A cooling tower rarely fails on a convenient schedule. Basins crack, fill media degrades, gearboxes seize, or a facility simply replaces an aging heat-rejection system with a smaller, more efficient unit and is left with a structure that no longer serves any purpose. In a market like Long Beach, where refineries, marine terminals, aerospace and manufacturing plants, cold storage facilities and commercial high-rises all depend on process or comfort cooling, that leftover tower can sit on a rooftop or a concrete pad for years before anyone addresses it. Eventually a lease turnover, a plant shutdown, a chiller plant upgrade or a redevelopment project forces the question: what does it take to actually get the tower out of the building?
USA Decom removes and decommissions open-circuit, closed-circuit, crossflow and counterflow cooling towers across Long Beach and the broader Los Angeles Harbor area, from single-cell rooftop units serving a commercial building to multi-cell, field-erected towers supporting a refinery, petrochemical plant or industrial process. This page covers what the work typically involves, the equipment and structural conditions our team plans around, and what a facility manager or property owner should have ready before requesting a project review.
Why Long Beach Facilities Need Cooling Tower Removal
Long Beach’s industrial base is unusually diverse for a city its size. The Port of Long Beach and the connected Port of Los Angeles anchor a logistics and marine terminal economy, and the broader local economy includes aerospace and shipbuilding manufacturing, oil refining, food processing and marine-related research and services. Long Beach also carries a long history as an oil-producing region, and refining and petrochemical processing remain part of the surrounding South Bay industrial corridor. Facilities tied to these industries, along with cold storage warehouses, aerospace manufacturers and commercial office and hospitality properties, commonly operate cooling towers to support process cooling, HVAC condenser water loops, or combined heat-and-power systems.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Because much of Long Beach’s industrial building stock dates back several decades, a significant share of the cooling towers in service today are approaching or beyond their practical service life. Basins corrode, structural steel fatigues from constant wet-dry cycling, and fill media and drift eliminators degrade to the point where thermal performance drops well below design capacity. When a facility replaces an old tower with a modern factory-assembled unit, upgrades a chiller plant, consolidates operations, or prepares a property for lease turnover or redevelopment, the abandoned or obsolete tower and its supporting structure typically need to come out entirely rather than simply be capped and left in place.
What Cooling Tower Removal Actually Involves
Cooling tower removal is not a single task — it is a sequence of mechanical, structural and logistical steps that has to be planned around the specific tower type, its location on the property, and the condition of the surrounding facility. A typical scope includes disconnecting and removing condenser water piping and valves at the tower connections, isolating and de-energizing fan motors and controls, and removing fans, gearboxes, drive shafts and motors as discrete lifts before the tower casing itself is opened up. Inside the unit, fill media, drift eliminators and louver panels are pulled and segregated, since PVC fill and eliminator material is typically handled and disposed of differently than structural steel or galvanized casing panels.
Once the internal components are out, the basin, casing panels and structural frame are dismantled in sections sized to whatever access and rigging conditions the site allows. For a rooftop unit, that often means breaking the tower down into manageable panel and frame sections that can be moved by hand or with a small hoist to a rooftop staging area before being lowered by crane. For a ground-level or field-erected tower, larger structural sections may come down as crane picks directly onto a trailer. Either way, the structural steel supports, platforms, ladders and any dedicated pump pads or piping racks associated with the tower are typically included in the scope so the area is left in a clean, safe condition rather than dotted with orphaned steel and abandoned piping stubs.
Rooftop Towers: Access, Rigging and Sequencing

A large share of the cooling tower removal work we see in commercial and light-industrial buildings involves rooftop-mounted units, and rooftop removals bring a distinct set of planning challenges. Before any dismantling begins, the project team needs to confirm roof access — whether there’s an existing roof hatch, stair tower or elevator large enough for tools and small components, and whether a crane pick will be needed to bring larger sections down to grade. Roof structural capacity matters too: an aging tower sitting on an original roof curb or dunnage frame may have been engineered for a lighter unit than what’s currently installed, and the removal sequence has to account for how weight is distributed across the roof deck as components are cut loose and staged before final pickup.
Crane access is often the deciding factor in how a rooftop project gets scheduled. In dense areas near the Downtown Long Beach core, the Port, or older commercial corridors along Anaheim Street and Pacific Coast Highway, street closures, overhead utility lines, adjacent buildings and limited staging space can all restrict where a crane can set up and what boom angle is available to reach the roof. On sites with tighter clearances, a tower may need to be broken into smaller sections than would otherwise be necessary, which adds labor hours but avoids the cost and disruption of larger crane mobilizations or temporary lane closures. Working with the property owner or general contractor early to identify rigging paths, roof penetrations, and any needed traffic control saves real time once the crew is mobilized.
Field-Erected and Multi-Cell Industrial Towers
Refinery, petrochemical, power generation and large manufacturing sites in and around Long Beach often rely on field-erected, multi-cell towers rather than factory-assembled packages — installations built up cell by cell on a concrete basin, sometimes spanning several hundred feet and supporting cooling loads well beyond what a single rooftop unit could provide. Removing a tower of this scale is closer to a structural demolition project than an equipment removal. Fan decks, fill sections and drift eliminators are removed cell by cell, structural steel columns and cross-bracing are disconnected and lowered in sequence, and the concrete basin is broken out or left in place depending on the owner’s requirements for the site.
Multi-cell towers frequently sit adjacent to active process units, tank farms or pipe racks, which means the removal sequence has to be coordinated with plant operations, isolation and lockout procedures, and often a formal permit-to-work process managed by the facility. Structural sections can be heavy and awkwardly shaped, particularly where corrosion has weakened connection points, so rigging plans need to account for actual field condition rather than original design weights. Manufacturers such as SPX/Marley and BAC design their field-erected systems with defined structural bays and cell modules specifically because that segmentation also makes disciplined, cell-by-cell demolition and removal more predictable — our approach follows that same logic in reverse.
Common Equipment and Tower Types We Work With
The towers we encounter across Long Beach facilities span a range of manufacturers, configurations and vintages, including:
- Factory-assembled crossflow and counterflow towers from SPX/Marley (NC, NC Everest, MD, MD Everest and AV series) and EVAPCO (AT and UT/UAT series)
- Baltimore Aircoil (BAC) factory-assembled units including Series 3000, Series 1500, PT2 and FXT/FXV closed-circuit coolers
- Field-erected, multi-cell industrial and process cooling towers built up on site
- Induced-draft and forced-draft designs, in both open-circuit evaporative and closed-circuit fluid-cooler configurations
- Rooftop package units serving commercial HVAC condenser water loops, ranging roughly from 100-ton single-cell units to 500-ton and larger installations
- Legacy towers from Recold, Ceramic Cooling Tower, Tower Tech and other manufacturers still in service on older properties
Because factory-assembled towers like the Marley NC and NC Everest, or EVAPCO’s AT series, are built as modular sections designed for rapid field installation, that same modularity often works in our favor during removal — panels and structural sections come apart along the seams they were engineered around rather than requiring extensive cutting. Field-erected systems generally require more structural demolition planning since there’s no factory-built seam to rely on.
Planning Around Site Conditions and Active Operations

Very few cooling tower removals happen in a vacuum. In most cases, the tower sits on or near a building that’s still occupied, adjacent to production areas that are still running, or on a roof shared with other mechanical equipment that has to stay in service. Planning around these conditions starts with confirming what utilities feed the tower — condenser water supply and return, makeup water, electrical service to the fan motors and controls, and any chemical treatment or blowdown lines — and how those systems get isolated without affecting equipment that will remain in operation.
Basin water and any residual chemical treatment additives typically need to be drained and disposed of appropriately as part of the mobilization phase, and site conditions such as confined access, limited laydown area, or the presence of asbestos-containing materials in older gaskets, insulation or transite panels can affect both the removal sequence and the applicable notification requirements. Demolition and renovation projects in the South Coast Air Quality Management District’s jurisdiction, which includes Long Beach, may be subject to advance notification and asbestos survey requirements depending on the size and nature of the work. We plan around the applicable local, state and federal requirements that apply to a given project’s specific conditions.
Asset Recovery and Material Disposition
Not every component of a decommissioned cooling tower is scrap. Fan motors, gearboxes and drive assemblies in serviceable condition, along with certain structural components, may have resale or reuse value depending on manufacturer, age, condition and market demand at the time of removal. Galvanized steel, stainless steel basin components and copper wiring or piping typically carry recyclable scrap value, and separating those materials properly during dismantling — rather than mixing them with mixed demolition debris — generally produces a better outcome for the material stream. PVC fill media, drift eliminators and FRP casing panels are handled according to their own disposal pathway since they don’t carry the same recovery value as metals.
We evaluate recoverable equipment and materials as part of project planning, and where a piece of mechanical equipment has resale or reuse potential, that can help offset a portion of the overall removal cost. We don’t guarantee that any particular piece of equipment will have resale value, and recovered value is not something a project should be planned around, but it’s a factor worth discussing before demolition begins rather than after everything has already gone into a scrap bin.
Project Spotlight: Rooftop and Industrial Tower Removals
Rooftop and field-erected cooling tower removals we’ve handled on properties comparable to those found throughout the Long Beach area typically start the same way: a facility manager or property owner identifies a tower that’s no longer needed, either because a chiller plant has been upgraded, a lease is turning over, or the building is being repositioned for a new tenant. On a typical rooftop project, our team confirms roof access and structural capacity, coordinates crane or hoist logistics with the building owner, and sequences the removal so fans, motors and gearboxes come down first as individual lifts before the casing and structural frame are broken into sections sized for the available access path.
On larger industrial sites, similar projects often involve a multi-cell field-erected tower that’s been replaced by a smaller, more efficient factory-assembled unit as part of a plant modernization effort. In those cases, our scope typically includes disconnecting and removing legacy piping runs, dismantling structural steel cell by cell, and coordinating basin demolition or removal with the facility’s engineering and operations teams so the work doesn’t interfere with the new tower’s installation or the plant’s ongoing production schedule. Recoverable steel and mechanical components are segregated for scrap or resale throughout the process, and the site is turned over in the condition specified by the owner.
What to Have Ready Before Requesting a Project
Use the form below to tell our team about your project or equipment.