A cooling tower rarely comes down on its own schedule. It comes down because a plant is converting to a new process cooling system, a building is being repositioned, a chiller plant is being consolidated, or a tower has simply reached the end of its service life and is being replaced with a more efficient factory-assembled unit. Whatever the trigger, removing a cooling tower is a different project than removing most other pieces of mechanical equipment. Towers sit at height, hold standing water, carry significant dead weight in wet operation, and are frequently tied into condenser water piping, structural steel and electrical systems that were never designed to be disturbed.

USA Decom provides cooling tower removal and decommissioning services for industrial plants, manufacturing sites, commercial high-rises, hospitals, campuses and process facilities throughout California. Our team works with facility engineers, mechanical contractors, general contractors and property owners to plan and execute the disconnection, dismantling, rigging and removal of open-circuit, closed-circuit, crossflow, counterflow, induced-draft and forced-draft towers, including factory-assembled units and field-erected structures.

Why California Facilities Are Replacing and Removing Cooling Towers

Cooling towers across California’s industrial base, manufacturing plants, food and beverage facilities, hospitals and large commercial properties age out of service for a mix of reasons. A tower built on fill media and drive components no longer supported by the original manufacturer often becomes more expensive to maintain than to replace. In other cases, the driver is a facility closure, a chiller plant upgrade, a process change that eliminates the cooling load entirely, or a property redevelopment where rooftop or yard-mounted mechanical equipment has to be cleared before the site changes use. Water-use considerations in California have also pushed some owners toward newer tower designs with lower drift rates and improved efficiency, which means an older basin, fill pack and eliminator assembly may be replaced well before it fails outright.

Equipment and Systems We Remove

Cooling tower removal projects typically involve more than the tower cabinet itself. A complete scope generally includes:

  • Fans, motors, gearboxes and drive shafts — including belt-drive and gear-drive assemblies such as those used on Marley NC and older Marley-brand towers, which require lockout, disassembly and controlled lowering from the fan deck
  • Fill media and drift eliminators — PVC fill packs and eliminator assemblies removed and segregated before structural dismantling begins
  • Basins, sumps and float/makeup assemblies — steel or concrete cold-water basins, along with associated overflow, drain and makeup piping
  • Louvers, casing panels and access doors — fiberglass, galvanized steel or stainless casing sections removed in manageable sections for lowering or hand-carrying

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

  • Structural steel, platforms and ladders — support steel, catwalks, guardrails and access ladders anchoring the tower to a roof curb, equipment pad or dedicated structural frame
  • Condenser water piping and valves — supply and return piping, isolation valves and expansion joints tying the tower into the chiller plant or process loop
  • Pumps and controls — condenser water pumps, VFDs, tower control panels, vibration switches and water treatment skid connections
  • Crane picks and rigging hardware — spreader bars, tag lines and lifting lugs used to remove sectional or modular components intact where feasible

On field-erected towers, this scope can extend to internal fill support structures, distribution basins and larger structural bays built up over multiple construction phases rather than delivered as a single package.

Rooftop and Field-Erected Removal: Two Different Projects

Rooftop cooling tower removal and field-erected tower removal require different planning, and we treat them as distinct projects rather than variations of the same task.

Rooftop towers are common on hospitals, hotels, office towers and mixed-use buildings throughout California’s urban markets. Removal usually means working within tight roof access, coordinating crane picks over occupied floors or adjacent streets, protecting roof membranes, and sequencing disassembly so components fit through roof hatches, screen walls or over parapets. Weight limits on the roof structure, wind exposure during lifts, and proximity to other rooftop mechanical equipment all factor into how a rooftop tower gets broken down and staged for removal.

Field-erected towers, more common at refineries, power generation sites, large manufacturing plants and process facilities, are built in place from structural steel, FRP or wood components and can span multiple cells with combined capacities well into the thousands of tons. Removing a field-erected tower is closer to a structural demolition project than an equipment removal: it involves sequenced disassembly of framing, decking, fill support structure and mechanical equipment, often coordinated with a working plant that cannot lose cooling capacity on adjacent systems during the removal window.

Between these two extremes sit factory-assembled units in the 100- to 1,500-ton range — towers such as SPX Cooling Technologies’ Marley NC and NC Everest crossflow lines, Marley MD and MD Everest counterflow units, and comparable Baltimore Aircoil Series 3000 crossflow and Series 1500/PT2 counterflow towers, along with EVAPCO AT and UT/UAT lines. These typically arrive and are removed as sectional or modular assemblies, which can simplify rigging compared with a field-erected structure but still require careful crane planning given their height, weight when wet, and rooftop or elevated pad locations.

Shutdown Sequencing and Utility Isolation

Before any physical dismantling begins, the tower and its associated systems need to be isolated. That generally means:

1. Confirming the tower is off-line and the process or chiller plant loop is isolated at the appropriate valves

2. De-energizing and lockout/tagout of fan motors, pumps, controls and any associated VFD or switchgear

3. Draining the basin, sump and connected piping, and managing that water in accordance with applicable discharge requirements

4. Disconnecting condenser water piping at flanged or grooved connections, and capping or blanking active lines that remain in service elsewhere in the plant

5. Verifying that water treatment chemical feed systems and blowdown lines tied to the tower are shut down and isolated

Facilities that operate other cooling towers or chillers on a shared loop need this sequencing coordinated carefully so the removal of one cell or one tower doesn’t interrupt cooling capacity elsewhere in the plant. On multi-cell installations, it’s common to isolate and remove one cell at a time while the remaining cells stay in service, which changes the crane logistics and schedule compared with a single-tower shutdown.

Access, Rigging and Crane Logistics

Cooling towers are almost always positioned somewhere that makes access difficult by design — on a roof, on a dedicated equipment pad behind a building, on a mezzanine structure, or elevated on structural steel above grade. Planning the removal starts with the access question: can a crane set up close enough for a direct pick, or does the tower need to be broken down into smaller components that can be carried, dollied or lowered through an interior path?

Key logistics considerations include:

  • Crane capacity and reach relative to the tower’s location, wet operating weight and lift radius
  • Whether components can be picked whole (common on smaller factory-assembled towers) or must be cut and sectioned
  • Protection of roofing, parapets, adjacent equipment and building facades during rigging and lowering
  • Coordination with building management or plant operations for crane staging, street closures or occupied-space protection
  • Sequencing the removal of casing, internals and structural steel so each lift is properly rigged and balanced
  • Fall protection and work-at-height planning for personnel accessing fan decks, basins and structural framing during disassembly

Every one of these items affects schedule and cost, which is why we ask for specifics on tower location, roof or grade access, crane staging area and site constraints as early in the conversation as possible.

Recycling and Asset Recovery Opportunities

Cooling towers generate meaningful scrap and salvage value once they’re broken down, and identifying that value before demolition begins can offset part of the removal cost. Structural steel, galvanized casing panels and copper or brass fittings from piping and controls typically carry recyclable scrap value. Fan motors, gearboxes, VFDs and control panels are sometimes suitable for resale or reuse depending on age, condition and manufacturer support, particularly on towers that were well maintained before being taken out of service. PVC fill media and FRP components are generally not resalable but can often be segregated for appropriate recycling or disposal rather than mixed demolition debris.

We evaluate recoverable value as part of scope development rather than assuming every component is scrap. The condition, completeness, age and manufacturer of the mechanical equipment all factor into what has resale or reuse potential versus what moves to recycling.

Recent Projects

Cooling tower removal work spans a wide range of facility types, from a single rooftop unit on a mid-rise commercial building to multi-cell field-erected installations at process plants. On a typical rooftop removal, our team coordinates roof access, crane staging on an adjacent street or lot, and sequenced disassembly of casing, fill and structural components so each section can be lowered without exceeding roof loading limits. On larger industrial projects, work often involves isolating one cooling tower cell at a time while adjacent cells remain in service, draining and disconnecting condenser water piping, and dismantling structural steel in a sequence coordinated with the plant’s ongoing operations. In both scenarios, segregating recoverable steel, copper and mechanical components from non-recoverable fill and casing material is part of the standard approach to controlling disposal costs and capturing available scrap and resale value.

Serving Industrial and Commercial Facilities Across California

USA Decom provides cooling tower removal and decommissioning services throughout California’s major industrial and commercial markets, including the Los Angeles and Inland Empire logistics and manufacturing corridor, the San Francisco Bay Area’s technology and life sciences campuses, the Central Valley’s food processing and agricultural production facilities, San Diego’s biotech and defense manufacturing base, and refining, power generation and heavy industrial sites along the Central Coast and in the Sacramento Valley. Whether the project is a single rooftop unit in a dense urban core or a multi-cell field-erected tower at a process facility in the Central Valley, our team scopes each project around the facility’s specific access, shutdown and logistics conditions.

Regulatory and Water System Considerations

Cooling towers in California may be subject to water discharge, air quality and, in some jurisdictions, water-management or Legionella-related registration requirements. These requirements can affect how basin water is drained and disposed of, how the tower is decommissioned versus temporarily taken off-line, and what documentation may be needed before or after removal. Applicable requirements vary by facility, jurisdiction and disposal pathway, so project planning should account for the specific rules that apply to a given site rather than assuming a single statewide standard.

What We Need to Scope Your Cooling Tower Removal

Cooling tower removal projects are priced and scheduled around a specific set of site conditions, so the more detail we have up front, the more accurate the scope and schedule. Helpful information includes:

  • Tower manufacturer, model and approximate tonnage or number of cells
  • Whether the tower is factory-assembled/modular or field-erected
  • Rooftop, grade-level or elevated structural mounting
  • Crane access and staging conditions at the site
  • Whether the facility will remain operational during removal, and whether adjacent towers or chillers must stay in service
  • Target schedule, including any lease, shutdown or turnover deadlines
  • Photographs of the tower, access path and surrounding site conditions

Tell Us About Your Cooling Tower Project

If you’re planning to remove, replace or decommission a cooling tower anywhere in California, use the form below to tell our team about the facility, the tower’s size and location, current access conditions and your target schedule. That information lets us put together a scope that accounts for the rigging, shutdown sequencing and logistics specific to your site.

Related Posts