Cooling Tower Removal Services in Arlington, Texas

Arlington sits in the middle of one of the most industrially dense corridors in North Texas, wedged between Dallas and Fort Worth and shaped by decades of heavy manufacturing, warehousing and commercial development. General Motors’ assembly plant has anchored a portion of that industrial base for generations, and the surrounding area has grown into the Great Southwest Industrial Park, the Highway 360 corridor and the broader Mid-Cities region stretching between Dallas Fort Worth International Airport and downtown Fort Worth. Plants, distribution centers, hospitals, hotels, office campuses and entertainment venues throughout the area all rely on mechanical cooling systems, and a large share of those systems include a cooling tower that eventually reaches the end of its service life.

When a tower is replaced, a plant is downsized, a building is repurposed or a chiller plant is decommissioned, the old tower still has to come out. That’s where our team comes in. USA Decom provides cooling tower removal services for open-circuit, closed-circuit and field-erected towers throughout Arlington and the surrounding Metroplex, handling everything from a single rooftop unit above a distribution center to a multi-cell, field-erected structure serving an industrial process.

Why Cooling Towers Get Pulled Out of Service

Cooling towers are mechanical equipment, and every mechanical system eventually reaches a point where continued operation no longer makes sense. In a market with Arlington’s mix of manufacturing, logistics and commercial real estate, common triggers for removal include:

  • Equipment age and corrosion. Basins, fill sections, structural steel and drift eliminators degrade over years of exposure to water treatment chemicals, humidity and Texas summer heat cycling.
  • Chiller plant replacement. When a facility upgrades its central plant, the associated open-circuit or closed-circuit tower is frequently replaced at the same time.
  • Facility closure or repurposing. A manufacturing building converting to warehouse or flex-industrial use may no longer need the process cooling load the original tower supported.
  • Capacity mismatch. Production changes can leave a tower oversized or undersized for current cooling demand, prompting removal and reconfiguration.

If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.

  • Rooftop structural concerns. Aging rooftop-mounted towers sometimes require removal ahead of roof replacement or structural work, independent of the tower’s mechanical condition.

Regardless of the reason, the removal itself carries its own set of planning, rigging and logistics requirements that are different from removing other mechanical equipment.

Types of Cooling Towers We Remove

Cooling tower removal scope changes significantly depending on the type and size of the unit. We work on:

  • Factory-assembled crossflow and counterflow towers, including package units and induced-draft designs commonly installed on rooftops or at grade adjacent to a mechanical yard.
  • Field-erected towers, including multi-cell installations built up from structural steel, fill bays, basins and mechanical equipment assembled on site rather than shipped as a complete unit.
  • Closed-circuit fluid coolers, which combine a coil bundle with evaporative cooling and often carry additional piping and structural considerations during teardown.
  • Modular and forced-draft units used in smaller mechanical rooms or where space or noise constraints limited the original tower selection.

Equipment from manufacturers such as SPX Cooling Tech / Marley, Baltimore Aircoil Company (BAC) and EVAPCO makes up a large share of the towers installed in commercial and light-industrial buildings across North Texas, and each product line has its own structural layout, fill and eliminator configuration, and mechanical drive arrangement. SPX’s Marley NC line is a widely used crossflow platform, and the Marley NC Everest offers a pre-assembled crossflow alternative to a comparably sized field-erected structure. BAC’s Series 3000 and Series 1500 lines and EVAPCO’s AT and UT/UAT series are similarly common across Metroplex mechanical rooms and rooftops, and each has a slightly different disassembly sequence depending on casing material, fill construction and drive configuration. Knowing which platform is installed helps our team plan rigging points, disconnection sequence and disposition of recoverable components before the crew arrives on site.

What Cooling Tower Removal Actually Involves

A cooling tower is rarely a simple lift-and-haul job. Even a modest rooftop unit typically involves:

1. Isolation and drain-down of condenser water piping, makeup water lines and chemical treatment feeds, coordinated with facility operations or the mechanical contractor of record.

2. Disconnection of mechanical components — fan motors, gearboxes or belt drives, drift eliminators, fill media, louvers and basin sumps.

3. Structural disassembly of casing panels, access doors, ladders, platforms and, on field-erected towers, the structural steel or fiberglass-reinforced plastic frame itself.

4. Rigging and lifting, whether that means a rooftop crane pick over a building, a controlled lower through an equipment hatch, or section-by-section disassembly of a field-erected cell too large to remove in one piece.

5. Load-out and transportation of scrap steel, motors, gearboxes and other recoverable components, along with proper handling of fill media and any remaining water treatment chemicals.

6. Site restoration, including curb caps, structural infill, piping stub-outs and cleanup of the former tower footprint to the condition required for the next use of the space.

Rooftop removals present their own access and rigging challenges — parapet heights, roof loading limits, adjacent rooftop equipment and available crane setup area all factor into the lift plan. Field-erected towers add structural considerations, since these units were built in place and often cannot be removed as a single piece without partial disassembly first. On both project types, sequencing the mechanical disconnects before rigging begins keeps the schedule predictable and avoids surprises once the crew is on the roof or at height.

Asset Recovery Considerations

Not every component of a decommissioned cooling tower is scrap. Depending on condition, age and market demand, recoverable materials and equipment can include:

  • Fan motors and gearboxes/drive assemblies in usable condition
  • Copper or aluminum coil bundles from closed-circuit units
  • Structural steel and stainless-steel basins as scrap-grade material
  • Control panels, VFDs and instrumentation where still functional
  • Complete or near-complete tower cells in some cases, where a functioning unit may have secondary-market value rather than scrap value alone

We evaluate recoverable value as part of the removal scope, and where equipment or material has resale or scrap value, that recovery can help offset a portion of the overall project cost. We don’t promise a specific return on every project — condition, completeness and current commodity pricing all affect outcomes — but identifying recovery opportunities before demolition begins is part of how we approach these projects.

Working Around an Active Facility

Most cooling tower removals in Arlington happen while the rest of the building stays in operation. A distribution center doesn’t stop shipping because the roof-mounted tower is being replaced, and a manufacturing plant rarely shuts down entirely for a mechanical-room project. That means scope planning has to account for:

  • Maintaining cooling to any systems that remain in service during a phased tower replacement
  • Coordinating crane mobilization and rooftop access without disrupting loading docks, parking or building entrances
  • Scheduling noisy or disruptive work — cutting, rigging, crane picks — around business hours when needed
  • Protecting adjacent rooftop equipment, walkways and roofing membrane during rigging and material staging
  • Communicating clearly with facility engineering, property management or the general contractor managing the broader project

Every one of these considerations gets easier when the scope is defined clearly up front, which is why we ask for as much project detail as possible before finalizing an approach.

Projects in Action

Cooling tower removal projects vary widely in scope, but a few patterns show up repeatedly in work of this type. On a distribution center rooftop replacement, the sequence often starts with draining and isolating condenser water piping, followed by disconnecting the fan motor and gearbox, removing fill media and eliminators, and then cutting the casing into sections small enough to rig through a roof hatch or crane pick without disturbing adjacent rooftop units or ductwork. On a field-erected, multi-cell tower serving a manufacturing plant, the project typically requires more structural planning — disassembling steel cross-bracing, basin sections and drive systems in sequence so the remaining structure stays stable throughout the teardown, and coordinating crane picks around an operating plant that can’t fully shut down for the work.

In both scenarios, recoverable materials get sorted and staged separately from demolition debris, and any functioning motors, gearboxes or control components are evaluated for resale or reuse before the remaining structure is scrapped. Projects like these reinforce a consistent lesson: the disconnection and disassembly sequence matters as much as the final rigging pick, and skipping steps to save time usually costs more time later.

Local and Regional Considerations

Arlington’s position between Dallas and Fort Worth means projects here often connect to work happening throughout the surrounding communities — Grand Prairie, Mansfield, Irving, Fort Worth, Euless, Bedford, Hurst and the broader Mid-Cities and Great Southwest submarkets. Facilities along the Highway 360 and I-20 corridors, near DFW Airport’s southern approach, and throughout the industrial areas surrounding Great Southwest Parkway commonly include rooftop or ground-mounted cooling towers supporting HVAC and process loads. We provide cooling tower removal services throughout Arlington and this wider North Texas industrial footprint, and Texas summers bring their own scheduling considerations — extended heat can affect crew safety planning, rigging timelines and how quickly a facility needs replacement cooling brought back online.

What to Gather Before You Request a Quote

The more information we have up front, the faster and more accurate our scope development can be. Before reaching out, it’s helpful to have on hand:

  • Manufacturer and model, if known (a nameplate photo works well)
  • Tower type — crossflow, counterflow, open-circuit, closed-circuit, factory-assembled or field-erected
  • Approximate tonnage or number of cells
  • Mounting location — rooftop, grade-level pad, mechanical yard or penthouse
  • Current operating status (in service, idle, already disconnected)
  • Site access conditions — crane staging area, roof access, elevator or hoist availability
  • Target removal timeline or any related shutdown/replacement schedule
  • Photos of the tower, surrounding roof or site area, and any nameplate data

None of this needs to be exact. Even rough answers help our team put together a realistic scope and identify what to look for during a site visit.

Tell Us About Your Project

Whether you’re replacing a single rooftop unit, decommissioning a multi-cell field-erected tower, or clearing mechanical equipment ahead of a larger facility project, USA Decom can evaluate the scope and put together a removal plan built around your site and schedule. Use the form below to tell our team about the facility, the tower type and size, site access conditions and your target timeline, and we’ll follow up to discuss next steps.