Precision cooling units don’t come out of a data hall the way a window AC unit comes out of an office wall. A CRAC or CRAH cabinet is plumbed, wired, sometimes charged with refrigerant, and often bolted into a raised floor system that has to stay intact for whatever comes next in the space. When a facility in the Inland Empire is retiring cooling infrastructure — whether it’s a single legacy unit in a server room or a full bank of perimeter coolers in a larger data hall — the removal itself is usually more involved than the initial quote request suggests.
USA Decom removes CRAC and CRAH units, in-row cooling systems, and associated precision-cooling infrastructure from data centers, colocation facilities, telecom rooms and industrial control environments throughout the Inland Empire. This page walks through what’s typically involved, what affects cost and schedule, and what our team needs to know before we can put together an accurate scope.
Why Inland Empire Facilities Are Retiring CRAC and CRAH Units
The Inland Empire’s role as a major logistics and distribution hub — supported by proximity to Southern California’s ports, an extensive rail and interstate highway network, and access to a large regional labor force — has driven decades of warehouse, manufacturing and distribution development across the region. That growth has pulled a wide range of supporting infrastructure into the area, including corporate offices, distribution management systems, telecom points of presence and enterprise IT rooms tied to the warehousing and manufacturing operations that anchor the local economy. Many of these facilities were built or retrofitted with dedicated CRAC or CRAH cooling years ago, and that equipment is now reaching the point where it’s being replaced, consolidated or removed outright.
Common triggers we see for CRAC removal in this market include:
- A tenant improvement or lease turnover requiring a server room or data hall to be returned to shell condition
- Migration of IT infrastructure to a colocation provider or the cloud, leaving on-premise cooling stranded
- Refresh projects replacing older DX units with newer chilled-water or in-row systems
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Consolidation of multiple smaller server rooms into a single, more efficient space
- Facility closures, relocations or repurposing where the cooling infrastructure has no further use
- End-of-life equipment being replaced due to refrigerant type, efficiency or reliability concerns
Whatever the reason, the removal work follows a similar pattern regardless of building type, and getting that sequence right protects the schedule and the surrounding facility.
CRAC vs. CRAH: Why the Distinction Matters for Removal

The type of unit being removed changes the scope significantly.
- CRAC (Computer Room Air Conditioner) units are typically DX (direct expansion) systems with their own integral refrigerant circuit, meaning removal involves refrigerant recovery and disconnection of refrigerant piping to an outdoor condenser or condensing unit, in addition to electrical and condensate disconnection.
- CRAH (Computer Room Air Handler) units are chilled-water systems tied into a building or facility chilled-water loop, so removal centers on isolating and draining chilled-water piping rather than handling refrigerant, plus disconnecting controls and electrical.
Facilities in the Inland Empire often have a mix of both, particularly where a data hall was expanded or upgraded over time. Before scoping a job, our team identifies which units are DX and which are chilled-water, since that determines whether refrigerant recovery needs to be coordinated as part of the shutdown sequence.
Equipment We Commonly Encounter
The Inland Empire’s data centers, telecom rooms and enterprise IT spaces include precision cooling from a range of manufacturers, including:
- Vertiv / Liebert — including Liebert DS, DSE, CW and PDX platforms, along with legacy Liebert Challenger and Deluxe systems still running in older server rooms
- STULZ — CyberAir CW and DX platforms, CyberRow in-row units, and CyberOne compact systems used in smaller mission-critical spaces
- Schneider Electric / APC, including legacy Uniflair — Uniflair and Uniflair InRow units, along with APC InRow RC and RD systems and NetworkAIR platforms
- Data Aire precision cooling systems, common in telecom and smaller enterprise rooms
Units in this category typically range from around 5-ton server-room systems up through 20- to 30-ton perimeter units, with larger data halls sometimes running 40-ton or larger chilled-water CRAH systems. Legacy nameplates don’t always match current corporate branding — a unit stamped “Liebert” may be catalogued today under Vertiv, and older Uniflair equipment may still carry that name even in a facility now managed under the APC/Schneider Electric brand. We work from whatever nameplate information is on the unit rather than assuming a match to current product lines.
What Removal Actually Involves
A typical CRAC or CRAH removal moves through several stages:
1. Shutdown and isolation coordination. Before any disconnection begins, the unit needs to be de-energized and isolated from its circuit, and — for chilled-water units — the associated piping loop needs to be valved off or drained. This step has to be coordinated with facility staff or the building engineer, particularly if other equipment shares the same electrical panel or chilled-water loop.
2. Refrigerant recovery, where applicable. DX units still holding a refrigerant charge require recovery in accordance with applicable EPA refrigerant-handling requirements before piping can be cut or disconnected. This step is planned into the schedule up front rather than discovered mid-teardown.
3. Piping and electrical disconnection. Refrigerant lines, chilled-water piping, condensate lines, control wiring and power feeds are disconnected and capped or removed back to the source, depending on whether the space is being returned to a specific turnover condition.
4. Disassembly and rigging. Larger CRAC and CRAH cabinets don’t move through a standard doorway in one piece. Depending on the model and access conditions, the fan section, coil section and cabinet may need to be separated for movement, particularly in raised-floor environments or upper-floor data halls with limited elevator or hallway clearance.
5. Floor and space restoration. Raised floor tiles, floor stands and any structural supports installed for the unit are typically addressed as part of the scope, especially on tenant turnover projects where the space needs to be handed back in a defined condition.
6. Loadout, recycling and disposition. Once removed, units are broken down for transport and directed toward resale, recycling or scrap disposition depending on age, condition and market demand.
Access and Working Conditions in Active Facilities
CRAC removal work in the Inland Empire often takes place in facilities that remain operational — a warehouse with an active office and server room, a manufacturing plant with a control room, or a multi-tenant building where other suites are occupied. That changes how the work gets planned:
- Raised-floor data halls require careful tile handling and load path planning so cabinets can be rolled or rigged out without damaging surrounding infrastructure
- Loading dock access, freight elevator dimensions and hallway clearances often dictate how much a unit needs to be disassembled before it can leave the building
- Work may need to happen during off-hours or scheduled maintenance windows if adjacent IT equipment remains live
- Noise, dust control and short-notice access restrictions are common in occupied buildings and get built into the sequencing
Our team walks through these conditions with the facility contact before finalizing a scope, since access constraints are one of the biggest variables in both cost and schedule for this type of work.

Asset Recovery Potential
Not every retired CRAC unit is scrap. Depending on age, condition, completeness and current secondary-market demand, components such as compressors, fan assemblies, control boards and even complete units in good condition can have resale or reuse value. Copper piping, aluminum coil material and steel cabinetry also carry recyclable commodity value once a unit is fully broken down. We evaluate each removal for potential resale or salvage value before defaulting to scrap, and recovered value can help offset a portion of the overall removal cost — though not every unit will have meaningful resale demand, and we don’t guarantee a specific recovery value before inspecting the equipment.
Regional Considerations for the Inland Empire Market
A significant share of the Inland Empire’s leased industrial space is occupied by manufacturers, distributors and logistics operators, which means server rooms and IT closets are frequently tucked into corporate office space attached to a much larger warehouse or distribution footprint. That layout affects removal planning in practical ways — freight access is often built for pallets and forklifts rather than IT equipment, and the office or server room portion of the building may have narrower doorways, lower ceiling clearances and less direct dock access than the warehouse space around it.
We provide CRAC and CRAH removal services throughout the Inland Empire, including Ontario, Riverside, San Bernardino, Fontana, Rancho Cucamonga, Chino, Redlands, Corona and the broader logistics and manufacturing corridor along the I-10 and I-15 freeway system, as well as surrounding communities extending toward the high desert markets of Victorville and Hesperia.
What to Gather Before Requesting a Quote
Having the following information ready helps us put together an accurate scope faster:
- Manufacturer, model and approximate tonnage of each unit (nameplate photos help)
- Whether units are DX/refrigerant-based (CRAC) or chilled-water (CRAH)
- Number of units and their location within the facility
- Whether units are still powered/operational or already shut down
- Raised floor construction and approximate floor height, if applicable
- Building access details — loading dock, freight elevator, hallway or stairwell clearances
- Whether the space needs to be restored to a specific turnover or lease-return condition
- Target removal timeline, including any lease, shutdown or tenant improvement deadlines
- Any known refrigerant type or service history that may be relevant
Tell Us About Your Project
If your facility has CRAC or CRAH units, in-row cooling, or other precision cooling equipment that needs to come out, use the form below to tell our team about the building, the units involved and your timeline. Photos of the equipment and nameplates are especially useful and help us give you a more accurate picture of scope, schedule and recovery potential before we get into the details of your project.