Why Inland Empire Facilities Are Retiring Cooling Towers
The Inland Empire’s industrial base has grown well beyond its warehousing and logistics reputation. Manufacturing plants, cold storage facilities, food and beverage processing operations, and commercial buildings throughout Riverside and San Bernardino counties rely on cooling towers to reject heat from HVAC and process cooling systems. As these facilities age, get sold, undergo mechanical upgrades, or shift production, the cooling towers serving them frequently reach the end of their useful service life at the same time.
A cooling tower rarely fails or gets replaced on its own. In most cases, tower removal is triggered by a larger project: a chiller plant upgrade, a building repositioning for a new tenant, a manufacturing line shutdown, or a full facility decommissioning tied to a lease turnover. Whatever the driver, once a tower is identified for removal, the owner or facilities team needs a contractor who understands the structural, mechanical and logistical realities of taking a tower apart safely and efficiently, whether it sits on a rooftop in Ontario, on a mechanical yard pad in Fontana, or on structural steel above a process building in Riverside.
USA Decom provides cooling tower decommissioning and removal services for commercial, institutional and industrial facilities throughout the Inland Empire, including projects tied to chiller plant replacements, mechanical retrofits, building repositioning and complete facility shutdowns.
What Cooling Tower Removal Actually Involves
Cooling tower removal is a distinct scope from chiller removal, even though the two systems are connected through the condenser water loop. A tower project typically includes:
- Draining and isolating the condenser water system and disconnecting supply and return piping at the tower connections
- De-energizing and disconnecting fan motors, VFDs and tower-mounted controls
- Removing fans, motor mounts, gearboxes or belt-drive assemblies (for towers using Marley Geareducer-style or direct-drive fan systems)
- Removing fill media, drift eliminators and louvers
- Draining and cleaning the cold-water basin, including removal of basin heaters, screens and float valves
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Disassembling or cutting down casing panels, partition walls and structural framing
- Rigging and lowering sections from rooftops, structural steel platforms or elevated mechanical pads
- Removing associated condenser water pumps, strainers, chemical treatment skids and interconnecting piping when included in the project scope
- Segregating recoverable materials (steel, copper, PVC fill, stainless components) from waste for recycling
Whether the tower is a single-cell factory-assembled unit or a multi-cell field-erected system, the removal sequence generally reverses the original installation, and the practical difficulty of the job is driven far more by access and rigging conditions than by the tower’s mechanical complexity.
Factory-Assembled vs. Field-Erected Towers: Different Removal Approaches
Inland Empire facilities use a mix of tower configurations, and the removal approach depends heavily on which type is installed.
Factory-assembled, crossflow or induced-draft towers — such as the crossflow designs common in the Marley NC and NC Everest product lines or counterflow units like BAC’s Series 3000 and PT2 towers — arrive on site as a shippable module or a small number of large sections. Removal often mirrors that logic: the casing can frequently be cut or unbolted into sections sized for crane picks or forklift handling, and internal components (fill, eliminators, fan assembly) are pulled before the shell is disassembled. These towers are common on rooftops and mechanical penthouses throughout the region’s office, healthcare, cold storage and light-industrial buildings.
Field-erected towers, more typical of larger manufacturing plants, central utility plants and multi-cell installations, are built in place from structural steel, casing panels and internal components assembled on site. Removing a field-erected tower is closer to structural demolition than equipment removal — it involves methodically dismantling structural steel, cross-bracing, casing panels and basin walls, often cell by cell, with each component individually rigged down rather than lifted as a single assembly.
Both categories may be open-circuit towers, which cool water directly through evaporation, or closed-circuit fluid coolers, which use a coil to keep process fluid separate from the evaporative spray. Closed-circuit units typically add a coil bundle and additional piping connections to the removal scope, along with the coil’s own draining and disposition requirements.

Rooftop Removal: Access and Rigging Considerations
A meaningful share of cooling tower removal work in the Inland Empire involves rooftop-mounted equipment, particularly on mid-rise commercial buildings, hospitals, hotels and light-industrial facilities where the tower sits above occupied or operating space. Rooftop removal introduces planning requirements that a ground-level tower doesn’t have:
- Confirming crane pick locations, boom clearance and rigging radius relative to the building, parking structures, power lines and adjacent rooftop equipment
- Verifying roof and structural steel load limits for staging disassembled components before they’re lifted down
- Coordinating with building operations to protect roofing membrane, maintain fire/life-safety systems, and manage any occupied floors below the work area
- Sequencing disconnections so condenser water, electrical and control systems are safely isolated before rigging begins
- Managing weather and wind conditions during crane operations, which matters in the Inland Empire’s exposed desert-adjacent locations as much as anywhere in Southern California
Ground-level and yard-mounted towers, more common at manufacturing and distribution facilities in cities like Fontana, Rancho Cucamonga, Chino and Moreno Valley, generally simplify rigging but can introduce their own access challenges around active production areas, tight yard space, or proximity to operating utilities that can’t be shut down for the project.
Asset Recovery: What a Retired Cooling Tower Is Actually Worth
Before a tower gets scrapped outright, it’s worth evaluating what components have recovery value. This is one of the most overlooked parts of a decommissioning project, and it directly affects the net cost of the removal.
Components with potential resale or reuse value:
- Complete fan motors, gear reducers and drive assemblies in working condition
- VFDs and tower control panels
- Intact fill media assemblies and drift eliminator sections, in some cases
- Condenser water pumps and motors removed as part of the associated piping scope
- In limited cases, an intact tower cell itself, if the manufacturer, capacity and condition suit a secondary buyer
Materials with recycling and scrap value:
- Galvanized and stainless steel casing panels and structural framing
- Copper piping, tubing and wiring
- Aluminum components
- Non-ferrous fittings and hardware
- Structural steel from field-erected frames
Materials requiring disposal or specialized handling:
- PVC and polypropylene fill media not suitable for reuse
- Deteriorated fiberglass or FRP casing sections
- Basin sludge and biological growth requiring appropriate cleanout
- Insulation and gasket materials depending on age and composition
The condition, completeness, age and manufacturer of the equipment all affect what has genuine secondary-market demand. A well-maintained induced-draft tower from a recognized manufacturer with intact motors and gearboxes carries more recovery potential than a corroded basin and fill assembly headed straight to scrap. USA Decom evaluates recoverable equipment and materials as part of project planning so that asset recovery and recycling proceeds can help offset a portion of the overall removal cost — not as an afterthought once demolition is already underway.
Planning the Scope: What We Need to Evaluate Your Project

Every cooling tower project is shaped by a handful of practical variables, and having good information up front leads to a more accurate assessment. Useful details include:
- Tower manufacturer and model, if known (nameplate photos are ideal)
- Approximate tonnage and number of cells (single-cell vs. multi-cell)
- Tower type: crossflow, counterflow, open-circuit or closed-circuit
- Whether the tower is factory-assembled or field-erected
- Location: rooftop, mechanical yard, penthouse or ground-level pad
- Building height and crane access conditions if rooftop-mounted
- Condition of fans, motors, gearboxes and casing
- Associated scope: condenser water piping, pumps, chemical treatment systems
- Whether the facility is operating, partially operating or fully shut down
- Target completion date, especially if tied to a lease turnover, chiller cutover or building sale
Photographs of the tower, nameplate, surrounding roof or yard area, and any accessible piping connections help our team put together a realistic scope and schedule before a site visit is even scheduled.
Project Spotlight: Rooftop Tower Removal Ahead of a Chiller Replacement
A recent project of this type involved a commercial building undergoing a chiller plant upgrade, where the existing rooftop cooling tower needed to come down before new condensing equipment could be installed. The scope included isolating and draining the condenser water loop, disconnecting the fan motor and control wiring, removing the fill media and drift eliminators, and cutting the casing into rigging-sized sections for a crane pick coordinated around building operations below. Recoverable steel and copper components were segregated on site for recycling, while the fan motor and gear drive, still in serviceable condition, were pulled separately for evaluation rather than sent to scrap with the rest of the structure. Projects like this illustrate how sequencing disconnection, disassembly and material segregation together — rather than treating removal as a single demolition step — improves both safety and recovery outcomes.
Serving Riverside and San Bernardino County Facilities
USA Decom provides cooling tower decommissioning and removal services throughout the Inland Empire, including Riverside, San Bernardino, Ontario, Fontana, Rancho Cucamonga, Chino, Moreno Valley, Corona and the surrounding logistics and manufacturing corridors along the I-10, I-15 and SR-60. This region’s dense concentration of distribution centers, cold storage facilities, manufacturing plants and commercial buildings means tower configurations vary widely — from small rooftop units to large multi-cell, field-erected systems serving central utility plants — and our approach adjusts to match the equipment and site conditions in front of us.
Tell Us About Your Cooling Tower Project
If you’re planning a chiller upgrade, building repositioning, mechanical retrofit or facility shutdown that includes a cooling tower coming out of service, use the form below to tell our team about the facility, the tower’s size and configuration, and your target schedule. Photos of the tower and its surrounding access conditions help us put together an accurate scope, and we’ll walk you through what removal, recycling and potential asset recovery could look like for your specific project.