Cooling Tower Removal in San Bernardino, California

An Aging Tower Rarely Sits at the Top of the Priority List — Until It Has To

Cooling towers tend to be one of the last things a facility team thinks about until a building is being sold, a lease is ending, a chiller plant is being replaced, or a manufacturing line is shutting down. By that point, the tower is usually decades old, sitting on a rooftop or a concrete pad behind the plant, and nobody on staff has touched the fill media or gearbox in years. Whether the driver is a facility closure, a plant consolidation, an equipment modernization project, or a straightforward lease turnover, that tower eventually has to come down, and it has to come down in a way that doesn’t create new problems for the property.

USA Decom provides cooling tower decommissioning and removal services to facility owners, plant managers, general contractors, and property teams across the San Bernardino market who need a cooling tower physically removed rather than simply diagnosed or repaired. Cooling tower removal is a distinct scope from chiller decommissioning — the tower is the heat-rejection component that sits outside the mechanical room, exposed to weather, wired into its own motor and controls, and often mounted in a location that was never designed with future removal in mind. Getting it out safely, on schedule, and without damaging the surrounding roof, structure, or active operations requires a plan built around the specific tower, not a generic demolition approach.

Why Cooling Towers Get Decommissioned

Most cooling tower removal projects trace back to one of a handful of business events. A manufacturing or distribution facility is closing or relocating and the tower needs to come out as part of full building turnover. A property is being redeveloped or repositioned for a new tenant with different mechanical requirements. A chiller plant upgrade eliminates the need for the existing open-loop or closed-circuit tower entirely. Or a tower has simply reached the end of its service life — corroded basins, deteriorated fill, a gearbox that’s no longer supportable — and ownership has decided replacement isn’t worth the investment given the facility’s future.

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

In each case, the tower represents both a liability and an opportunity. Left in place, an idle tower with standing water in the basin is a maintenance and water-quality concern, and a structural or rooftop load that has to be accounted for during any future renovation. Removed properly, the structural steel, fan and motor assembly, gearbox, and piping represent recoverable material and, in some cases, functioning components with resale value. Planning the removal early — rather than treating it as an afterthought during a broader demolition — generally produces a better outcome on schedule, cost and site condition.

What’s Actually Involved in Removing a Cooling Tower

A cooling tower isn’t a single object — it’s an assembly of separate systems that each require their own removal approach. The condenser-water piping connecting the tower to the building’s chiller plant has to be isolated, drained, and disconnected, often requiring coordination with the facility’s mechanical contractor or engineer of record if the piping ties into systems that remain in service elsewhere in the building. The fan, motor and gearbox sit at the top of the structure and typically represent the heaviest single lift in the project; on an induced-draft tower these components may be 15 to 20 feet or more above grade or roof level, which changes the rigging and access plan considerably.

Below the mechanical deck, the fill media and drift eliminators come out next. These components are lightweight but bulky, and depending on the tower’s service history and water treatment program, may show scale buildup or biological growth that affects how the material is handled and disposed of. The basin, louvers, casing panels, and structural frame follow, along with any platforms, ladders, and support steel that were part of the original installation. On field-erected towers, this structural disassembly is a considerably larger undertaking than on a factory-assembled package unit, since field-erected towers were often built in place using dimensional lumber, FRP, or steel components that were never intended to be lifted out as a single piece.

Rooftop Towers Present a Different Set of Problems Than Grade-Level Units

A large share of the commercial and light-industrial cooling towers in the Inland Empire sit on rooftops rather than at grade, and rooftop removal changes almost every part of the project. Crane picks have to account for building height, adjacent structures, power lines, and roof access points. The roof itself has to be protected from rigging loads, dropped hardware, and foot traffic during disassembly, and any roofing membrane penetrations created by the original piping and electrical runs need to be properly sealed as part of turnover. Rooftop projects also typically require closer coordination with building engineers or property management, since crane operations and roof access affect other tenants and rooftop equipment even when the tower itself is isolated to one area.

Grade-level and pad-mounted towers carry their own considerations — site access for cranes and trucks, proximity to active production areas, and coordination with ground-level utilities and piping runs that may cross through occupied space. Multi-cell installations, common on larger commercial and industrial systems, add sequencing complexity, since cells may need to be taken down in a specific order to maintain structural stability of the remaining sections and to manage crane positioning across the footprint.

The Equipment You’re Likely Dealing With

Most of the commercial and industrial cooling towers found in Southern California facilities were manufactured by one of a small number of major producers, and recognizing the type and configuration helps frame the removal scope early. SPX Cooling Technologies’ Marley NC line is common in HVAC and light industrial service, available in both factory-assembled and field-erected configurations, while the newer NC Everest series was designed to deliver meaningfully higher cooling capacity per cell than earlier NC models — a detail that matters when a facility is replacing an older, larger-footprint tower with a smaller unit rated for comparable duty.

Baltimore Aircoil’s Series 3000 towers are another frequently encountered platform, typically configured as induced-draft units in crossflow or counterflow design, with motor horsepower and air-handling capacity that scale substantially across the model range. Larger Series 3000 units are often manufactured and shipped in multiple sections to keep the heaviest single lift manageable during installation — a detail that generally works in reverse during teardown, allowing the tower to be broken down along its original section lines rather than cut apart in place.

EVAPCO’s AT and UAT series, common in factory-assembled induced-draft counterflow applications, are typically assembled from large sub-sections rather than shipped as a single unit, which is useful context when planning crane picks and disassembly sequencing for these towers. Whether a facility is running a Marley AV or MD Everest tower, a BAC FXT or Series 1500 unit, an EVAPCO UT or LSTE package, or an older field-erected system from a legacy manufacturer, the removal plan needs to reflect the tower’s actual construction rather than a one-size-fits-all demolition method.

Water Quality and Biological Considerations Before Teardown Begins

Cooling towers operate as open recirculating water systems, and idle or poorly maintained towers can develop conditions that affect how a removal project is staged. Before mobilizing crews to open up a basin or cut into fill sections, it’s worth confirming the tower’s operating and water-treatment history, since standing water and biological growth in an inactive system are treated differently than water in a unit that was actively maintained and treated up until shutdown. Facility teams should be prepared to discuss recent water treatment records and whether the tower was drained and secured, or left filled, after it was taken out of service. Applicable disposal and handling requirements can vary depending on the condition of the water and the material found in the basin.

Structural and Access Planning Before Mobilization

Before any equipment moves, we work through the specifics of the tower and the site: cell count and configuration, approximate tonnage, mounting location (roof, pad, mezzanine or platform), condition of the surrounding structure, crane access and staging area, power isolation points for the fan motor and controls, and the condenser water piping tie-in locations. On active facilities, sequencing also has to account for whether other building systems share utility runs, electrical panels, or structural supports with the tower being removed, and whether portions of the plant need to keep running throughout the project.

Floor and roof loading matter as much on the way down as they did on the way up. A tower that was craned into place decades ago as a single unit may need to come out in cut sections if crane access has since been restricted by new construction, added rooftop equipment, or changes to the surrounding property. Every one of these variables changes the crew size, equipment, and schedule required, which is why an accurate scope conversation upfront saves time once work begins.

Asset Recovery and Material Disposition

Not everything that comes off a cooling tower is scrap. Motors, gearboxes, and fan assemblies in serviceable condition may have resale or reuse value depending on manufacturer, size, and hours in service. Structural steel, aluminum and stainless components, and copper wiring represent recoverable commodity material, while FRP casing panels, fill media, and drift eliminators are generally handled as disposal or recycling material depending on condition and applicable local requirements. On field-erected towers with heavier structural steel content, the recoverable material volume is often more significant than on smaller factory-assembled package units.

We evaluate the tower’s condition, completeness, and components as part of scope development, and factor recoverable value into the overall project approach where it’s practical to do so. This doesn’t mean every component has resale value or that recovered material will offset the full cost of removal, but it does mean the disposition plan is built around getting reasonable value out of the material rather than treating the entire tower as scrap by default.

Projects in Action

Our experience with cooling tower removal includes manufacturing and distribution facilities transitioning out of a chilled-water process cooling system, commercial and institutional buildings replacing an aging rooftop package tower during a mechanical retrofit, and properties preparing for redevelopment where an idle field-erected tower needs to be fully cleared from the site. On a project of this kind, our approach typically starts with isolating the tower’s utilities and confirming piping tie-in points, then sequences the fan/motor/gearbox removal, fill and eliminator removal, and structural disassembly before final basin and support-steel removal and site restoration. Projects involving rooftop-mounted towers generally add a roof-protection and crane-logistics phase that a grade-level project wouldn’t require, while multi-cell field-erected installations add sequencing steps to manage the additional structural steel and larger footprint.

Serving San Bernardino and the Inland Empire

San Bernardino sits at the center of one of the largest logistics, warehousing, and manufacturing corridors in the country, with rail, air cargo, and interstate freight infrastructure along the I-10 and I-215 corridors supporting a dense concentration of distribution centers, cold storage facilities, manufacturing plants, and commercial buildings — many of which rely on chilled-water cooling systems tied to rooftop or grade-mounted cooling towers. As older industrial buildings throughout the region are repositioned, sold, or upgraded, and as manufacturing and processing facilities modernize their mechanical systems, cooling tower removal becomes part of that lifecycle.

USA Decom provides cooling tower decommissioning and removal services in San Bernardino and throughout the surrounding Inland Empire, including Rialto, Colton, Fontana, Redlands, Highland, Rancho Cucamonga, Ontario, and Riverside. Whether the project involves a single rooftop package unit on a commercial building or a multi-cell field-erected tower serving an industrial process system, the same core principles apply: understand the equipment, plan the isolation and access work, sequence the disassembly, and manage disposition of the recovered material responsibly.

Tell Us About Your Cooling Tower Project

If you’re planning a cooling tower removal in San Bernardino or anywhere in the Inland Empire, use the form below to share the details our team needs to evaluate the scope — facility type and location, tower manufacturer and configuration if known, approximate tonnage and cell count, mounting location (roof, pad or platform), current operating status, site access conditions, and your target schedule. Photographs of the tower, nameplate data, and surrounding structure are especially helpful. Whether you’re working against a lease turnover deadline, coordinating around an active facility, or planning ahead for a larger decommissioning project, tell us about the tower and we’ll help you think through what the removal will actually involve.