A cooling tower rarely fails without warning. Basins corrode, fill media breaks down, gearboxes start leaking oil into the sump, and drift eliminators that were replaced a decade ago finally give up. For a facility manager in Laredo running a distribution center, food processing plant, manufacturing operation or corporate campus, the moment usually arrives during a chiller plant upgrade, a building system replacement, a lease turnover, or a facility closure. Whatever triggers it, removing a cooling tower safely and completely is a different project than replacing one — it involves de-energizing and disconnecting condenser water systems, rigging out heavy components from rooftops or mechanical yards, and managing structural steel, basins and fill media that were often built or assembled in place decades ago.
USA Decom provides cooling tower removal and decommissioning services for facility owners, general contractors, mechanical engineers and property managers throughout South Texas, covering everything from single-cell rooftop units to larger multi-cell, field-erected systems tied into industrial process cooling loops. This page walks through what that work typically involves and what our team needs to know to evaluate a project in the Laredo market.
Why Laredo Facilities Are Removing Aging Cooling Towers
Laredo’s industrial base has grown around its position as one of the primary land ports connecting the United States and Mexico. That role has supported a substantial inventory of warehouse, distribution, cold storage and light manufacturing space along the city’s freight corridors, much of it built to support cross-border trucking, warehousing and delivery of goods to manufacturing plants and distribution centers further inland. Many of these facilities, along with cold storage operations, food distribution centers and manufacturing plants supporting cross-border trade, rely on chilled water systems and process cooling loops that depend on rooftop or ground-level cooling towers.
As that first generation of buildings ages, particularly facilities constructed during Laredo’s early growth as a trade corridor, mechanical systems installed in the 1990s and 2000s are reaching the end of their practical service life. A cooling tower is typically one of the more visible components of that aging infrastructure. Fill media degrades, casings develop corrosion at weld seams and basin floors, and gearbox and fan assemblies accumulate enough wear that continued operation becomes a reliability and water-treatment liability rather than a routine maintenance item. When a facility replaces its chiller plant, converts to a different cooling strategy, downsizes its footprint, or prepares a building for a new tenant, the existing tower usually needs to come out completely rather than simply be repaired.
Common Triggers for Cooling Tower Removal Projects
Most cooling tower removal requests we evaluate fall into a handful of categories. A chiller or HVAC plant replacement is one of the most frequent — when a facility installs new chillers with different condenser water requirements, the existing tower is often undersized, oversized, or simply incompatible with the new equipment and controls. Facility closures and consolidations are another common driver, particularly for distribution or manufacturing operations near the Laredo trade corridor that are relocating or shutting down a specific building. Property turnover and lease-end obligations also generate removal work, especially when a landlord requires a tenant to return a roof or mechanical yard to a specified condition. Water-treatment and legionella-management concerns can also lead an owner to remove an idle or poorly maintained tower rather than continue managing biological growth risk in equipment that is no longer part of an active cooling strategy.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Cooling Tower Types and Manufacturers We Encounter

Cooling towers vary significantly in configuration, and that variation directly affects how a removal project is planned. Crossflow towers draw air horizontally through the fill while water falls vertically, while counterflow towers move air and water in opposing directions through the fill pack — the distinction affects fan and motor placement, access to internal components, and how the fill and drift eliminator sections are removed. Draft configuration matters as well: induced-draft towers pull air through with a top-mounted fan and motor assembly, typically the heaviest and most difficult component to rig off a rooftop unit, while forced-draft towers push air through with fans mounted lower in the structure.
Factory-assembled towers, common on rooftops and mechanical yards throughout Laredo’s distribution and light-industrial buildings, are typically manufactured as complete or near-complete modules and shipped to site, which generally makes removal more straightforward since the casing and structural components were designed to be handled as a unit. Field-erected towers, more common at larger industrial and process-cooling installations, are assembled panel-by-panel on structural steel and concrete basins built specifically for that installation. These require a more deliberate, staged dismantling approach because there is no single factory module to disconnect and lift.
In the field, we most often encounter equipment from SPX Cooling Technologies under the Marley brand, including NC Class and NC Everest crossflow towers and MD and MD Everest counterflow models, along with AV Class towers and larger AquaTower field-erected systems. Baltimore Aircoil (BAC) equipment is also common, including Series 3000 and Series 1500 open-circuit towers, PT2 towers, and Series V units, along with closed-circuit fluid coolers such as the FXT and FXV lines. EVAPCO equipment shows up regularly as well, particularly AT Series and LSTE factory-assembled towers along with UT and UAT models used in larger or field-erected configurations. Older installations sometimes carry Recold, Ceramic Cooling Tower, Tower Tech or Delta Cooling Towers nameplates, and identifying the manufacturer and model early in a project — even from a faded nameplate or an old set of mechanical drawings — helps our team anticipate component weights, structural attachment methods and disassembly sequence before crews mobilize.
Rooftop Cooling Tower Removal Considerations
A large share of the cooling towers we evaluate in Laredo’s commercial and light-industrial buildings sit on rooftops, typically on curbs or structural steel dunnage above the mechanical room or penthouse below. Rooftop removal introduces a specific set of planning requirements that don’t apply to ground-level equipment. Access is usually the first constraint: most rooftop towers were originally set in place by crane before the surrounding parapet, roof screen or adjacent rooftop equipment existed, which means the removal path may no longer match the installation path. Our team evaluates roof structural capacity, crane pick radius and rigging clearance, and coordinates with the facility on protecting the roof membrane and surrounding equipment during the pick.
Component sequencing matters as much as the final lift. Fan and motor assemblies, gearboxes (on belt-drive or gear-drive units), drift eliminators, fill media and casing panels are typically disconnected and removed in stages so that the crane is only lifting manageable, pre-rigged sections rather than an intact tower with unknown internal weight distribution. Condenser water piping is isolated and drained before any structural disconnection begins, and electrical disconnects for fan motors, sump heaters and controls are coordinated with facility electricians or a licensed electrical contractor as part of the broader shutdown sequence. Once the tower structure and basin are removed, curb and roof penetration restoration is typically handled by roofing trades as part of turnover, and our scope is coordinated accordingly.
Field-Erected and Larger Ground-Level Tower Dismantling
Field-erected and larger multi-cell towers, more typical of process-cooling applications at manufacturing plants and larger industrial facilities, require a different approach than a single rooftop unit. These systems are often built on cast-in-place concrete basins with structural steel superstructure, and dismantling generally proceeds in the reverse order of original construction — mechanical equipment and fan decks first, followed by fill media and eliminator sections, then structural framing and casing panels, and finally the basin structure itself if it is being demolished rather than left in place.
Multi-cell systems also introduce sequencing decisions around whether the facility needs partial cooling capacity maintained during removal, which is common when only part of a plant is being decommissioned. In those cases, we work with facility engineering staff to isolate the cells being removed while leaving adjacent cells and their piping, controls and structural connections intact and operational. Crane selection and pick planning for field-erected towers typically account for larger structural steel sections and heavier fan/gearbox assemblies than rooftop units, along with site access for mobile cranes given yard congestion, adjacent operations, and truck traffic that can be significant around Laredo’s distribution and manufacturing properties.
Full Scope of a Cooling Tower Removal Project
A complete cooling tower removal typically extends well beyond the visible tower structure itself. Depending on the installation, our scope of work may include:
- Condenser water piping disconnection, draining and removal back to the isolation point
- Fans, motors, gearboxes, drive shafts and belt or gear-drive assemblies
- Fill media, drift eliminators and inlet louvers
- Basin structures, sumps and associated overflow, makeup and drain piping
- Circulating pumps, chemical treatment equipment and controls where included in scope
- Structural steel framing, platforms, ladders, handrails and support dunnage
- Crane picks, rigging and staged component removal
- Final site or rooftop cleanup and turnover to other trades
Coordinating this full scope with mechanical, electrical and roofing trades, along with the facility’s operations staff, is usually the difference between a removal project that stays on schedule and one that runs into avoidable delays. We typically ask to review mechanical drawings, nameplate data and site photographs early in the process so the removal sequence, crane requirements and disposal logistics can be planned before a crew arrives on site.
Recycling and Asset Recovery Considerations
Cooling towers contain a meaningful amount of recoverable material, and identifying it before demolition begins can offset part of a removal project’s cost. Motors, gearboxes and drive components frequently have resale or scrap value depending on age, condition and manufacturer, and stainless steel or galvanized steel basin and casing panels represent a recoverable commodity stream separate from general demolition debris. Copper condenser water piping and electrical wiring within the scope also carry recycling value. PVC fill media and drift eliminators generally have no resale value and are handled as general demolition material, and any residual water treatment chemicals in sumps or feed systems typically require appropriate handling and disposal, depending on project conditions, as part of the shutdown sequence rather than being left for a demolition crew to encounter unexpectedly. We evaluate these factors as part of scoping a project rather than assuming every component will offset cost, since recoverable value depends heavily on the specific equipment, its age and its condition.
Project Spotlight: Rooftop Tower Removal Ahead of a Chiller Plant Upgrade

On a recent project of this type, a commercial facility replacing an aging rooftop chiller plant needed the existing cooling tower removed to make way for new mechanical equipment with a different footprint and condenser water connection point. The tower was a factory-assembled, induced-draft crossflow unit set on structural steel dunnage above an occupied building, which meant the work had to be sequenced around limited rooftop access, a tight crane pick window, and coordination with mechanical contractors already staging the replacement equipment. Our team isolated and drained the condenser water piping, disconnected the fan and motor assembly and gearbox as a pre-rigged pick, removed the fill media and casing sections in stages, and cleared the basin and support steel ahead of the new equipment’s structural pad. Projects like this typically depend on tight coordination between the demolition sequence and the incoming equipment’s installation schedule, since roof access and crane time are usually shared, limited resources on an active commercial building.
What Our Team Needs to Evaluate Your Project
Before providing a scope and approach for a cooling tower removal project, we typically ask for a few pieces of information: the facility type and location within Laredo or the surrounding region, whether the tower is rooftop or ground-level and factory-assembled or field-erected, the manufacturer and model if known (even from an old nameplate), the number of cells, whether the tower is currently operating or already offline, site access conditions including crane staging area and overhead obstructions, and the target schedule, particularly if removal is tied to a chiller replacement, lease deadline or facility closure date. Photographs of the tower, nameplate, surrounding roof or yard area and access route are especially useful for planning crane requirements and rigging approach before a site visit.
Serving Laredo and the Surrounding South Texas Region
USA Decom provides cooling tower decommissioning and removal services throughout Laredo and the broader South Texas border region, including facilities in Webb County and nearby communities such as Zapata, Rio Bravo and Bruni. We also serve neighboring markets across South Texas and the Rio Grande Valley, including San Antonio, Eagle Pass, Del Rio, McAllen and Corpus Christi, where similar cross-border logistics, food processing and manufacturing operations rely on cooling tower systems that eventually require replacement or removal.
Tell Us About Your Cooling Tower Removal Project
If your Laredo facility has a cooling tower removal or decommissioning project, let us know.
Use the form below to tell our team about your project or equipment.