Cooling towers rarely fail or get replaced on a convenient schedule. A cell drops offline mid-summer, a fill media replacement turns into a full tower evaluation, or a facility upgrade leaves an old field-erected unit sitting next to a new one that has to be tied into the same condenser water loop. Whatever triggers the project, taking a cooling tower out of service safely — and getting it off the roof, the yard, or the mechanical pad without disrupting the rest of the plant — is a different problem than installing one.
USA Decom provides cooling tower decommissioning and removal services for industrial, healthcare, manufacturing and commercial facilities in Temple, Texas and throughout Central Texas. Whether the project involves a single rooftop unit, a multi-cell field-erected tower serving a process cooling loop, or a full condenser water system tie-out ahead of a chiller plant replacement, our team plans and executes the work around the constraints of the facility, not the other way around.
Why Temple Facilities Retire Cooling Towers
Temple sits at the crossroads of Interstate 35 and the developing Interstate 14 corridor, and the city’s industrial base reflects that logistics advantage, with manufacturing operations benefiting from convenient access to Union Pacific and BNSF rail service alongside the interstate network. Manufacturing, food and consumer products production, and distribution operations in the area rely on process cooling and HVAC systems that eventually reach the end of their service life, get consolidated during a plant upgrade, or become oversized or undersized as production changes.
Temple is also home to a significant healthcare and hospital campus presence, including facilities affiliated with Baylor Scott & White, which operate large central plants supporting patient care buildings around the clock. Hospital and institutional campuses of this size typically run redundant chiller and cooling tower systems, and retiring, right-sizing or replacing one cell or one tower structure without interrupting the rest of the plant requires careful sequencing.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Across these facility types, the reasons a cooling tower gets decommissioned are fairly consistent: the structure or basin has reached the end of its useful life, a chiller plant upgrade changes the tonnage requirement, a facility is consolidating cooling load onto fewer, more efficient cells, or a building is being repurposed and the rooftop or yard space is needed for something else. In each case, the removal project has to be planned around an operating facility, not a shutdown site.
What Makes Cooling Tower Removal Different From a Straightforward Teardown
A cooling tower is a fairly simple piece of equipment functionally, but it sits at the intersection of several project risks that don’t always show up in a routine demolition scope:
- Active condenser water systems. Most cooling towers being removed are tied into a condenser water loop that continues to serve other equipment. Isolating a single cell or tower without draining or contaminating the rest of the loop takes coordination with the facility’s mechanical staff, and the piping tie-in and cap-off work has to be sequenced correctly.
- Elevated and rooftop locations. A large share of cooling tower removal work in commercial and institutional buildings happens on a roof, penthouse, or elevated mechanical platform. That means rigging plans, crane picks, and material handling routes have to account for roof loading limits, parapet clearance, overhead obstructions and, in many cases, a building that remains fully occupied below.
- Field-erected structural steel. Larger process and industrial towers, particularly multi-cell field-erected units, are built on structural steel with basins, fan decks, and access platforms that were assembled in place. Taking that structure apart is closer to structural dismantling than equipment removal, and it typically requires cutting, torching, or unbolting steel in a sequence that keeps the remaining structure stable throughout the work.
- Heavy components at height. Gearboxes, motors, drive shafts, and fan assemblies are often the heaviest individual components on the tower, and they’re usually mounted at the top of the structure. Rigging these components down safely — rather than simply cutting a structure loose and dropping it — protects both the building below and the components themselves if they have resale value.
- Fill media, drift eliminators, and basin materials. PVC fill media, louvers, and drift eliminators are lightweight but bulky, and basins often hold sediment, biological growth, or treated water that needs to be handled and disposed of according to applicable project requirements before demolition begins.

Scope of Work: What Typically Comes Out
Every cooling tower removal project is a little different depending on whether the unit is a factory-assembled rooftop package or a field-erected industrial tower, but the scope generally covers:
- Condenser water piping disconnection, draining, and capping at the tie-in points
- Fan, motor, and gearbox or belt-drive removal, including drive shafts on larger induced-draft units
- Fill media, drift eliminators, and louver removal and disposal
- Basin, cold-water sump, and pan removal
- Structural steel dismantling for field-erected towers, including fan decks, access platforms, ladders, and cage systems
- Controls, VFDs, level switches, and associated electrical disconnects
- Crane picks and rigging for rooftop or elevated units where components can’t be lowered by hand or hoist
- Site or roof restoration to the condition required for the next phase of the project, whether that’s a new tower installation, a re-roof, or simple turnover
The manufacturers and product families most common in this equipment category include SPX/Marley NC and NC Everest crossflow towers, Marley AV and AquaTower induced-draft units, BAC Series 3000 and Series 1500 units, and EVAPCO AT and UT/UAT series towers, along with older field-erected systems that may not carry a visible nameplate at all. Knowing how a given tower family is typically constructed — where the structural connections are, how the fan deck is supported, how the fill is racked — helps our team plan the dismantling sequence before a single bolt comes out.
Rooftop Removal: Access, Rigging, and Building Protection
Rooftop cooling tower removal carries its own set of planning requirements that a ground-level industrial project doesn’t. Before mobilizing, our team typically needs to understand the roof structure’s load rating, the available crane setup positions and boom clearance, any overhead power lines or adjacent rooftop equipment, and whether the building below will remain occupied during the work.
Depending on tower size and roof access, removal may involve a rooftop crane pick with a ground-based crane reaching over the building, a smaller mobile crane or aerial lift staged on the roof itself, or, in constrained sites, a full disassembly into components small enough to move through a hatch, stairwell, or freight elevator. Each approach has different implications for schedule, cost, and how much of the work can happen without disturbing occupants or adjacent operations. Roof protection — plywood, mats, or dedicated rigging paths — is typically part of the plan regardless of which method is used, since the goal is to leave the roof membrane and surrounding equipment undamaged for whatever comes next.
Field-Erected and Industrial Tower Dismantling
Larger process and manufacturing facilities in the Temple area may run field-erected towers built directly on a structural steel or concrete basin foundation rather than a factory-packaged unit. These structures were typically assembled in place over a period of days or weeks, and taking them down safely means reversing that sequence in a controlled way rather than simply cutting the largest sections free.
Our approach generally starts with removing the mechanical equipment — fans, motors, gearboxes, and drive components — before addressing the structural steel, fill, and casing panels. This keeps the heaviest, highest-value components out of the way of the demolition work and reduces the risk of dropping a motor or gearbox during structural cutting. For multi-cell towers where only part of the structure is being removed, isolating the section coming down from the cells that remain in service is a critical planning step, both for the condenser water piping and for the structural integrity of the remaining cells.
Utility Isolation and Coordination With Facility Operations
Because most cooling towers connect into a live mechanical system, coordination with facility engineering or maintenance staff is one of the first steps on almost every project. That typically includes confirming isolation valve locations, verifying that the loop can be drained or bypassed without shutting down other equipment, and identifying electrical disconnects for fan motors, controls, and any associated chemical treatment or make-up water systems.
For hospital, healthcare, and other continuously operating facilities, this coordination step matters even more. A cooling tower removal that affects one chiller or one loop still has to account for redundancy requirements, infection control considerations near active patient areas, and scheduling around the facility’s own maintenance windows. Manufacturing and production facilities have a parallel version of the same issue: cooling towers often support process equipment that can’t tolerate an unplanned interruption, so isolation and tie-in work is usually scheduled around a planned outage or shift change rather than during normal production.
Asset Recovery and Disposition
Not every component coming off a retired cooling tower is scrap. Motors, gearboxes, drive shafts, and VFDs are often in usable condition even when the tower structure itself has reached the end of its service life, and depending on age, condition, and manufacturer, some of that equipment may have resale or reuse value. Structural steel, copper wiring, and other metals are typically segregated for recycling rather than sent to a landfill as mixed demolition debris.
We evaluate recoverable equipment and materials as part of the removal plan and factor that into project economics where it applies. This doesn’t mean every component has resale value or that recovered value will offset the full cost of the project, but identifying what’s worth pulling out intact — rather than cutting everything into scrap size on the way down — is part of doing the removal efficiently.

Site and Roof Restoration for Turnover
Once the tower, basin, and associated piping are out, most projects require some level of restoration before the space can be turned over for its next use. On a roof, that might mean patching curb penetrations, capping abandoned piping, and confirming the roof membrane is intact where the tower or its supports sat. On a ground-level industrial site, it may mean removing the concrete basin pad, backfilling, or grading the area to match the rest of the yard. If the removal is making way for a new tower installation, coordinating the old unit’s removal with the new equipment’s delivery and rigging schedule keeps the mechanical plant offline for the shortest practical window.
Serving Temple and the Surrounding Central Texas Region
USA Decom provides cooling tower decommissioning and removal services in Temple and across the broader Central Texas market, including Killeen, Belton, Waco, Round Rock, Georgetown, and the greater Fort Hood region. Facilities along the I-35 corridor between Austin and the Dallas–Fort Worth area often deal with similar mechanical plant ages, roof configurations, and production schedules, and our team applies the same planning approach — isolate the system, plan the rigging, protect the building, and recover what has value — regardless of which side of the metro the project is on.
Tell Us About Your Cooling Tower Project
If you’re planning to remove a rooftop unit, retire a field-erected tower, or clear out a mechanical yard ahead of a chiller plant upgrade, our team can review the project and put together an approach specific to your site. Use the form below to tell us about the facility type, tower size and configuration, roof or ground-level access, condenser water system status, and target schedule. Photos of the tower, nameplate, and surrounding access points help us evaluate the scope faster, and we’re glad to work from whatever information you have on hand to start the conversation.