Why DFW Facilities Are Removing Aging Cooling Towers
Cooling towers rarely fail all at once. More often, a facility manager in Dallas, Fort Worth or one of the surrounding industrial corridors starts noticing the signs over several seasons — basin corrosion, fill media breaking down, fan vibration that keeps getting worse, or a mechanical contractor recommending replacement rather than another repair cycle. In a region where cooling loads run hard for much of the year, an underperforming or failed tower is not a minor maintenance item. It affects chilled water capacity, process cooling, building comfort systems, and in some cases production uptime.
Across the Metroplex, cooling tower removal projects come from a handful of recurring situations: a tower has reached the end of its service life and is being replaced with a new factory-assembled or field-erected unit; a plant is consolidating or shutting down a production line and no longer needs the associated heat-rejection equipment; a rooftop unit is being removed ahead of a re-roofing or structural project; or a facility is decommissioning an entire mechanical yard as part of a larger closure. In each case, the physical removal work is a distinct scope from replacement or repair — and it is often underestimated in terms of rigging complexity, access planning and disposal logistics.
USA Decom provides cooling tower decommissioning and removal services for commercial, industrial, institutional and data center facilities throughout Dallas, Fort Worth, Arlington, Plano, Irving, Grand Prairie and the broader North Texas region. This page walks through what a cooling tower removal project typically involves, the equipment types most commonly encountered, and what our team needs to know to evaluate a project.
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
Cooling Tower Types and Configurations Common to This Market
North Texas has a large and varied industrial and commercial building stock, which means cooling tower removal projects here cover a wide range of equipment types. Rooftop-mounted, factory-assembled towers are extremely common on commercial buildings, distribution centers, hospitals and mid-size manufacturing plants. Larger process facilities, campuses and utility plants are more likely to have field-erected, multi-cell towers built up on structural steel with poured concrete basins.
Both crossflow and counterflow configurations appear regularly in this market, along with induced-draft and forced-draft fan arrangements. Open-circuit towers remain the most common configuration for comfort cooling and general process loads, while closed-circuit fluid coolers are frequently found protecting process equipment, standby generators or systems that require water quality isolation. On the manufacturer side, our team regularly works around equipment from SPX Cooling Technologies under the Marley brand — including NC and NC Everest crossflow towers, MD and MD Everest models, and AV-series and AquaTower product lines — as well as Baltimore Aircoil Company (BAC) towers such as the Series 3000, Series 1500, PT2, Series V and FXT/FXV lines, and EVAPCO factory-assembled and field-erected towers including AT, LSTE and UT/UAT series equipment. Older installations may also carry Recold, Ceramic Cooling Tower or Tower Tech nameplates, particularly on legacy industrial sites.
Recognizing the manufacturer, model family and configuration early in the planning process matters because it affects component weights, structural attachment methods, fan and drive assembly designs, and how the unit can be safely broken down for removal.
What a Cooling Tower Removal Scope Actually Includes
A cooling tower removal project is rarely limited to disconnecting the unit and hauling it away. A complete scope typically includes isolating and draining condenser water piping, removing fans, motors, gearboxes and drive shafts, extracting fill media and drift eliminators, removing louvers and access doors, and dismantling the basin, casing panels and structural frame. On larger field-erected towers, this extends to structural steel supports, access platforms, ladders and stairs, and in some cases the concrete basin itself if the site is being fully cleared.
Associated systems often factor into the same project even when they are not part of the tower itself. Condenser water pumps, chemical treatment skids, makeup water piping, electrical disconnects and tower control panels frequently need to be addressed as part of a complete removal, particularly when the tower is being retired rather than replaced in kind. Coordinating this scope with the facility’s mechanical contractor or engineer early in the process helps avoid gaps between “who removes what” — a source of schedule friction on projects where a new tower is being installed at the same time an old one comes out.

Rooftop Access and Rigging Considerations
Rooftop cooling tower removal presents a different set of logistics than a ground-level or field-erected unit, and it is one of the project types we regularly see given the volume of mid-rise commercial and light-industrial buildings across the DFW region. Rooftop units are generally lighter and more modular than field-erected systems, but they still require careful planning around crane placement, roof loading, parapet clearance and adjacent equipment such as rooftop units, exhaust fans or solar arrays that may limit rigging paths.
Before mobilizing a crane, our team typically evaluates roof structural capacity for both the existing load and any temporary rigging loads, identifies the safest pick path to street level or a staging area, and confirms whether the unit can be removed in one piece or needs to be sectioned into casing panels, fill assemblies and a stripped structural frame. Sectioning is common on larger rooftop towers where crane capacity, boom radius or site access does not support a single pick. Fan motors, gearboxes and drive shafts are usually removed separately regardless of pick strategy, both to reduce rigging weight and because these components often carry separate salvage or scrap value.
Field-erected towers introduce additional considerations. These units are built in place and are not designed to be lifted as a single assembly, so removal typically involves sequential dismantling — starting with fan decks, fill sections and casing panels, then working down through the structural frame to the basin. Where a tower sits within an active plant, coordinating isolation, fall protection, and work-zone boundaries around neighboring operations is a significant part of the planning conversation before any physical work begins.
Sequencing Around an Active Facility
Very few cooling tower removal projects happen at a facility that is completely shut down. More often, the tower serves a building, process line or campus that continues operating during some or all of the removal work, which makes sequencing and isolation planning central to a successful project. Condenser water systems typically need to be drained, flushed and isolated before mechanical disconnection begins, and any parallel or standby cooling capacity should be confirmed before the primary tower goes offline — particularly during warmer months when cooling load is highest.
Electrical disconnection of fan motors, controls and any associated pumps should be coordinated with facility engineering or an electrical contractor to confirm lockout points and verify the equipment is fully de-energized before rigging work begins. On sites with fire protection or chemical treatment systems tied to the tower, those systems also need to be addressed as part of the shutdown sequence rather than left connected to a partially dismantled unit. Establishing a clear work zone — including crane swing radius, material staging areas and pedestrian or vehicle routing around the site — is typically one of the first physical planning steps once the mechanical and electrical sequencing is confirmed.
Material Handling, Recycling and Asset Recovery
Cooling towers contain a meaningful amount of recoverable material, and identifying disposition options before demolition begins can affect the economics of a project. Structural steel, aluminum and galvanized casing panels, copper piping, and motor and gearbox assemblies typically carry recyclable or salvageable value depending on condition, completeness and current commodity markets. PVC fill media and drift eliminators are generally not salvageable and are handled as demolition debris, while fans, motors, gearboxes and drive components are evaluated individually — some units, particularly newer or well-maintained equipment, may have resale or reuse value rather than only scrap value.
We do not treat every component the same way by default. Before removal begins, our team typically evaluates what is present — manufacturer, approximate age, condition, and completeness of major components — to determine a reasonable disposition plan across resale, recycling and disposal. This evaluation also helps a facility understand, in general terms, how recoverable value may offset a portion of the removal cost, without treating that offset as guaranteed or predetermined.

Site Restoration and Turnover Requirements
Once the tower and associated equipment are removed, the finished condition of the site depends heavily on what happens next. A rooftop location being prepared for a new tower installation typically needs a clean, structurally sound curb or platform and capped piping stubs ready for the new equipment. A rooftop location returning to general roof use may require patching, flashing repair or coordination with a roofing contractor to restore the membrane around the former tower footprint. Ground-level or field-erected tower locations being cleared for redevelopment may require basin demolition, concrete removal and grading to bring the area to a usable condition.
Confirming the required turnover condition early — new equipment installation, general reuse, or site clearing — allows the removal scope to be planned correctly from the start rather than requiring rework after the fact.
Recent Projects: Cooling Tower Removal Across North Texas
Our experience with cooling tower removal spans both rooftop and field-erected installations across commercial, institutional and industrial facilities. On a rooftop project involving a multi-cell factory-assembled tower nearing 20 years of service, our team coordinated condenser water isolation with the building’s mechanical contractor, sectioned the tower into manageable components for crane removal given limited roof access, and separated recoverable structural steel and motor components from non-recyclable fill media prior to disposal. The work was sequenced to allow a replacement tower to be craned into the same footprint within the same mobilization window, minimizing the building’s total cooling downtime.
On a separate project involving a field-erected, multi-cell tower at an industrial site being partially decommissioned, our approach involved a phased dismantling sequence — starting with fan decks and fill sections, then structural steel, and finally the concrete basin — coordinated around an adjacent production area that remained operational throughout the project. Work of this type typically requires close coordination with facility engineering staff to confirm isolation points and maintain safe clearances from active operations throughout the dismantling sequence.
This mix of rooftop and field-erected conditions reflects the broader building stock across the DFW region — from aging commercial structures reaching replacement age to active manufacturing and process facilities managing ongoing equipment turnover.
Serving Dallas, Fort Worth and the Surrounding Metroplex
USA Decom provides cooling tower removal services throughout the Dallas–Fort Worth Metroplex, including Dallas, Fort Worth, Arlington, Plano, Irving, Grand Prairie, Garland and surrounding communities. The region’s mix of commercial office and retail buildings, large-scale distribution and logistics facilities, manufacturing plants and data center infrastructure means cooling tower removal needs vary considerably from one project to the next — from a single rooftop unit on a mid-size commercial building to a multi-cell field-erected system supporting an industrial process plant. Our approach adjusts to that variation rather than applying a single standard scope to every project.
What We Need to Evaluate Your Cooling Tower Removal Project
To provide a meaningful project review, it helps to understand a few basics: the manufacturer and model or approximate size of the tower (in tons, if known), whether it is rooftop or ground/field-erected, single-cell or multi-cell, the general condition and age of the unit, site access conditions including roof access or crane setup space, whether the facility will remain operational during the work, and your target timeline — particularly if removal needs to coincide with a replacement unit installation or a broader shutdown schedule. Photographs of the tower, its access points and surrounding site conditions are also useful if available.
Use the form below to tell our team about the facility, the cooling tower equipment involved, and your project timeline. We’ll follow up to discuss scope, sequencing and next steps for your removal project.