A cooling tower rarely fails all at once. More often, a facility reaches a point where the tower has simply outlived its usefulness — the process it once served has been shut down, a plant is transitioning to air-cooled or closed-loop systems, a rooftop unit has reached the end of its structural service life, or a property is being redeveloped and the old mechanical yard needs to be cleared. When that point arrives in El Paso, facility owners and contractors need a team that understands both the mechanical complexity of dismantling a tower and the practical realities of doing it safely on an active industrial site or an occupied rooftop.
USA Decom provides cooling tower decommissioning and removal services for manufacturing plants, distribution centers, institutional campuses, power and utility facilities, and commercial properties throughout the El Paso area. Whether the job involves a single factory-assembled crossflow unit tucked into a mechanical yard or a multi-cell field-erected tower serving a large industrial process, our team approaches the work with the same core discipline: understand the equipment, plan the sequence, protect the site, and recover value from the materials wherever it makes sense to do so.
Why El Paso Facilities Retire Cooling Towers
El Paso sits at the center of a binational manufacturing and logistics corridor along the U.S.–Mexico border, with a long-established base of maquiladora-linked manufacturing, defense-related operations connected to Fort Bliss, and a growing warehouse and industrial footprint stretching along the I-10 corridor and the regional rail network that serves the area. Many of the industrial and institutional buildings that support this activity were built with process cooling systems designed around a specific production line, chiller plant configuration, or manufacturing process that has since changed, downsized, or relocated.
The desert climate also plays a role. El Paso’s hot, dry summers put heavy seasonal demand on evaporative cooling equipment, and towers that have run hard for years in this environment often show the effects in corroded basins, deteriorated fill media, and structural steel or casing components approaching the end of their practical service life. When a facility decides it makes more sense to replace an aging tower, convert to a different cooling strategy, or eliminate a cooling load that no longer exists, the old tower has to come out — and that work needs to be planned with the same care as the original installation.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
What Cooling Tower Decommissioning Actually Involves
Cooling tower removal is not a single task; it’s a sequence of interdependent steps that has to be planned around the specific tower type, its location, and the condition of the surrounding facility. Before any dismantling begins, the associated condenser-water system needs to be isolated and drained, and any residual water treatment chemicals, biological growth, or scale deposits inside the basin and piping need to be identified and addressed as part of the project plan. Electrical disconnects for fan motors, controls, and any auxiliary equipment must be verified de-energized and locked out before mechanical crews begin work.
From there, physical removal generally proceeds from the top of the structure downward. Fan assemblies, motors, gear reducers or belt drives, and fan stacks or cylinders are typically removed first, followed by drift eliminators, fill media, and distribution decking. Basins, casing panels, and louvers come next, followed by the structural steel or FRP frame that supports the assembly. Field-erected towers add another layer of complexity because much of the structure — the cold-water basin, fill support steel, fan deck — was built in place and may need to be cut down and removed in sections rather than lifted as a complete unit.

Every project also involves the connected condenser-water piping and any associated pumps, strainers, and control valves. Depending on the scope the owner defines, this piping may be removed back to a specific tie-in point, capped for future use, or fully demolished along with the tower itself. Coordinating this piping work with the mechanical trades responsible for the chiller plant or process equipment on the other end of the loop is one of the more important scope decisions to settle early in planning.
Rooftop Towers Present a Distinct Set of Challenges
A significant share of the cooling towers our team evaluates for removal are mounted on rooftops rather than at grade, and rooftop work changes the entire logistics picture. Roof-mounted towers require careful review of crane pick locations, boom clearance, and rigging paths, particularly on buildings surrounded by parking structures, adjacent tenants, power lines, or limited street access. The roof structure itself has to be evaluated for point loading during rigging and staging, and any roofing membrane, flashing, or curb work disturbed during removal needs to be addressed as part of the closeout scope so the building owner isn’t left with an open penetration or a compromised roof system.
Access is often the limiting factor on a rooftop project. Some buildings have roof hatches or interior stairwells adequate for smaller components but nothing large enough for a complete cell casing or basin section, which means larger components have to be cut down to a size that can be rigged out safely. On other buildings, a rooftop tower can only be reached by crane, which requires securing street closures, coordinating with the property manager or other tenants, and scheduling the lift for a window when the building’s operations and nearby traffic patterns allow it. We work through these access constraints during the planning phase so the owner has a clear picture of sequencing, equipment needs, and schedule before mobilization.
Field-Erected and Multi-Cell Tower Removal
Larger industrial facilities in the El Paso area sometimes operate field-erected, multi-cell cooling towers rated well beyond the capacity of a typical factory-assembled unit — installations in the 500-, 1,000-, and 1,500-ton-plus range can be found on process-heavy sites. These towers were often built in place using site-poured concrete basins, structural steel or timber framing, and FRP or metal casing panels assembled cell by cell. Removing a structure like this requires a different approach than unbolting and lifting a packaged unit: crews typically work cell by cell, removing fans, fill, and casing from each section before moving to structural disassembly, and larger structural members may need to be cut and rigged individually rather than removed as complete assemblies.
Multi-cell towers also frequently share a common basin and distribution header, which means the sequence has to account for how partial demolition affects the remaining cells if the tower will stay partially in service during a phased shutdown. On sites where only a portion of the cooling capacity is being retired, isolating the affected cells without disrupting the cells that remain in operation becomes one of the central planning challenges.
Equipment and Manufacturers Commonly Encountered
Facility owners in the region operate cooling towers from a range of manufacturers, and recognizing the equipment on site helps our team plan the removal scope accurately. We regularly work around factory-assembled crossflow and counterflow towers from SPX Cooling Tech’s Marley line, including NC-series and NC Everest crossflow towers and MD-series induced-draft counterflow units, as well as Baltimore Aircoil (BAC) products such as the Series 3000 and Series 1500 crossflow towers, PT2 units, and closed-circuit FXT and FXV fluid coolers. EVAPCO’s AT-series and UAT/UT lines also appear on a number of industrial and institutional sites throughout the area. Older installations sometimes carry legacy nameplates from predecessor brands like Recold, and closed-circuit cooling towers or hybrid fluid coolers may be present alongside open-circuit units, particularly at facilities with process cooling loops that require a cleaner heat-rejection fluid.
Understanding whether a tower is open-circuit or closed-circuit, factory-assembled or field-erected, and single-cell or multi-cell affects nearly every decision that follows — the rigging plan, the crane requirements, the sequence for draining and isolating the system, and the potential for component reuse or resale.
Asset Recovery and Material Disposition
Not every component removed from a retiring cooling tower is scrap. Motors, gear reducers, and fan assemblies in serviceable condition can sometimes be evaluated for resale or reuse, particularly on towers that were well maintained or retired for reasons unrelated to equipment failure, such as a process shutdown or facility redevelopment. Structural steel, FRP panels, and casing materials are typically segregated for recycling, and copper and other metals recovered from piping, motor windings, and hardware add further recovery value. Fill media and drift eliminators generally have limited resale value but still need to be handled and disposed of properly, particularly given the biological growth and mineral scale that can accumulate inside a tower over years of operation.
We evaluate the recoverable value of a tower’s components as part of scope development, and where meaningful value exists, that recovery can help offset a portion of the overall removal cost. We don’t treat every piece of equipment as scrap by default, and we don’t assume every component has resale value — each tower gets evaluated on its own condition, age, and completeness.
Planning Your Project: What We Need to Know
Because every cooling tower removal is shaped by the specific equipment, structure, and site conditions involved, we start by gathering the details that let us put together an accurate scope and schedule. Helpful information includes:
- Tower manufacturer, model, and approximate tonnage if known
- Number of cells and whether the unit is factory-assembled or field-erected
- Location on the property — at grade, on a rooftop, or on a mezzanine or platform
- Current operating status and whether the tower needs to stay in service until a specific date
- Condition of the surrounding piping, electrical connections, and structure
- Site access conditions, including crane staging areas, overhead clearance, and nearby obstructions
- Any known hazards, such as prior water treatment chemical use or suspected biological contamination
- Target removal timeline, including any lease, shutdown, or redevelopment deadlines
- Photographs of the tower, nameplate, and surrounding access points
Having this information available before the first site visit helps us move faster from initial conversation to a workable project plan.

Project Spotlight: Rooftop Tower Removal at an Industrial Facility
One project our team evaluated involved a multi-story industrial building where an aging rooftop cooling tower had been taken out of service after the production line it supported was consolidated elsewhere. The building had no roof-level crane access point large enough for a standard pick, which meant the casing panels, fan assembly, and fill media had to be broken down into sections small enough to move through the existing roof hatch and staged for a crane lift from an adjacent lot. Coordinating the lift required working around the building’s active tenants below, securing a temporary staging area, and scheduling the crane work outside normal operating hours to minimize disruption. Condenser-water piping was traced back through several floors, isolated, and capped at the mechanical room rather than removed in full, since the owner planned to reuse the riser for a future rooftop unit. Projects like this illustrate why an accurate site walk and a clear scope conversation matter before a crew ever shows up — access conditions on a rooftop project often dictate the entire removal method.
Serving El Paso and the Surrounding Region
USA Decom provides cooling tower decommissioning and removal services throughout El Paso and the broader West Texas and southern New Mexico border region, including Socorro, Horizon City, Anthony, Canutillo, and Fabens, as well as industrial operators along the border-adjacent corridor extending toward Las Cruces, New Mexico. We work with manufacturing plants, distribution and logistics operators, institutional campuses, and commercial property owners who need a retiring, damaged, or obsolete cooling tower removed safely and efficiently, whether the project involves a single rooftop unit or a multi-cell field-erected system serving a larger industrial process.
Tell Us About Your Cooling Tower Project
If you’re planning to remove a cooling tower in the El Paso area — whether it’s a rooftop unit that’s reached the end of its service life, a field-erected system tied to a shuttered process line, or equipment being cleared ahead of a facility redevelopment — use the form below to tell our team about the facility, the tower’s size and manufacturer if known, its location on the property, and your target schedule. Photos of the unit and surrounding access points help us put together a more accurate project plan from the start.