Cooling towers rarely leave a facility on their own schedule. They come out because a plant is closing, a chiller plant is being modernized, a lease is turning over, or a manufacturing line has been idled and the heat-rejection equipment that once supported it no longer has a job to do. In Tyler, where a mix of energy-sector operations, manufacturing, healthcare campuses and light-industrial facilities rely on evaporative cooling for process and comfort loads, that moment eventually arrives for almost every mechanical cooling tower in service. USA Decom works with facility owners, plant managers, contractors and property groups across the Tyler market to plan and execute the removal of cooling towers ranging from small single-cell rooftop units to large multi-cell, field-erected systems.
This page focuses specifically on cooling tower decommissioning and removal — not chiller plant replacement, HVAC retrofits or general facility demolition. A cooling tower project has its own sequencing, rigging requirements and disposition considerations, and treating it as a distinct scope of work is usually what keeps a project on schedule and on budget.
Why Cooling Towers Come Out of Service
Tyler’s industrial base has roots in East Texas oil and gas activity, and that history still shapes the region’s energy-services, manufacturing, distribution and healthcare operations. Many of these facilities, along with manufacturing plants, hospitals and commercial campuses throughout Smith County, depend on cooling towers to reject heat from process systems, compressors and chilled-water plants.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
A cooling tower typically comes down for one of a handful of reasons. A plant may be permanently shutting down or consolidating operations into a smaller footprint, leaving the cooling tower along with other rooftop and yard equipment as part of a broader facility closure. A building owner may be replacing an aging tower with a smaller, more efficient factory-assembled unit and needs the old cell removed before the new one can be set. A property may be changing hands, with a buyer or new tenant requiring the roof or mechanical yard cleared as a condition of the deal. Or a facility may simply be modernizing its central plant, removing an oversized or obsolete tower that no longer matches current cooling loads.
Whatever the driver, the removal itself tends to follow a similar arc: assessment and planning, isolation and preparation, dismantling and rigging, loadout and disposition, and finally site restoration and turnover. Understanding that lifecycle helps a facility team anticipate what USA Decom will need to know and what to expect once the crew is on site.
Planning the Scope Before Work Begins
Before any tower comes apart, our team works to understand exactly what is out there. That starts with identifying the manufacturer, model family and configuration. Open-circuit induced-draft crossflow towers such as SPX Cooling Technologies’ Marley NC and NC Everest lines, closed-circuit and factory-assembled units from EVAPCO’s AT and UT series, and BAC’s Series 3000 and Series 1500 platforms are common across commercial and light-industrial facilities in this part of Texas, and each has different structural, mechanical and access characteristics that affect the removal plan. A single-cell rooftop unit rated around 100 to 250 tons dismantles very differently than a multi-cell, field-erected tower in the 750-ton-and-up range with structural steel support towers, internal catwalks and separate fan decks.
Scope development also means walking through the mechanical components that make up the tower: fans, motors, gear reducers or belt drives, fill media and drift eliminators, louvers, the cold-water basin, and any associated pumps, piping and controls tied into the condenser-water loop. Structural elements — steel casing, ladders, platforms, handrails and the support structure itself, whether it sits on a roof curb, at grade, or on an elevated steel frame — need to be accounted for as well, since these often represent a larger share of the removal effort than the mechanical components. On field-erected towers, this can include cellular fill decks, distribution basins and multiple fan cells that each need to be isolated and dismantled in sequence.
Before mobilization, we also want to understand the condition and history of the equipment, including whether it has been in continuous service, is currently idle, or has already been isolated from the condenser-water system. That information, combined with access conditions — rooftop versus grade-level, crane pick availability, elevator or hoist access, and clearance around adjacent equipment — shapes both the schedule and the rigging plan.

Rooftop Tower Removal Considerations
Rooftop cooling towers present a distinct set of logistical challenges that deserve specific attention, since a number of the towers serving Tyler’s commercial buildings, hospitals and mid-size industrial facilities sit above occupied or active space. Before any component comes apart, the roof structure itself needs to be evaluated for the loads involved in staging, cutting and rigging equipment, and a lift plan needs to identify where a crane can set up, what boom length and capacity are required to reach the tower, and how the roof surface, parapet walls and any overhead obstructions affect the pick.
Disassembly on a roof generally proceeds in a sequence that reduces weight and size before any section is lifted: fans, motors and drive components come off first, followed by fill media, drift eliminators and louvers, with the basin and structural casing broken down into sections that match the crane’s lift capacity and the available laydown area. Where a tower cannot be removed in large sections because of crane reach or roof access limitations, sections may need to be cut down further and moved to a staging area for final breakdown before loadout. Roof penetrations, curb connections and existing waterproofing also need to be addressed so the roof can be properly patched and sealed once the tower footprint is cleared — a detail that matters considerably to any facility owner planning to turn the roof over to a new tenant or buyer.
Field-Erected and Ground-Level Tower Removal
Larger process facilities, refineries and energy-sector operations in the Tyler area are more likely to have ground-level or field-erected towers supporting condenser water or process cooling loads. These systems are typically larger in scale, with multiple cells arranged along a shared basin, structural steel towers, and piping that ties into a broader utility or process system rather than a single rooftop chiller.
Removing a field-erected tower usually starts with isolating and draining the associated condenser-water piping, followed by disconnecting fans, motors, gearboxes and drive shafts at each cell. Fill media, eliminators and internal distribution systems are removed next, often requiring confined-space precautions given the basin depth and internal structure common to these towers. The structural steel frame — which may stand well above grade and require internal scaffolding or man-lift access — is typically dismantled cell by cell, with larger structural sections rigged out using mobile cranes positioned around the tower’s footprint. Coordinating this work around an active plant, adjacent process piping, and other operating equipment is often the most demanding part of the project, and it is where sequencing and communication with plant operations staff matter as much as the physical rigging plan.
Structural, Mechanical and Electrical Disconnection
Every cooling tower removal involves more than unbolting a fan deck. Condenser-water supply and return piping typically needs to be cut, capped or removed back to an isolation valve, and any associated pumps tied to that loop need to be evaluated as part of the broader scope. Electrical disconnection of fan motors, controls, level switches and any variable-frequency drives needs to be coordinated with facility electricians or the responsible contractor of record, since USA Decom’s role on a given project is defined by the specific scope agreed to for that job. Basin drains, makeup water connections and chemical treatment feed lines round out the utility tie-ins that typically need attention before final structural removal.
Where the tower sits on a dedicated structural steel support or a reinforced roof curb built specifically for that piece of equipment, the removal plan should also address what happens to that support structure — whether it is removed entirely, cut back to deck level, or left in place for a future replacement unit.

Asset Recovery and Material Disposition
Cooling towers contain a meaningful amount of recoverable material and, in some cases, reusable equipment. Motors, gear reducers, drive shafts and fan assemblies are sometimes suitable for resale or reuse depending on age, condition and manufacturer, particularly on towers that have been well maintained or recently serviced. Structural steel, galvanized casing panels and copper or brass fittings from the piping and basin systems typically carry scrap value, and separating these materials by type during dismantling — rather than sending everything to a single mixed-scrap load — generally improves the recovery value of the project.
PVC and fiberglass fill media, along with drift eliminators, generally carry little resale value but can typically be broken down and handled as recyclable bulk plastic rather than landfill waste, which keeps disposal volumes and costs down. Basin water, if still present at the time of removal, needs to be drained and managed appropriately, particularly on towers where biocides, corrosion inhibitors or other condenser-water treatment chemicals have been in use. On older towers — a real consideration in a market like Tyler where some cooling towers have been in service for decades — the assessment phase should also confirm whether gaskets, insulation or older transite-style panels are present, since materials of this age sometimes require special handling before mechanical dismantling proceeds.
Information to Gather Before Requesting a Quote
A more accurate scope and schedule usually come from having a few basic facts in hand before reaching out. It helps to know the tower’s manufacturer and model, if available from a nameplate or prior service records; the approximate tonnage and number of cells; whether the unit is rooftop, at grade, or a field-erected structure; the current operating status; and whether the condenser-water system has already been isolated. Photographs of the tower, its support structure and the surrounding access area — along with any known deadlines tied to a lease turnover, shutdown or construction schedule — allow our team to put together a more precise plan before a site visit ever takes place.
Cooling Tower Removal Across the Tyler Region
Beyond Tyler itself, USA Decom serves facility owners and plant operators throughout the surrounding East Texas market, including Longview, Kilgore, Jacksonville, Lufkin, Nacogdoches and Marshall. Many of these communities share Tyler’s mix of energy-sector, manufacturing, healthcare and light-industrial facilities, and cooling towers of similar age, size and configuration are common throughout the region.
Start Your Cooling Tower Removal Project
If a cooling tower at your Tyler-area facility needs to come out as part of a plant closure, chiller plant upgrade, property turnover or equipment replacement, use the form below to tell our team about the tower’s manufacturer and size, its location on the roof, at grade or as part of a field-erected system, current operating status, site access conditions, and your target schedule. That information lets USA Decom put together a removal plan suited to the actual equipment and site conditions rather than a generic estimate.