Cooling Tower Removal in Lubbock, Texas

A cooling tower rarely fails all at once. More often, a plant engineer or facilities manager starts noticing the signs over several seasons — fill media that no longer holds up under West Texas dust and hard water, a gearbox that needs rebuilding more often than it should, a basin that has been patched one too many times, or a tower that simply no longer matches the cooling load of a process that has changed since the tower was installed. At some point, replacement or permanent shutdown becomes the more economical path, and that decision brings a second question: who removes the old tower, and how does that work get done safely without shutting down the rest of the plant, hospital, or campus in the process?

USA Decom provides cooling tower decommissioning and removal services for commercial and industrial facilities in Lubbock and across the South Plains region. Whether the project involves a single rooftop crossflow unit on a downtown medical building or a multi-cell field-erected tower serving a cotton processing plant or manufacturing facility, the removal work follows the same general discipline: understand the tower and its connections, isolate it safely, take it apart in a controlled sequence, and get the components off the property with as much value recovered as reasonably possible.

Why Lubbock Facilities Are Retiring Older Cooling Towers

Lubbock’s industrial base is built around agribusiness and food processing, and the city sits at the intersection of US 84, US 82, and I-27, making it a natural distribution and logistics center for an agricultural region stretching across West Texas and eastern New Mexico. That agricultural economy drives demand for cotton gin facilities, seed processing operations, cottonseed oil extraction plants, and textile-adjacent manufacturing, many of which rely on process cooling systems. Add to that the city’s hospitals, Texas Tech University facilities, and a number of data center and colocation buildings, and the market includes a wide range of cooling tower types, sizes, and ages.

Many of these towers were installed decades ago, when a facility’s production line, HVAC plant, or chiller configuration looked different than it does today. As equipment is upgraded, consolidated, or replaced with air-cooled alternatives, the original tower — sized for a load that no longer exists — becomes a liability rather than an asset. Corrosion in a galvanized steel basin, delaminated fiberglass casing panels, and worn Geareducer or gearbox drives can develop after years of exposure to Lubbock’s dry, dusty, high-wind climate combined with the mineral content typical of West Texas water supplies, which can accelerate scaling in fill media and drift eliminators if water treatment has lapsed. In other cases, the tower itself is sound, but the building or plant is closing, being repurposed, or changing hands, and the tower needs to come out as part of a broader facility turnover.

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

What a Cooling Tower Removal Project Actually Involves

Cooling tower removal is a different project than chiller decommissioning, even though the two systems are often connected by the same condenser-water loop. The tower itself carries its own set of removal considerations: elevated structural steel or rooftop curbs, fan assemblies and motors, gear drives, fill media, drift eliminators, louvers, basins, and — on field-erected units — a substantial amount of site-built structural framing that has to be dismantled piece by piece rather than lifted out as a factory-assembled module.

A typical scope of work includes:

  • Disconnection and isolation of condenser-water supply and return piping, makeup water lines, and blowdown/drain connections
  • Removal of fans, motors, gearboxes or Geareducer drives, and drive shafts
  • Extraction of fill media and drift eliminators, which is often the most labor-intensive step given the volume of material and the need for proper handling and disposal
  • Removal of louvers, casing panels, and basin sections
  • Dismantling of structural steel supports, platforms, ladders, and access walkways
  • Crane picks or rigging plans for lifting sections off a roof, mezzanine, or elevated steel structure
  • Site restoration at the curb, roof penetration, or foundation once the tower footprint is cleared

For a factory-assembled tower — a single- or multi-cell crossflow or counterflow unit such as an SPX Marley NC, NC Everest, or MD Everest, a BAC Series 3000 or Series 1500, or an EVAPCO AT or LSTE unit — much of the tower arrives and often leaves in identifiable sections, which can simplify rigging compared to a field-erected system. Field-erected towers, which are more common on older industrial and power-related sites, are built in place from structural components and require a more deliberate disassembly sequence, since there is no factory module to unbolt and lift as a unit. Both configurations show up across the Lubbock market, from rooftop HVAC towers on commercial and institutional buildings to larger multi-cell installations serving process cooling loads at manufacturing and agribusiness facilities.

Rooftop Towers: A Distinct Set of Access and Rigging Challenges

Rooftop cooling towers are common on hospitals, office buildings, university facilities, and multi-story commercial properties throughout Lubbock, and they come with access considerations that ground-level towers don’t have. Before any disassembly begins, the removal plan needs to account for roof loading limits during the work, the condition and load rating of any existing crane pick points or roof screens, and the path equipment and rigging crews will use to reach the tower.

Crane selection and placement matter as much as the mechanical disassembly itself. On a tightly built downtown site, a mobile crane may need a specific setback and boom angle to clear adjacent structures, overhead lines, or rooftop equipment while still reaching the tower’s cells. On some projects, sections are broken down further on the roof before being lifted, rather than removed as larger assemblies, simply because of clearance or weight restrictions on the building structure or the available crane capacity. Coordinating this work with building operations — particularly at a hospital, laboratory, or occupied office building — usually means scheduling around HVAC shutdown windows, protecting roof membranes and adjacent equipment, and keeping designated pathways clear for other rooftop trades.

Field-Erected and Multi-Cell Tower Removal

Larger industrial sites in the Lubbock region — cotton processing plants, cottonseed oil facilities, food and dairy processing operations, and manufacturing plants — are more likely to have multi-cell or field-erected towers built up from structural steel, concrete basins, and site-assembled casing rather than a single factory-shipped unit. These systems require a more methodical teardown: fan decks and mechanical equipment typically come off first, followed by fill media and eliminators, then casing and louver panels, and finally the structural steel and basin itself.

Multi-cell towers also raise sequencing questions that single-cell units don’t. If only part of the tower is being retired while adjacent cells remain in service, the work has to be isolated so piping, electrical, and controls for the operating cells aren’t disturbed. Condenser-water piping serving a 500-ton, 1,000-ton, or larger multi-cell system often ties into shared headers, pumps, and treatment systems, so isolation valves, blind flanges, and lockout points need to be verified before any cutting or disconnection begins. On active industrial sites, this coordination with plant engineering and operations is usually the step that determines how smoothly the rest of the project goes.

Fill Media, Drift Eliminators, and Material Handling

Fill media and drift eliminator removal deserves its own mention because it’s frequently underestimated in scope and cost. PVC film fill and eliminator packs accumulate scale, biological growth, and debris over years of operation, and on a tower that has been in service for a decade or more, this material can be heavy, brittle, and unpleasant to handle. Removal generally means pulling fill sheets and eliminator modules by hand or with light equipment, staging the material for disposal, and inspecting the underlying structure — basin floor, support grids, distribution headers — once it’s exposed, since that structure is often hidden by fill for years at a time.

Proper handling and disposal of this material matters for two reasons: worker safety during extraction, and compliance with applicable local and state requirements for water and waste handling. Basin water is typically drained, tested if necessary, and disposed of in accordance with applicable requirements before demolition begins, and any residual sludge or scale in the basin is removed as part of that same process.

Asset Recovery: What’s Worth Recovering From a Retired Tower

Not every component of a retired cooling tower is scrap, and identifying recoverable value before demolition begins is part of planning a cost-effective removal. Motors, gear drives, and in some cases entire fan assemblies may have resale or reuse value depending on condition, age, and completeness. Structural steel, basin panels, and casing are typically recycled as scrap steel or aluminum, and copper or brass fittings from piping connections can add measurable scrap value on a larger multi-cell system. On projects where a tower is being replaced rather than simply retired, there can also be an opportunity to evaluate the outgoing unit for resale as used equipment if it’s still functional and reasonably intact.

Recoverable value depends heavily on the specific tower — manufacturer, model, tonnage, age, and condition all factor in — and it isn’t realistic to assume every component will offset project costs. But a removal plan that accounts for disposition options from the outset, rather than treating everything as scrap by default, generally produces a better outcome for the facility.

Case Studies from the Field

Similar removal projects often begin the same way: a facility engineer identifies a tower nearing the end of its useful life, sometimes in tandem with a chiller replacement or an HVAC upgrade, and needs the old unit out before new equipment can be installed or before a lease or property transfer deadline. On a typical rooftop project, our team’s planning starts with a site walk to document roof access, crane staging options, and the condition of the piping and electrical connections feeding the tower. From there, the sequence usually runs from mechanical and fill removal through structural dismantling, with material staged for scrap, recycling, or resale as it comes down.

On larger industrial projects — the kind more typical of a facility like Lubbock’s agribusiness and manufacturing base — the scope often expands to include multiple cells, shared condenser-water infrastructure, and coordination with a facility’s maintenance and operations staff to keep adjacent systems running during the work. In both settings, the goal is the same: remove the tower completely, restore the site or roof condition to what the facility needs for its next use, and recover reasonable value from the materials that come off site.

Planning a Cooling Tower Removal in the Lubbock Market

Lubbock’s geography puts it within reach of surrounding South Plains communities and neighboring West Texas markets, including Amarillo, Midland, Odessa, Abilene, Plainview, and Levelland, as well as facilities across the broader region served by Lubbock’s industrial and agricultural supply chain. USA Decom provides cooling tower removal services to facility owners, plant managers, and contractors throughout this region for projects tied to equipment replacement, plant shutdowns, chiller plant upgrades, and facility turnovers.

Before requesting a quote, it helps to gather some basic information: the tower manufacturer and model if known (or at least the approximate tonnage and number of cells), whether it’s rooftop or ground-level, whether it’s a single factory-assembled unit or a field-erected system, current operational status, and any target completion date tied to a construction schedule, lease requirement, or equipment cutover. Photographs of the tower, its access points, and the surrounding structure are also useful for developing an accurate scope and rigging plan before a site visit.

Tell Us About Your Project

If you’re planning to retire a rooftop or ground-mounted cooling tower at a facility in Lubbock or anywhere across the South Plains, use the form below to tell our team about the facility, the tower’s size and configuration, and your target schedule. Include details on access conditions, whether the unit is still operational, and any deadlines tied to construction, equipment replacement, or facility turnover, and our team will follow up to discuss scope and next steps.

Related Posts