A cooling tower rarely fails or comes offline on its own schedule. More often, the decision to remove one is tied to a plant shutdown, a chiller plant upgrade, a process change that eliminates the condenser-water load, or a facility that has simply outgrown a tower installed decades ago. Whatever the reason, once a tower is slated for removal, the facility is left with a structure full of steel, fill media, motors, gearboxes and piping that has to come down safely, get off the roof or pad, and go somewhere — whether that’s a scrap yard, a secondary equipment market or a landfill.
USA Decom provides cooling tower decommissioning and removal services for industrial, manufacturing, food processing, energy and institutional facilities in Amarillo and across the Texas Panhandle. Our approach treats every tower removal as an asset-recovery project first and a demolition project second, because the disposition decisions made early in planning have a direct effect on schedule, cost and how much value can be recovered from the equipment before it’s scrapped.
Why Cooling Towers Come Out of Service in Amarillo Facilities
Amarillo’s industrial base includes food and beef processing operations, energy infrastructure tied to the region’s oil, gas and wind-power sectors, manufacturing facilities and government and defense-related installations in the surrounding area. Many of these operations rely on condenser-water cooling towers to support chillers, process cooling, compressor packages or HVAC systems that serve large plant footprints.
Cooling towers in this category typically come out of service for a handful of practical reasons:
- A chiller plant or process cooling system is being replaced with equipment that no longer requires the existing tower capacity or configuration
- A production line, refrigeration system or process the tower supported has been shut down or relocated
- The tower has reached the end of its structural or mechanical service life and a full plant HVAC upgrade calls for removal rather than repair
If you have a project coming up, use the form below to tell our team about the facility, equipment and schedule.
- A facility is being closed, sold, repurposed or consolidated and the rooftop or pad-mounted tower is part of the overall decommissioning scope
- A field-erected, multi-cell tower installation is being downsized to match a smaller current cooling load
In each of these scenarios, the tower removal needs to be planned around the same considerations: what’s staying in service nearby, what has to be isolated first, how the components come down, and what happens to the equipment and materials once they’re on the ground.
What a Cooling Tower Removal Project Actually Involves
A cooling tower is a mechanical, structural and hydraulic system rolled into one package, and the removal scope typically touches all three:
Mechanical components — fans, fan motors, gearboxes or belt drives, drive shafts, and in some cases variable-frequency drives or controls packages tied to fan speed.
Water-side components — hot water distribution basins or spray systems, fill media (film fill or splash fill depending on the tower type), drift eliminators, cold water collection basins, makeup and blowdown piping, and in many cases basin heaters or level controls.
Structural components — casing panels, louvers, access doors, internal structural framing, platforms, ladders, handrails and, on field-erected towers, structural steel or FRP support frameworks that may be integrated with the roof or a dedicated equipment pad.
Piping and interconnections — condenser-water supply and return piping, isolation valves, chemical treatment feed lines, and electrical conduit and disconnects feeding the fan motors and controls.
Before any physical removal begins, the system needs to be properly isolated. Condenser-water piping has to be drained and blanked or capped, electrical circuits to fan motors and basin heaters have to be locked out, and any chemical treatment or water treatment equipment tied to the tower has to be disconnected. On a rooftop tower, this isolation work often needs to happen without disrupting HVAC or process cooling that serves occupied or operating areas of the building — a scheduling and sequencing conversation as much as a technical one.

Rooftop Tower Removal: Access, Rigging and Sequencing
A significant share of the cooling towers our team evaluates for removal are rooftop-mounted, and rooftop removals carry their own set of logistics. Roof-mounted towers are usually accessed by crane, and the crane pick has to account for:
- Roof structural loading, both for the crane’s outriggers if positioned near the building and for any temporary staging of tower components on the roof itself
- Available laydown area on the roof for disassembly before pieces are picked and lowered
- Rigging points and lift weights for casing sections, basins and structural framing, which can be heavier than they appear once wet materials, sludge or scale are factored in
- Coordination with roofing, waterproofing and structural personnel if the tower’s curb, dunnage or support steel is being modified or removed along with the tower
- Site access for the crane itself, including street permits, overhead utility clearance and staging area for trucks
Field-erected, multi-cell towers on grade-level pads present a different but equally demanding set of considerations. These installations can span a large footprint with crossflow or counterflow cell arrangements, and structural steel disassembly has to be sequenced so that partially disassembled sections remain stable throughout the process. Towers built by manufacturers such as SPX/Marley or BAC in a field-erected configuration were engineered as complete structural systems, and removal has to reverse that engineering logic in a controlled, deliberate sequence rather than simply cutting the structure apart section by section.
Common Cooling Tower Types and Manufacturers We Encounter
Industrial and commercial cooling towers vary significantly in configuration, and identifying the type and manufacturer early in project planning helps determine both the removal approach and what the equipment may be worth on the secondary market. Towers our team commonly encounters include:
- Factory-assembled, single-piece towers from manufacturers such as BAC (Baltimore Aircoil), including crossflow designs in the Series 3000 and Series 1500 platforms, and SPX/Marley factory-assembled models in the NC and AV lines
- Field-erected towers, often multi-cell installations built up on site rather than shipped as a complete unit, common at larger industrial and energy facilities
- Closed-circuit fluid coolers, which combine a cooling tower with a closed coil circuit and are used where process fluid can’t be exposed to open recirculating water
- Induced-draft and forced-draft configurations, which affect where the fan and motor assembly sits relative to the airflow path and change how that equipment is rigged out
- Crossflow and counterflow designs, which affect basin and fill orientation and, in turn, how the tower is sequenced for disassembly
Tower capacities in industrial service commonly range from smaller single-cell units in the 100- to 250-ton range up through 500-, 750- and 1,000-ton single cells, with multi-cell field-erected installations reaching well beyond 1,500 tons of combined capacity. Larger towers generally mean more structural steel, larger basin sections and heavier individual components — all of which factor into crane sizing, rigging plans and disposal logistics.
Asset Recovery: What Can Be Recovered Before the Tower Goes to Scrap
Not every component of a decommissioned cooling tower has to end up as scrap metal, and treating the entire structure as demolition debris can leave recoverable value on the table. Before cutting into structural steel or hauling components to a scrap yard, it’s worth evaluating the tower for:
Reusable or resalable mechanical equipment. Fan motors, gearboxes, drive assemblies and in some cases entire fan sections can retain resale value depending on manufacturer, condition, age and completeness — particularly on towers that were well maintained or recently serviced before being taken out of service.
Complete or near-complete tower cells. A tower cell or an entire single-cell factory-assembled unit that is structurally sound and mechanically intact may have value as a used unit for a smaller facility, an emergency replacement, or a secondary market buyer, rather than being cut apart on site.
Recyclable structural and casing materials. Cooling towers are often built from galvanized steel, stainless steel or fiberglass-reinforced plastic (FRP) casing panels. These materials separate into different scrap and recycling streams, and segregating them on site — rather than mixing everything into a single demolition load — generally improves recovery value.
Copper and non-ferrous components. Motor windings, electrical conduit, wiring and certain fittings contain recoverable copper and other non-ferrous metals that carry separate commodity value from structural steel.
Controls and electrical components. VFDs, motor starters, control panels and instrumentation tied to the tower’s operation may have resale or reuse value depending on age and condition.
We don’t assume every tower will yield significant resale value — condition, age, manufacturer, completeness and current commodity pricing all play a role, and a tower that has sat idle and deteriorating for years is a different asset-recovery conversation than one that was recently in active, well-maintained service. What we do is evaluate the specific equipment before assuming everything goes to the scrap bin, and structure the removal sequence to protect and separate anything with resale or recycling value along the way.
Recycling and Material Segregation
Even components without resale value still carry material value once properly segregated. A cooling tower removal generates several distinct scrap streams — structural and galvanized steel, stainless steel, non-ferrous metals, FRP or fiberglass casing material, and in some cases PVC fill media that has to be handled separately. Segregating these materials during dismantling, rather than combining everything into mixed demolition debris, generally improves the recovery value of ferrous and non-ferrous metal and can reduce disposal costs for materials that have no scrap value, such as fill media or degraded FRP panels.
Basin sludge, scale buildup and any residual water treatment chemicals also need to be addressed as part of removal, since these can affect both worker safety during dismantling and the handling requirements for basin components once they’re removed. Depending on project conditions, applicable local, state or federal requirements may govern how certain materials are handled, transported or disposed of.
Project Spotlight: Rooftop Tower Removal Supporting a Facility Upgrade

A project of this type often begins the same way: a facility replacing an aging chiller plant or process cooling system finds that the existing rooftop cooling tower no longer matches the new equipment’s capacity or footprint. On similar projects, our team typically starts with a site walk to confirm tower type, dimensions, access route and crane staging options, then develops a sequence that isolates condenser-water piping and electrical feeds, removes fill media and internal components first to reduce lift weights, and stages structural sections for crane pick once the tower is stripped down.
Recoverable fan motors and drive components are pulled and set aside for evaluation before structural cutting begins, and steel and FRP casing material are segregated into separate loads as sections come off the roof. The finished scope typically leaves the roof curb and any remaining structural penetrations ready for the mechanical contractor installing the replacement equipment, closing out the tower removal cleanly before the next phase of the project begins.
Coordination with Your Project Team
Cooling tower removal rarely happens in isolation. It’s usually one piece of a larger mechanical upgrade, plant shutdown or facility renovation involving mechanical contractors, roofing contractors, structural engineers, and sometimes the tower manufacturer’s service representative if warranty or engineering questions come up on a field-erected system. We coordinate removal sequencing and scheduling around the rest of your project team’s timeline, whether that means completing the removal before a new chiller plant installation begins, working around an active production schedule elsewhere in the facility, or timing the work around seasonal cooling-load requirements.
Serving Amarillo and the Texas Panhandle
USA Decom provides cooling tower decommissioning and removal services to facilities throughout Amarillo and the surrounding Texas Panhandle region, including Canyon, Borger, Pampa, Dumas and Hereford, along with the broader network of industrial, agricultural-processing and energy-related facilities across the area. We work with facility managers, plant engineers, mechanical contractors and property owners managing equipment upgrades, plant shutdowns or facility repurposing projects that include cooling tower removal as part of the overall scope.
Tell Us About Your Cooling Tower Project
If you’re planning to remove a cooling tower in Amarillo or elsewhere in the Panhandle, use the form below to tell our team about the facility, the tower’s manufacturer and size if known, whether it’s roof-mounted or on a grade-level pad, the project timeline, and any site access or crane staging considerations we should know about. Photos of the tower and surrounding access route are helpful if you have them. We’ll use that information to evaluate the scope, discuss disposition options for reusable and recyclable equipment, and put together a plan for the removal.