A cooling tower rarely fails all at once. More often, a facility manager in Fresno notices declining thermal performance, rising water treatment costs, persistent basin leaks or a fill media that’s been patched one too many times, and eventually the conversation shifts from “repair” to “replace.” Once that decision is made, the tower still has to come down safely, whether it sits on a rooftop above an occupied building, on a ground-level pad next to an active production line, or as part of a multi-cell bank feeding a central plant.
USA Decom removes open-circuit, closed-circuit and hybrid cooling towers for commercial, industrial, food processing, healthcare and institutional facilities. Our work covers factory-assembled crossflow and counterflow units as well as larger field-erected towers, along with the associated condenser-water piping, pumps, structural supports and controls that come with them. Below, we’ve organized this page around the questions we hear most often from Fresno-area facility managers and engineers evaluating a cooling tower removal project.
What Does a Cooling Tower Removal Project Actually Involve?
Removing a cooling tower is rarely just “unbolt it and lift it off.” A typical scope includes:
- Isolating and draining the condenser water system, including basin, sump and interconnecting piping
- Electrically and mechanically isolating fan motors, VFDs and controls before any dismantling begins
- Disconnecting and removing fans, gearboxes or belt-drive assemblies, drift eliminators and fill media
- Dismantling casing panels, louvers and basin sections, often in sequence to control weight and access
- Disassembling or cutting structural steel supports, platforms and ladders
- Rigging and lifting tower sections or components to grade, staging area or waiting transport
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- Segregating recoverable metals, motors and mechanical components from fill media and composite materials destined for disposal
- Restoring or capping the mechanical penetration, curb or pad once the tower is gone
The exact sequence depends heavily on whether the unit is a smaller factory-assembled tower that can potentially be lifted intact, or a larger field-erected or multi-cell installation that has to be dismantled in place piece by piece.
Is My Cooling Tower a Rooftop Unit or a Field-Erected System, and Why Does That Matter?
The distinction between a factory-assembled tower and a field-erected tower changes almost every part of the removal plan.
Smaller factory-assembled towers, such as crossflow units in the Marley NC family or forced-draft towers like Baltimore Aircoil’s Series 3000 line, are often built as complete or near-complete modules. Depending on size, weight, rooftop access and crane reach, a unit like this can sometimes be rigged and removed largely intact, which shortens schedule and reduces the number of separate lifts required.
Field-erected towers and larger multi-cell installations, often built up from EVAPCO UT/UAT-style components or comparable field-assembled systems, were constructed section by section on-site and generally have to be dismantled the same way. That means removing fan decks, casing panels, fill sections, basins and structural steel as individual pieces, in a sequence engineered to keep the remaining structure stable throughout the process.
Rooftop installations add another layer of planning. Crane picks over an occupied building, load path restrictions across roof membranes, and coordination with building operations to keep other rooftop equipment and personnel clear during lifts are all part of a rooftop cooling tower removal that don’t apply to a ground-level pad.
Local Considerations for Fresno-Area Facilities
Fresno’s economy is built heavily around food and agricultural processing, and that sector places significant demand on evaporative cooling equipment. Canning, freezing, dairy, beverage and cold-storage operations throughout the Central Valley rely on cooling towers to support refrigeration, pasteurization and process cooling loads, often running towers on a near-continuous basis during peak production seasons. That duty cycle can accelerate scale buildup, fill degradation and basin corrosion compared to lighter-duty commercial applications, which is one reason cooling tower condition often becomes a replacement consideration sooner in facilities with heavy seasonal processing demand.
Fresno’s industrial base also includes manufacturing, healthcare campuses and a growing logistics and distribution sector along the Highway 99 corridor, many of which operate central plants with rooftop or grade-mounted cooling towers supporting HVAC and process loads. Facilities across the wider Central Valley climate deal with high summer ambient temperatures and correspondingly heavy tower run-time, which affects both equipment condition at end-of-life and the urgency of scheduling a shutdown window that doesn’t conflict with peak cooling demand.
USA Decom provides cooling tower decommissioning and removal services throughout Fresno and the surrounding Central Valley, including Clovis, Madera, Visalia, Hanford, Merced and communities along the Highway 99 and Highway 41 corridors. Whether the project is a single rooftop unit above a processing plant or a multi-cell bank at a larger campus, the planning principles are similar even as scale changes.

How Do You Handle Shutdown Timing Without Disrupting Our Operation?
Most cooling tower removals happen at facilities that are still operating, at least in part. That reality shapes the schedule more than almost anything else.
Before mobilizing, we want to understand:
- Whether the tower serves a system that can be fully shut down, or whether backup cooling capacity needs to stay online during the work
- Production schedules, shift patterns or seasonal peaks that would make certain weeks unworkable
- Any planned shutdown, turnaround or maintenance window the facility has already identified
- Access restrictions tied to adjacent operations, food-safety zones or occupied space below a rooftop unit
For facilities that can’t tolerate a full cooling outage, sequencing sometimes involves keeping one cell of a multi-cell tower running while others are dismantled, or scheduling the heaviest rigging work during a planned production down period. For single-tower systems being fully decommissioned ahead of a replacement unit, coordination with the mechanical contractor installing the new tower often determines the removal timeline.
What Site Conditions Affect Access and Rigging?
Before quoting a cooling tower removal, we look closely at how equipment and materials will actually move from the tower location to the ground and off-site. Relevant conditions typically include:
- Crane placement and reach for rooftop or elevated installations, including roof load limits and required rigging plans
- Available laydown area for staging dismantled sections, fill media and structural steel
- Overhead obstructions such as conduit, ductwork, piping racks or adjacent rooftop equipment
- Basin and platform weight once water is drained versus while still full
- Distance and route from the tower to a loading area capable of handling flatbed or roll-off transport
- Whether interior building access is required to reach a rooftop unit’s mechanical penetration
A tower mounted on structural steel legs above a mechanical yard presents a very different rigging plan than the same tower sitting on a rooftop curb three stories above an active production floor. We develop the lift and dismantling sequence around the specific site rather than a generic removal template.
What Happens to the Materials Once the Tower Comes Down?
Cooling towers contain a genuine mix of recoverable and non-recoverable material, and separating them properly affects both cost and disposition.
Structural steel, casing panels, basins and piping are typically scrap steel, galvanized steel or stainless steel depending on the tower’s construction, and these materials generally have recycling value. Motors, gearboxes, VFDs and larger mechanical components may have resale or reuse potential depending on manufacturer, model, condition and remaining service life, particularly for units that were well maintained before removal. Fill media, drift eliminators and certain composite or FRP casing components are usually not recoverable and require appropriate disposal.
We don’t promise that every component will offset removal costs, but identifying what’s genuinely recoverable before demolition begins is a routine part of scoping a project. On a larger multi-cell tower, or a field-erected system with substantial structural steel, the recovered material can represent a meaningful portion of the total scope, which is worth understanding before assuming full disposal costs.

Do You Handle the Associated Piping, Pumps and Controls, or Just the Tower?
Cooling tower removal projects frequently extend beyond the tower shell itself. Depending on the scope our customers need, work can include:
- Condenser water supply and return piping back to the mechanical room or chiller plant connection point
- Tower-side pumps, strainers and chemical treatment skids that served only the tower being removed
- Control panels, VFDs and associated wiring dedicated to the tower and its fans
- Basin heaters and freeze-protection equipment where present
- Structural platforms, ladders and guardrails specific to the tower installation
Facilities replacing an old tower with a new one often want the old piping and controls cleared to a defined tie-in point rather than left in place, while facilities eliminating a tower entirely may need the mechanical penetration or curb capped and weatherproofed as part of final turnover.
Real-World Project Experience
Cooling tower removal work in the Central Valley often involves food and beverage processing facilities that have run towers at high duty cycles for years before replacement becomes necessary. On projects of this type, our team typically starts with a site walk to document tower condition, confirm structural access and rigging routes, and identify which components have recovery value versus which are headed for disposal. From there, the sequence generally follows isolation and drain-down, mechanical and electrical disconnection, staged dismantling of fan assemblies and casing sections, structural steel removal, and material segregation for recycling or haul-off.
For rooftop installations above occupied manufacturing or processing space, coordination with the building’s operations team on crane staging, roof protection and work-zone boundaries is typically worked out before any rigging begins, since the lift plan has to account for what’s happening on the floors below. Multi-cell field-erected towers require a more deliberate dismantling sequence, since removing one cell’s structural support can affect the stability of adjacent cells still in service.
Cooling Tower Removal Checklist for Facility Managers
Before requesting a quote, it’s helpful to gather the following:
- Tower manufacturer and model, if available (nameplate photo is useful)
- Tower type: crossflow, counterflow, open-circuit or closed-circuit
- Approximate tonnage and number of cells
- Installation type: rooftop, ground-level pad, or elevated structural steel
- Whether the system needs to remain partially operational during removal
- Target completion date or coordination deadline with a replacement tower installation
- Known access constraints: crane clearance, roof load limits, laydown space
- Photos of the tower, surrounding structure and access route, if possible
Having this information ready helps us give a more accurate initial assessment and identify potential complications, such as rigging clearance or material handling issues, before a site visit.
Tell Us About Your Cooling Tower Project
Whether you’re decommissioning a single rooftop tower above a processing facility, clearing an aging multi-cell bank at a central plant, or coordinating removal ahead of a new tower installation, use the form below to tell our team about the facility, tower type, approximate size, site access conditions and target schedule. Photos of the tower and surrounding structure are helpful if you have them. We’ll use that information to talk through scope, sequencing and what a project like yours typically involves.