarket and area business parks, generate similar removal needs outside the largest campus projects.
What CRAC Removal Actually Involves
A computer room air conditioner or air handler is not simply unplugged and carted out. Whether the equipment on site is a Liebert DS, PDX, or CW downflow unit, an older Challenger or Deluxe-series system, a STULZ CyberAir CRAC or CyberAir CW air handler, or an APC/Uniflair InRow unit, each one is tied into the building through several independent systems: electrical power (often on dedicated circuits or panels), condensate drainage, humidification supply, building management or DDC controls, and either a refrigerant circuit (DX units) or chilled-water supply and return piping (CRAH units). Before anything is disconnected, someone has to understand how that specific unit connects into the facility, what else depends on it, and what sequence keeps the rest of the space operating safely during removal.
That planning stage is where a decommissioning project actually starts. Our team typically works from a facility walkthrough or client-provided documentation to identify the make, model, capacity, and configuration of every unit — downflow or upflow, perimeter or in-row, DX or chilled water — along with approximate tonnage, which commonly runs from small 5-ton or 10-ton in-row units up through 20-, 30-, and 40-ton perimeter systems in larger legacy rooms. That information determines electrical disconnection requirements, refrigerant handling needs, rigging approach, and how many units can realistically be removed within a given shutdown window.

Shutdown Coordination and Working Around Live Operations
Many CRAC removal projects in Irving don’t happen in an empty building. A colocation suite may have tenants still operating on adjacent racks. An enterprise server room may be running production systems that can’t tolerate an extended cooling outage. A manufacturing facility may have a smaller IT closet nested inside an otherwise active plant. In each case, the removal sequence has to be built around what stays operational and what doesn’t.
This usually means identifying redundant units that can be taken offline first while remaining cooling capacity covers the active load, confirming isolation points with the facility’s electrical and mechanical systems before any disconnection begins, and coordinating with building engineering or a client’s MEP contractor on breaker lockout, chilled-water valve isolation, and BMS point removal. On projects involving chilled-water CRAH units tied into a central plant, isolation has to account for the rest of the loop — closing and blanking valves correctly so the remaining system stays balanced and leak-free once a unit is physically removed.
Refrigerant Recovery and Regulatory Requirements
Direct-expansion CRAC units contain a sealed refrigerant circuit, and that refrigerant has to be recovered before the unit can be disconnected, moved, or scrapped. EPA regulations under Section 608 of the Clean Air Act govern the servicing and disposal of refrigeration and air-conditioning equipment, and refrigerant generally must be recovered from that equipment before final disposal. The final party in the disposal chain, such as a scrap metal recycler, is typically responsible for ensuring refrigerant has been properly recovered before equipment reaches that stage — which is why documentation matters throughout the removal process.
In practice, this means older R-22 systems and newer R-410A or R-407C units both require proper recovery before any compressor, coil, or line set is disturbed. Legacy Liebert units in particular may still carry R-22 charges, which changes the disposition path for the recovered refrigerant compared to newer HFC blends. Documentation of what was recovered, from which unit, and how it was handled is part of a properly executed removal — not an afterthought. Chilled-water CRAH units don’t carry a refrigerant charge on the room-side unit itself, which is one reason facility teams sometimes prefer that configuration in larger data halls, but they still require correct piping isolation, drain-down, and glycol handling where applicable.
Rigging, Access, and Physical Removal

Precision cooling units are heavy, awkwardly shaped, and frequently installed in locations that weren’t designed with removal in mind. A downflow CRAC unit set into a raised floor cutout has ductwork and floor tiles built around it. An in-row unit is wedged between server cabinets in a hot aisle containment system with inches of clearance on either side. A rooftop or mechanical mezzanine unit may require a hoist, a freight elevator with a defined weight limit, or a controlled path through a loading dock that wasn’t sized for this kind of equipment.
Before removal begins, our team evaluates:
- Building access routes, including elevator dimensions and weight capacity, dock height, and any raised-floor or ramp limitations between the equipment location and the loading area
- Floor loading and structural considerations where units are staged temporarily prior to loadout
Removal itself typically involves disconnecting and capping electrical and mechanical connections, disassembling the unit into manageable sections where full removal isn’t practical, and rigging each component out of the space without damaging surrounding infrastructure that’s staying in service — raised floor tile, containment panels, cable trays, or adjacent racks that remain live.
Asset Recovery, Resale, and Recycling
Not every decommissioned CRAC unit belongs in a scrap yard. Precision cooling equipment holds a genuine secondary market, particularly units from established manufacturers like Vertiv/Liebert and STULZ that are still within a reasonable service life and haven’t suffered water or fire damage. Compressors, EC fans, humidifiers, and control boards can retain value even when a full unit isn’t a candidate for resale as a complete system. Age, completeness, refrigerant type, and general condition all factor into whether a unit is more suited to resale, component recovery, or straight recycling of the steel cabinet, copper coils, and aluminum components.
Where equipment is beyond reasonable resale but still contains recoverable metal content, that material moves through appropriate recycling channels rather than general demolition debris. On a legacy room being fully cleared out, this disposition planning can meaningfully affect the overall cost of the project, since recoverable value from usable units and scrap materials may offset a portion of removal and disposal expense — though the extent of any offset depends entirely on the age, condition, and quantity of the specific equipment involved.
From the Field: A Legacy Data Hall Consolidation
A project of this type often starts with a facility operator consolidating IT infrastructure out of an aging on-premises data hall and into colocation or cloud environments, leaving a room full of legacy precision cooling equipment behind. On similar projects, our team typically begins with a walkthrough to catalog every unit by manufacturer, model, and connection type, followed by a phased shutdown plan that keeps redundant capacity online for as long as active equipment remains in the space.
From there, the sequence generally follows electrical and mechanical isolation of the first units scheduled for removal, refrigerant recovery on DX equipment, disconnection and capping of chilled-water piping where CRAH units are present, and rigging of each unit out through the most practical building access route — often a freight elevator or loading dock rather than the original installation path, since that access may no longer exist once surroun
Use the form below to tell our team about your project or equipment.