Cooling Tower Removal and Decommissioning in Waco, Texas

Cooling towers rarely fail all at once. More often, a facility manager in Waco notices rising maintenance costs, a shrinking supply of replacement parts for an older Marley or Baltimore Aircoil unit, or a production line that has been re-piped around a tower nobody uses anymore. Eventually the tower becomes a liability sitting on a rooftop, a mechanical yard, or a concrete pad — taking up space, holding water, and creating a corrosion and slip hazard that outweighs any remaining service life.

USA Decom removes and decommissions industrial, commercial and rooftop cooling towers throughout the Waco area. Whether the project involves a single-cell package tower on a manufacturing building or a multi-cell field-erected structure serving a process plant, we handle the disconnection, dismantling, rigging, loadout and disposition of the tower and its associated components.

Why Waco Facilities Are Removing Cooling Towers

Waco and the surrounding Central Texas region support a mix of manufacturing, food and beverage production, industrial equipment fabrication and distribution operations, and much of that infrastructure relies on evaporative cooling to support process water, HVAC or refrigeration loads. As plants upgrade equipment, consolidate operations, or transition to air-cooled or closed-loop systems, older open-circuit towers can become obsolete before the rest of the mechanical plant.

Common triggers for a cooling tower removal project in this market include:

  • Replacing an aging tower with a smaller, more efficient factory-assembled unit
  • Consolidating multiple cooling loops after a production line shutdown
  • Clearing rooftop or yard space ahead of a facility renovation or tenant turnover
  • Removing a tower that has been abandoned in place after a chiller plant or process change

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

  • Preparing a property for sale, lease or redevelopment where an idle tower affects roof loading or site inspection

As industrial and distribution activity along the I-35 corridor between Dallas-Fort Worth and Austin continues to bring facility upgrades and reconfigurations to the region, cooling tower removal is a service USA Decom expects to see demand for as mechanical systems age or get replaced across the market.

What Cooling Tower Removal Actually Involves

A cooling tower looks simple from the outside, but the removal scope usually touches several trades and systems. Depending on the tower type, a typical project may include:

  • Isolating and draining condenser water piping and disconnecting supply/return lines
  • De-energizing and disconnecting fan motors, VFDs and control wiring
  • Removing gear drives, driveshafts, fan blades and fan cylinders
  • Extracting fill media, drift eliminators and inlet louvers
  • Cutting and removing basin pans, casing panels and structural framing
  • Dismantling support steel, platforms, ladders and access structures
  • Rigging and crane picks for rooftop or elevated units
  • Segregating steel, stainless components, motors, gearboxes and copper/aluminum for recycling
  • Site cleanup, cap-off of piping stubs, and structural patching where required

Package towers such as an SPX Marley NC-Class or a Baltimore Aircoil Series 3000 unit are typically removed as a largely intact shell once internals are stripped, while field-erected towers with wood or FRP structural components generally require more extensive on-site dismantling before pieces can be rigged out. Either way, the mechanical, structural and electrical disconnects need to be sequenced correctly so the facility’s remaining cooling and process systems aren’t disrupted during the work.

Rooftop Tower Removal: A Different Set of Problems

A significant portion of cooling tower removal work involves units sitting on rooftops rather than at grade, and rooftop work introduces its own logistics. Before mobilizing, our team looks closely at:

  • Crane access and pick radius. Rooftop towers usually come down in sections by crane, which means confirming boom clearance, setup location, ground bearing capacity for outriggers, and any overhead obstructions such as power lines or adjacent structures.
  • Roof structural capacity. Cutting and staging tower components on an active roof deck requires knowing the roof’s load rating, especially on older buildings not originally designed with a tower’s operating weight in mind.
  • Roof membrane protection. Dismantling generates debris, dropped fasteners and occasional fluid from basins and piping. Protecting the roof surface during demolition avoids creating a new leak problem after the tower is gone.
  • Fall protection and access. Parapet height, roof hatch location and the absence of permanent guardrails around the tower curb all affect how the crew stages and executes the work safely.

Field-erected towers present a related but different challenge — instead of one lift, the project may involve dismantling structural bays, cross-bracing, fan decks and casing in a planned sequence, particularly on multi-cell units where one cell may need to stay operational while an adjacent cell is removed.

Equipment and Manufacturers We Commonly Encounter

Waco-area facilities operate cooling towers from a range of manufacturers, and our crews are familiar with the construction differences that affect a removal plan:

  • SPX Cooling Technologies / Marley — NC-Class and NC Everest crossflow towers, MD and MD Everest counterflow models, and older field-erected AV and AquaTower systems
  • BAC (Baltimore Aircoil Company) — Series 3000, Series 1500, PT2 and FXT/FXV closed-circuit fluid coolers, along with legacy Series V units still in service on older plants
  • EVAPCO — AT and UT/UAT counterflow towers and LSTE closed-circuit units, both factory-assembled and, on larger installations, field-erected configurations

We also remove towers from other manufacturers including Recold, Ceramic Cooling Tower, Tower Tech and Delta Cooling Towers, along with legacy or relabeled units where nameplate information may no longer match a currently marketed product line. Whatever the brand, the removal scope is driven more by tower type — crossflow versus counterflow, induced draft versus forced draft, open-circuit versus closed-circuit — and by size, ranging from a 100-ton package unit to a 1,000-ton-plus multi-cell installation, than by manufacturer alone.

Asset Recovery Before Demolition

Not every component of a decommissioned tower belongs in a scrap bin. Before cutting into a tower, it’s worth identifying what might have resale, reuse or recycling value:

  • Fan motors and gear drives in working condition, particularly larger horsepower units
  • VFDs and control panels that were recently replaced or upgraded
  • Stainless steel basins, casing panels and structural components
  • Copper and aluminum piping, coils and wiring
  • Complete towers or major sections in good condition that may have resale value to a buyer needing a replacement unit rather than new equipment

Recoverable value depends heavily on the manufacturer, model, age, condition, completeness and the current secondary market for that type of equipment, so not every tower yields meaningful recovery. Where recovery is realistic, factoring it into the project plan can help offset a portion of the overall removal cost. Our team looks at this during scope development so the disposition plan — resale, reuse, recycling or straight scrap — is set before demolition begins rather than decided in the field.

Working Around an Active Facility

Most cooling tower removals happen while the rest of the plant keeps running. That changes how the project gets sequenced. Typical coordination points include:

  • Scheduling piping isolation and cap-off around production shifts or seasonal cooling demand
  • Maintaining a clear separation between the demolition work zone and adjacent operations, foot traffic or vehicle routes
  • Coordinating crane setup and lift timing around loading dock activity, employee parking or other site traffic
  • Managing noise, dust and debris containment for tenants or neighboring businesses in shared industrial parks
  • Timing electrical disconnects with facility maintenance staff or the site’s electrical contractor

Facilities in shared industrial and business parks throughout the Waco area often have additional coordination requirements tied to shared utilities, access roads or property management rules. We build these constraints into the project schedule rather than treating them as complications discovered mid-project.

Example Project Details

A project of this type often starts with a facility replacing an original rooftop tower installed decades earlier with a smaller, higher-efficiency package unit. On similar work, our team typically isolates and drains the condenser water loop, disconnects the fan motor and controls, strips fill media and casing panels to reduce weight, then rigs the remaining shell off the roof by crane in sections sized to the available pick radius. Structural steel, stainless components and recoverable motors are segregated on-site for recycling or resale, and piping stubs are capped so the roof curb is ready for the new unit’s installation. A field-erected, multi-cell tower removal generally follows a similar arc but requires more time-intensive structural dismantling, particularly where wood or FRP framing components need to be cut down bay by bay rather than lifted as an assembled unit.

What to Gather Before Requesting a Quote

Because tower construction and site conditions vary so much, having a few details ready helps our team put together an accurate scope:

  • Tower manufacturer, model and approximate tonnage, if known
  • Tower type (crossflow, counterflow, open-circuit or closed-circuit) and number of cells
  • Location on-site: rooftop, grade-level pad, or elevated structure
  • Site access for crane or rigging equipment, including overhead obstructions
  • Current operational status — still running, idle, or already isolated
  • Nearby structures, tenants or operations that need to stay active during removal
  • Target completion window, including any tie to a replacement unit installation or lease/turnover deadline
  • Photographs of the tower, access route and surrounding area, if available

Nearby Markets We Serve

In addition to Waco, USA Decom provides cooling tower decommissioning and removal services throughout the surrounding Central Texas region, including Temple, Killeen, Belton, Hewitt, Robinson, McGregor and Marlin, along with facilities located near the I-35 corridor between Dallas-Fort Worth and Austin.

Start Your Cooling Tower Removal Project

If you’re planning to remove or decommission a cooling tower at a Waco-area facility, use the form below to tell our team about the tower’s manufacturer, size, location on-site and your target timeline. That information lets us put together a practical scope and next steps for your specific site and schedule.