CRAC Removal Services in Bakersfield, California

A regional healthcare provider’s data center once reached the point where its raised-floor server room needed a full mechanical refresh. The facility had run on a set of downflow computer room air conditioners for more than a decade, and the units were nearing the end of their practical service life around the same time the IT team was migrating workloads to a new cooling architecture. Before any new equipment could go in, the old CRAC units had to come out — refrigerant recovered, piping and electrical disconnected, roof-mounted condenser sets disconnected, and everything moved off a raised floor that was never designed for easy equipment egress. That kind of project illustrates most of the practical issues involved in CRAC removal work, and it’s the type of scope our team is prepared to evaluate for facilities throughout the Bakersfield area.

Why Bakersfield Facilities Need CRAC Removal

Bakersfield sits at the center of Kern County’s energy, agriculture and logistics economy, and that mix supports a base of server rooms, network operations centers and small-to-midsize data halls tied to oil and gas operations, healthcare systems, distribution operations and public agencies throughout the southern San Joaquin Valley. Many of these spaces were built out using precision cooling equipment sized for the IT load in place at the time. As equipment refreshes, consolidations, colocation moves and facility closures occur, the CRAC or CRAH units installed during that original build may need to come out — whether because the space is being repurposed, the mechanical system is being modernized, or the facility itself is closing.

Precision cooling equipment is distinct from a building’s general HVAC system. A CRAC unit is designed to maintain tight temperature and humidity tolerances for a data hall or telecom room, typically pulling return air from the top or bottom of the space and pushing conditioned air through a raised floor plenum or overhead ductwork. Because these units are purpose-built for continuous, precise operation, removing them involves more coordination than pulling a rooftop package unit off a commercial building.

Understanding the Equipment We Remove

Server rooms and smaller data centers, in Bakersfield as elsewhere, often rely on direct-expansion (DX) or chilled-water CRAC and CRAH units from manufacturers such as Vertiv/Liebert, STULZ and Schneider Electric/APC, including legacy Uniflair-branded systems. Liebert DS and DSE downflow units, STULZ CyberAir and CyberRow platforms, and APC InRow RC or RD units are all found in mission-critical spaces of this type, along with older Liebert Challenger and Deluxe-series units still running in facilities that haven’t been fully modernized. These units generally range from roughly 5 to 10 tons for smaller network rooms up to 20, 30 or 50-plus tons for larger data hall installations. Facilities that have changed hands or gone through multiple IT refreshes sometimes have a mixed fleet on site — a newer Liebert or STULZ unit alongside an older Data Aire or legacy Uniflair cabinet installed by a previous tenant. Identifying manufacturer, model and approximate age up front helps determine whether a unit still carries resale interest or should simply be scheduled for recycling.

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

The distinction between DX and chilled-water configurations matters for removal planning. A DX unit has its own refrigerant circuit and typically ties to an outdoor condenser or condensing unit, meaning refrigerant recovery is a required step before any disconnection work begins. A chilled-water CRAH, by contrast, ties into the building’s chilled-water piping and doesn’t carry refrigerant on board, but it does require careful draining and isolation of the water loop to avoid leaks onto a raised floor or into occupied space below. Row-based or in-row cooling units add another layer of complexity because they’re frequently integrated directly into server rack rows and containment systems, so removal has to be sequenced around whatever IT equipment remains active nearby.

Refrigerant Recovery and Regulatory Considerations

For any DX-based CRAC unit, refrigerant recovery is a required first step before the unit can be disconnected and removed. Recovery and disposal of refrigerant from this type of equipment falls under federal requirements administered by the EPA’s refrigerant management program, and depending on the equipment and project conditions, additional recordkeeping or handling requirements may apply. Refrigerant recovery on projects like this is typically performed by certified technicians as part of the overall sequence, and coordinating that step early keeps it from becoming a bottleneck once mechanical disconnection is ready to proceed. Getting this piece right matters both for compliance with applicable requirements and for keeping the broader removal schedule on track, since refrigerant recovery generally has to happen before piping can be cut and before the indoor unit can be unbolted and moved.

Disconnection, Rigging and Access Planning

Once refrigerant and fluid systems are isolated, the physical removal work begins. CRAC and CRAH units are heavy, often several hundred to well over a thousand pounds depending on size and configuration, and they’re usually installed in locations that weren’t designed with future removal in mind — tucked against a wall on a raised floor, positioned in a tight mechanical alcove, or stacked in a row with limited clearance on either side. Our team maps out the disconnection sequence for power, control wiring, condensate piping, refrigerant lines and any building management system tie-ins before touching the unit itself, then plans the physical extraction path.

Raised-floor environments present a particular access challenge. Floor tiles have to be removed and often reinforced or protected during equipment movement, and the unit typically has to be walked, skated or lifted onto a floor jack before it can travel toward a freight elevator, loading dock or exterior door. In facilities where the server room sits on an upper floor or in a space without a direct path to grade, rigging plans may call for disassembly of the cabinet into smaller sections, use of a floor crane or gantry, or coordination through a freight elevator with a defined weight capacity. Roof-mounted condensers tied to DX units require their own access plan, since crane service or a rooftop hoist is often the only practical way to bring that equipment down safely.

Working in an active facility adds another layer of planning. Many CRAC removal projects happen in spaces where adjacent racks, rooms or building systems remain in service, which means work zones, temporary cooling coverage and communication with facility staff all need to be worked out before demolition begins. A phased removal plan — taking out redundant or already-idle units first while maintaining cooling capacity for equipment still in production — is a reasonable approach on projects where the space isn’t being fully decommissioned all at once.

Asset Recovery and Equipment Disposition

Not every retired CRAC unit is scrap. Depending on age, condition, manufacturer, capacity and completeness, some units — along with major components such as compressors, condensers and control boards — may retain resale or reuse value in the secondary precision-cooling market. Copper piping, aluminum and steel cabinet material, and electrical components also carry recyclable commodity value once separated from the unit. Our team evaluates each piece of equipment coming out of a project to identify what can reasonably be resold, reused or recycled versus what should be scrapped, and that evaluation can help offset a portion of the overall removal cost. We don’t promise a resale outcome or a specific value on any individual unit, but the assessment is part of how we approach every removal project rather than an afterthought.

Planning the Scope Before Work Begins

Before a crew shows up on site, it helps to understand a few basic facts about the project: how many CRAC or CRAH units are involved, their approximate capacity and manufacturer, whether they’re DX or chilled-water systems, whether the space will remain partially operational during the work, and what the target completion date looks like. Facilities working against a lease turnover date, a colocation exit deadline, or a broader facility closure timeline should factor refrigerant recovery lead time and rigging logistics into that schedule early, since both can affect how quickly equipment can actually leave the building.

A few details are especially useful to have ready before requesting a scope review:

  • Manufacturer and model of each CRAC or CRAH unit, where known
  • Approximate tonnage or cooling capacity
  • DX or chilled-water configuration
  • Floor location, access route and any elevator or dock weight limits
  • Whether adjacent equipment or rack rows need to stay operational during removal
  • Target completion date, including any lease, shutdown or turnover deadline

Coordinating With Other Trades and Stakeholders

CRAC removal rarely happens in isolation. Electrical disconnects typically require coordination with an electrician or the facility’s electrical contractor, chilled-water isolation may involve the building’s mechanical contractor or engineer of record, and any raised-floor or structural work may need sign-off from a facilities or property management team. On projects tied to a broader white-space decommissioning or facility closure, our team works alongside IT decommissioning vendors, general contractors and property stakeholders to sequence the mechanical removal appropriately within the larger project timeline.

Project Spotlight: CRAC Removal in a Live Data Center

Returning to the healthcare data center project referenced earlier, the sequence played out over a coordinated multi-day effort. Refrigerant was recovered and documented from each DX unit before any piping was cut, and the roof-mounted condensers came down using a rented boom crane staged in the facility’s parking area. Inside, floor tiles were pulled and protected in sections as each CRAC cabinet was walked to a freight corridor and out to a loading dock, with one still-active unit left running until the new cooling system was ready to take over the load. Retired compressors and usable control components were separated out for resale evaluation, while cabinet steel and copper piping were segregated for recycling. The raised floor was restored to a clean, ready-to-build condition ahead of the new mechanical installation — the kind of turnover condition most facility teams need before the next phase of work can start. This type of sequencing reflects our general approach to CRAC removal projects, adapted to the access conditions and shutdown requirements of each individual site.

Serving Bakersfield and the Southern San Joaquin Valley

USA Decom provides CRAC and CRAH removal services throughout Bakersfield and the surrounding Kern County region, including facilities in Delano, Wasco, Shafter, Taft, Arvin, Tehachapi and the broader southern San Joaquin Valley. Whether the project involves a single server room refresh or a larger data hall decommissioning tied to a facility closure or relocation, our team can evaluate the scope and put together a removal plan suited to the site conditions.

Tell Us About Your Project

If your facility has CRAC or CRAH units that need to come out — whether as part of a full data center decommissioning, a mechanical system upgrade, or a facility closure — use the form below to tell our team about the equipment, its approximate capacity and manufacturer, the site’s access conditions, and your target schedule. That information helps us put together an accurate scope and next steps for your Bakersfield-area project.